[1]
Editor's note–Former article A2.000 pertaining to building and construction fees was amended in its entirety and replaced with similar provisions by Ordinance 24-0613D adopted 6/13/2024. Prior to the replacement, this article derived from the following: 1999 Code, app. A, secs. 1.200, 1.500, 1.600; Ordinance 18-0412B adopted 4/12/18; Ordinance 21-0909 adopted 9/9/21; .
Includes new construction, additions, remodels, and interior finish-outs for commercial, industrial, mixed-use, multifamily residential, and any other type of construction requiring a permit that is not addressed by a fee in this article.
(1)
Plan review fee: 65 percent of the permit fee (nonrefundable fee due with application).
(Ordinance 24-0613D adopted 6/13/2024)
(a)
Includes new construction, additions, remodels and interior finish-outs of accessory buildings, including agricultural structures, and remodels and additions of areas not to include conditioned heat and air to single-family and two-family residential dwellings.
(b)
Detached accessory building used as tool and storage sheds, playhouses, and similar uses are exempt from the requirement of a building permit provided the floor area does not exceed 120 sq. ft.
(Ordinance 24-0613D adopted 6/13/2024)
All permit fees based on value of construction shall use the following schedule to determine the fee. Applicants shall provide the actual value of construction on the permit application. However, the town building official will make the final determination of construction value.
Total Valuation | Fees |
|---|---|
$1.00 to $500.00 | $23.50 |
$501.00 to $2,000.00 | $23.50 for the first $500.00 + $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00 |
$2,001.00 to $25,000.00 | $69.25 for the first $2,000.00 + $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 |
$25,001.00 to $50,000.00 | $391.75 for the first $25,001.00 + $10.00 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 |
$50,001.00 to $100,000.00 | $643.75 for the first $50,001.00 + $7.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 |
$100,001.00 to $500,000.00 | $993.75 for the first $100,000.00 + $5.60 for each additional $1,000.00 or fraction thereof, to and including $500,000.00 |
$500,001.00 to $1,000,000.00 | $3,233.75 for the first $500,000.00 + $4.75 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 |
$1,000,001.00 and up | $5,608.75 for the first $1,000,001.00 + $3.65 for each additional $1,000.00 or fraction thereof. |
(Ordinance 24-0613D adopted 6/13/2024)
(a)
Energy code review: $400.00.
(b)
Structure demolition permit: $100.00.
(c)
Structure moving permit: $100.00.
(d)
Tree removal permit: $100.00.
(e)
Certificate of occupancy: $100.00 (charged only when no permit issued for construction).
(f)
Fence permit: $100.00.
(g)
Sign: $100.00.
(h)
Temporary sign: $25.00.
(k)
Fire plan review/inspection: $250.00 minimum; all expenses for town staff work hours expended will require full reimbursement by the applicant.
(Ordinance 24-0613D adopted 6/13/2024)