[Amended 7-13-1978]
No connection shall be made with the Town water system until a permit therefor shall first be issued by the Town Clerk. The required connection fee shall be due on the date the application is made. The fee paid at the time of application shall be valid for one year and at the expiration date shall be re-evaluated to conform with prevailing connection rates.