The schedules of permits and fees as set forth in RCW 46.44 for use on state primary and secondary highways shall be adopted as the schedule of permits and fees for all county roads.
(Vol. M, p. 27, 1959).
Any applicant who has secured the necessary permit and paid the scheduled fees to the State Highway Commission for vehicular movement into the county may be issued a similar permit to continue said vehicular movement over county roads as designated by the county engineer or his representative and no additional fee will be charged.
(Vol. M, p. 27, 1959).
All said permits for vehicular movement originating on county roads shall be issued by the county engineer or his representative, and fees as scheduled in RCW 46.44 shall be collected and deposited in the county road fund.
(Vol. M, p. 27, 1959).
The following schedule of fees and outline of procedure for issuing permits in the county is adopted:
Overlegal Permits
1. 
County Permits.
a. 
Log tolerance, per truck, five dollars each.
b. 
Overload permits (seasonal - emergency), one dollar each.
c. 
Overweight: minimum charge is five dollars or rate per mile, whichever is greater.
Pounds overweight
Amount Per Mile
6,000
$.10
12,000
.20
18,000
.30
24,000
.50
36,000
.90
over 36,000
1.10
d. 
Overlength, overheight, and excessive overhang - issue permit, no charge,
e. 
Overwidth: three-dollar charge for one trip or one hundred fifty dollars for annual permit per vehicle - twelve feet maximum.
2. 
County Permission on State Permits.
a. 
Building fourteen feet or over, additional charge: ten dollars for county permit,
b. 
Other permits, validate back of permit and make entry on county record sheet: no charge;
3. 
General Instructions.
a. 
Permits shall be issued for one vehicle and one trip only; except, overwidth permit may be issued on annual basis per vehicle.
b. 
In the case of an overlegal permit with more than one overlegal aspect, the charge will be for one overlegal aspect only, whichever is higher.
c. 
Permits must be paid in cash or by checks payable to the Kittitas County Department of Public Works before they are validated.
d. 
Permits shall be issued at the office of the department of public works, Room 108, Kittitas County Courthouse, Ellensburg, Washington, from eight a.m. to five p.m. Monday through Friday, except legal holidays.
e. 
Overlegal moving on county roads will be allowable during daylight hours only Monday through Saturday at noon, excluding all holidays, unless otherwise specified by the director of public works.
(Res. RD-6111, Vol. M, p. 324, 1961; Res. RD-26-79 1979; Res. RD-51-79; Res. DPW-1-82, 1982)