This article contains the rules for preparing environmental impact statements. The county adopts the following sections by reference, as supplemented by this part:
WAC |
197-11-400 Purpose of EIS. |
197-11-402 General requirements. |
197-11-405 EIS types. |
197-11-406 EIS timing. |
197-11-408 Scoping. |
197-11-410 Expanded scoping. |
197-11-420 EIS preparation. |
197-11-425 Style and size. |
197-11-430 Format. |
197-11-435 Cover letter or memo. |
197-11-440 EIS contents. |
197-11-442 Contents of EIS on nonproject proposals. |
197-11-443 EIS contents when prior nonproject EIS. |
197-11-444 Elements of environment. |
197-11-448 Relationship of EIS to other considerations. |
197-11-450 Cost-benefit analysis. |
197-11-455 Issuance of DEIS. |
197-11-460 Issuance of FEIS. |
(Ord. 2011-013, 2011)