1.
The survey of every proposed subdivision, boundary line adjustments, record of survey, and the preparation of preliminary and final plats thereof, shall be made by or under the supervision of a registered land surveyor who shall certify on the plat that it is a true and correct representation of the lands actually surveyed. All surveys shall conform to standard practices and principles for land surveying.
2.
The surveyor shall furnish the county engineer with a full set of survey notes upon request, which notes shall clearly show:
(Ord. 2005-31, 2005; Ord. 2022-005, 2022)