A. 
Floodplain Administrator designation. The Township Engineer from the Engineering Department is designated the Floodplain Administrator. The Floodplain Administrator shall have the authority to delegate performance of certain duties to other employees.
B. 
Authority. The Floodplain Administrator is authorized and directed to administer the provisions of this chapter. The Floodplain Administrator shall have the authority to render interpretations of this chapter consistent with the intent and purpose of this chapter and to establish policies and procedures in order to clarify the application of its provisions. Such interpretations, policies and procedures shall be consistent with the intent and purpose of this chapter and the flood provisions of the Building Code and shall not have the effect of waiving specific requirements without the granting of a variance pursuant to § 225-7 of this chapter.
C. 
Coordination. The Floodplain Administrator shall coordinate with the Construction Official to administer and enforce the flood provisions of the Uniform Construction Code.
D. 
Duties. The duties of the Floodplain Administrator shall include but are not limited to:
(1) 
Review all permit applications to determine whether proposed development is located in flood hazard areas established in § 225-2 of this chapter.
(2) 
Require development in flood hazard areas to be reasonably safe from flooding and to be designed and constructed with methods, practices and materials that minimize flood damage.
(3) 
Interpret flood hazard area boundaries and provide available flood elevation and flood hazard information.
(4) 
Determine whether additional flood hazard data shall be obtained or developed.
(5) 
Review required certifications and documentation specified by this chapter and the Building Code to determine that such certifications and documentations are complete.
(6) 
Establish, in coordination with the Construction Official, written procedures for administering and documenting determinations of substantial improvement and substantial damage made pursuant to § 225-4M of this chapter.
(7) 
Coordinate with the Construction Official and others to identify and investigate damaged buildings located in flood hazard areas and inform owners of the requirement to obtain permits for repairs.
(8) 
Review requests submitted to the Construction Official seeking approval to modify the strict application of the flood load and flood-resistant construction requirements of the Uniform Construction Code to determine whether such requests require consideration as a variance pursuant to § 225-7 of this chapter.
(9) 
Require applicants who submit hydrologic and hydraulic engineering analyses to support permit applications to submit to FEMA the data and information necessary to maintain the Flood Insurance Rate Maps when the analyses propose to change base flood elevations, flood hazard area boundaries, or floodway designations; such submissions shall be made within six months of such data becoming available.
(10) 
Require applicants who propose alteration of a watercourse to notify adjacent jurisdictions and the NJDEP Bureau of Flood Engineering, and to submit copies of such notifications to the Federal Emergency Management Agency (FEMA).
(11) 
Inspect development in accordance with § 225-6 of this chapter and inspect flood hazard areas to determine if development is undertaken without issuance of permits.
(12) 
Prepare comments and recommendations for consideration when applicants seek variances in accordance with § 225-7 of this chapter.
(13) 
Cite violations in accordance with § 225-8 of this chapter.
(14) 
Notify the Federal Emergency Management Agency when the corporate boundaries of the Township of Cranford have been modified.
(15) 
Permit ordinary maintenance and minor work in the regulated areas discussed in § 225-2B.
E. 
Use of changed technical data. The Floodplain Administrator and the applicant shall not use changed flood hazard area boundaries or base flood elevations for proposed buildings or developments unless the Floodplain Administrator or applicant has applied for a conditional letter of map revision (CLOMR) to the Flood Insurance Rate Map (FIRM) revision and has received the approval of the Federal Emergency Management Agency. A revision of the effective FIRM does not remove the related feature(s) on a flood hazard area delineation that has been promulgated by the NJDEP. A separate application must be made to the state pursuant to N.J.A.C. 7:13 for revision of a flood hazard design flood elevation, flood hazard area limit, floodway limit, and/or other related feature.
F. 
Other permits. It shall be the responsibility of the Floodplain Administrator to assure that approval of a proposed development shall not be given until proof that necessary permits have been granted by federal or state agencies having jurisdiction over such development, including Section 404 of the Clean Water Act.[1] In the event of conflicting permit requirements, the Floodplain Administrator must ensure that the most restrictive floodplain management standards are reflected in permit approvals.
[1]
Editor's Note: See 33 U.S.C. § 1251 et seq.
G. 
Determination of local design flood elevations.
(1) 
If design flood elevations are not specified, the Floodplain Administrator is authorized to require the applicant to:
(a) 
Obtain, review, and reasonably utilize data available from a federal, state, or other source; or
(b) 
Determine the design flood elevation in accordance with accepted hydrologic and hydraulic engineering techniques. Such analyses shall be performed and sealed by a licensed professional engineer. Studies, analyses, and computations shall be submitted in sufficient detail to allow review and approval by the Floodplain Administrator. The accuracy of data submitted for such determination shall be the responsibility of the applicant.
(2) 
It shall be the responsibility of the Floodplain Administrator to verify that the applicant's proposed best available flood hazard data Area and the local design flood elevation in any development permit accurately applies the best available flood hazard data and methodologies for determining flood hazard areas and design elevations described in §§ 225-2B and 225-10 respectively. This information shall be provided to the Construction Official and documented according to § 225-4N.
H. 
Requirement to submit new technical data. Base flood elevations may increase or decrease resulting from natural changes (e.g., erosion, accretion, channel migration, subsidence, uplift) or man-made physical changes (e.g., dredging, filling, excavation) affecting flooding conditions. As soon as practicable, but not later than six months after the date of a man-made change or when information about a natural change becomes available, the Floodplain Administrator shall notify the Federal Insurance Administrator of the changes by submitting technical or scientific data in accordance with 44 CFR 65.3. Such a submission is necessary so that upon confirmation of those physical changes affecting flooding conditions, risk premium rates and floodplain management requirements will be based upon current data.
I. 
Activities in riverine flood hazard areas. In riverine flood hazard areas where design flood elevations are specified but floodways have not been designated, the Floodplain Administrator shall not permit any new construction, substantial improvement or other development, including the placement of fill, unless the applicant submits an engineering analysis prepared by a licensed professional engineer that demonstrates that the cumulative effect of the proposed development, when combined with all other existing and anticipated flood hazard area encroachment, will not increase the design flood elevation more than 0.2 foot at any point within the community.
J. 
Floodway encroachment. Prior to issuing a permit for any floodway encroachment, including fill, new construction, substantial improvements and other development or land-disturbing activity, the Floodplain Administrator shall require submission of a certification prepared by a licensed professional engineer, along with supporting technical data, that demonstrates that such development will not cause any increase in the base flood level.
(1) 
Floodway revisions. A floodway encroachment that increases the level of the base flood is authorized if the applicant has applied for a conditional letter of map revision (CLOMR) to the Flood Insurance Rate Map (FIRM) and has received the approval of FEMA.
K. 
Watercourse alteration. Prior to issuing a permit for any alteration or relocation of any watercourse, the Floodplain Administrator shall require the applicant to provide notification of the proposal to the appropriate authorities of all adjacent government jurisdictions, as well as the NJDEP Bureau of Flood Engineering and the Division of Land Resource Protection. A copy of the notification shall be maintained in the permit records and submitted to FEMA.
(1) 
Engineering analysis. The Floodplain Administrator shall require submission of an engineering analysis prepared by a licensed professional engineer, demonstrating that the flood-carrying capacity of the altered or relocated portion of the watercourse will be maintained, neither increased nor decreased. Such watercourses shall be maintained in a manner that preserves the channel's flood-carrying capacity.
L. 
Development in riparian zones. All development in riparian zones as described in N.J.A.C. 7:13 is prohibited by this chapter unless the applicant has received an individual or general permit or has complied with the requirements of a permit by rule or permit by certification from NJDEP Division of Land Resource Protection prior to application for a floodplain development permit and the project is compliant with all other Floodplain Development provisions of this chapter. The width of the riparian zone can range between 50 feet and 300 feet and is determined by the attributes of the waterbody and designated in the New Jersey Surface Water Quality Standards N.J.A.C. 7:9B. The portion of the riparian zone located outside of a regulated water is measured landward from the top of bank. Applicants can request a verification of the riparian zone limits or a permit applicability determination to determine state permit requirements under N.J.A.C. 7:13 from the NJDEP Division of Land Resource Protection.
M. 
Substantial improvement and substantial damage determinations. When buildings and structures are damaged due to any cause including but not limited to man-made, structural, electrical, mechanical, or natural hazard events, or are determined to be unsafe as described in N.J.A.C. 5:23; and for applications for building permits to improve buildings and structures, including alterations, movement, repair, additions, rehabilitations, renovations, ordinary maintenance and minor work, substantial improvements, repairs of substantial damage, and any other improvement of or work on such buildings and structures, the Floodplain Administrator, in coordination with the Construction Official, shall:
(1) 
Estimate the market value or require the applicant to obtain a professional appraisal prepared by a qualified independent appraiser, of the market value of the building or structure before the start of construction of the proposed work; in the case of repair, the market value of the building or structure shall be the market value before the damage occurred and before any repairs are made.
(a) 
The Floodplain Administrator and/or designated professional staff shall use the following formula for estimating market value:
Market Value = Assessed Value of Existing Improvement's ÷ Equalization Ratio in effect as per the Township of Cranford's Tax Assessor.
(2) 
Determine and include the costs of all ordinary maintenance and minor work, as discussed in § 225-1E, performed in the floodplain regulated by this chapter in addition to the costs of those improvements regulated by the Construction Official in substantial damage and substantial improvement calculations.
(3) 
Compare the cost to perform the improvement, the cost to repair the damaged building to its predamaged condition, or the combined costs of improvements and repairs, where applicable, to the market value of the building or structure.
(4) 
Determine and document whether the proposed work constitutes substantial improvement or repair of substantial damage. This determination requires the evaluation of previous permits issued for improvements and repairs over a period of one year prior to the permit application or substantial damage determination as specified in the definition of substantial improvement. This determination shall also include the evaluation of flood-related damages over a ten-year period to determine if the costs of repairs at the times of each flood constitutes a repetitive loss as defined by this chapter.
(a) 
The Floodplain Administrator and/or designated professional staff shall use the following formula for determining whether or not proposed improvements constitute a substantial improvement:
Improvement Percentage = Project Cost ÷ Market Value.
(5) 
Notify the applicant, in writing, when it is determined that the work constitutes substantial improvement or repair of substantial damage and that compliance with the flood-resistant construction requirements of the Building Code is required and notify the applicant, in writing, when it is determined that work does not constitute substantial improvement or repair of substantial damage. The Floodplain Administrator shall also provide all letters documenting substantial damage and compliance with flood-resistant construction requirements of the Building Code to the NJDEP Bureau of Flood Engineering.
N. 
Department records. In addition to the requirements of the Building Code and this chapter, and regardless of any limitation on the period required for retention of public records, the Floodplain Administrator shall maintain and permanently keep and make available for public inspection all records that are necessary for the administration of this chapter and the flood provisions of the Uniform Construction Code, including Flood Insurance Studies, Flood Insurance Rate Maps; documents from FEMA that amend or revise FIRMs; NJDEP delineations, records of issuance of permits and denial of permits; records of ordinary maintenance and minor work, determinations of whether proposed work constitutes substantial improvement or repair of substantial damage; required certifications and documentation specified by the Uniform Construction Code and this chapter including as-built elevation certificates; notifications to adjacent communities, FEMA, and the state related to alterations of watercourses; assurance that the flood-carrying capacity of altered waterways will be maintained; documentation related to variances, including justification for issuance or denial; and records of enforcement actions taken pursuant to this chapter and the flood-resistant provisions of the Uniform Construction Code. The Floodplain Administrator shall also record the required elevation, determination method, and base flood elevation source used to determine the local design flood elevation in the floodplain development permit.
O. 
Liability. The Floodplain Administrator and any employee charged with the enforcement of this chapter, while acting for the jurisdiction in good faith and without malice in the discharge of the duties required by this chapter or other pertinent law or ordinance, shall not thereby be rendered liable personally and is hereby relieved from personal liability for any damage accruing to persons or property as a result of any act or by reason of an act or omission in the discharge of official duties. Any suit instituted against an officer or employee because of an act performed by that officer or employee in the lawful discharge of duties and under the provisions of this chapter shall be defended by legal representative of the jurisdiction until the final termination of the proceedings. The Floodplain Administrator and any subordinate shall not be liable for cost in any action, suit or proceeding that is instituted in pursuance of the provisions of this chapter.
A. 
Applicants for a floodplain development permit shall be subject to the following fees:
Project Type
Fee
Commercial/nonresidential
$300
Residential including the following:
New construction
Additions
Manufactured homes
Detached garages
$150
Interior renovations/alterations
$50
Accessory structures/uses excluding detached garages
$50
Fence/roof/ordinary building maintenance and minor work
$25
Substantial improvement/damage review
$300
B. 
All fees shall be paid as follows:
(1) 
Fees shall be paid at the time of application.
(2) 
All checks shall be made payable to the 'Township of Cranford.
(3) 
In the event that an application includes a category plus a substantial improvement/damage review, the fee shall consist of the total of the normal fees for the applicable categories.
C. 
Floodplain development permit fees shall be waived for those properties already satisfying the requirements of § 225-12B(1)(d).
A. 
General provisions. Development for which a permit is required shall be subject to inspection. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this chapter or the Building Code. Inspections presuming to give authority to violate or cancel the provisions of this chapter or the Building Code or other ordinances shall not bevalid.
B. 
Inspections of development. The Floodplain Administrator shall inspect all development in flood hazard areas authorized by issuance of permits under this chapter. The Floodplain Administrator shall inspect flood hazard areas from time to time to determine if development is undertaken without issuance of a permit.
C. 
Buildings and structures. The Construction Official shall make or cause to be made, inspections for buildings and structures in flood hazard areas authorized by permit in accordance with the Uniform Construction Code, N.J.A.C. 5:23.
(1) 
Lowest floor elevation. Upon placement of the lowest floor, including the basement, and prior to further vertical construction, certification of the elevation required in § 225-12B shall be submitted to the Construction Official on an elevation certificate.
(2) 
Lowest horizontal structural member. In V Zones and Coastal A Zones, upon placement of the lowest floor, including the basement, and prior to further vertical construction, certification of the elevation required in § 225-12B shall be submitted to the Construction Official on an elevation certificate.
(3) 
Installation of attendant utilities (electrical, heating, ventilating, air-conditioning, and other service equipment) and sanitary facilities elevated as discussed in § 225-12B.
(4) 
Final inspection. Prior to the final inspection, certification of the elevation required in § 225-12B shall be submitted to the Construction Official on an elevation certificate.
D. 
Manufactured homes. The Floodplain Administrator shall inspect manufactured homes that are installed or replaced in flood hazard areas to determine compliance with the requirements of this chapter and the conditions of the issued permit. Upon placement of a manufactured home, certification of the elevation of the lowest floor shall be submitted on an elevation certificate to the Floodplain Administrator prior to the final inspection.
A. 
General provisions. The Zoning Board of Adjustment shall hear and decide requests for variances. The Zoning Board of Adjustment shall base its determination on technical justifications submitted by applicants, the considerations for issuance in § 225-7E, the conditions of issuance set forth in § 225-7F, and the comments and recommendations of the Floodplain Administrator and, as applicable, the Construction Official. The Zoning Board of Adjustment has the right to attach such conditions to variances as it deems necessary to further the purposes and objectives of this chapter.
B. 
Historic structures. A variance to the substantial improvement requirements of this chapter is authorized provided that the repair or rehabilitation of a historic structure is completed according to N.J.A.C. 5:23-6.33, Section 1612 of the International Building Code and Section R322 of the International Residential Code, the repair or rehabilitation will not preclude the structure's continued designation as a historic structure, the structure meets the definition of the historic structure as described by this chapter, and the variance is the minimum necessary to preserve the historic character and design of the structure.
C. 
Functionally dependent uses. A variance is authorized to be issued for the construction or substantial improvement necessary for the conduct of a functionally dependent use provided the variance is the minimum necessary to allow the construction or substantial improvement, and that all due consideration has been given to use of methods and materials that minimize flood damage during the base flood and create no additional threats to public safety.
D. 
Restrictions in floodways. A variance shall not be issued for any proposed development in a floodway when any increase in flood levels would result during the base flood discharge, as evidenced by the applicable analysis and certification required in § 225-11D(1) of this chapter.
E. 
Considerations. In reviewing requests for variances, all technical evaluations, all relevant factors, all other portions of this chapter, and the following shall be considered:
(1) 
The danger that materials and debris may be swept onto other lands resulting in further injury or damage.
(2) 
The danger to life and property due to flooding or erosion damage.
(3) 
The susceptibility of the proposed development, including contents, to flood damage and the effect of such damage on current and future owners.
(4) 
The importance of the services provided by the proposed development to the community.
(5) 
The availability of alternate locations for the proposed development that are not subject to flooding or erosion and the necessity of a waterfront location, where applicable.
(6) 
The compatibility of the proposed development with existing and anticipated development.
(7) 
The relationship of the proposed development to the comprehensive plan and floodplain management program for that area.
(8) 
The safety of access to the property in times of flood for ordinary and emergency vehicles.
(9) 
The expected heights, velocity, duration, rate of rise and debris and sediment transport of the floodwater and the effects of wave action, where applicable, expected at the site.
(10) 
The costs of providing governmental services during and after flood conditions including maintenance and repair of public utilities and facilities such as sewer, gas, electrical and water systems, streets, and bridges.
F. 
Conditions for issuance. Variances shall only be issued upon:
(1) 
Submission by the applicant of a showing of good and sufficient cause that the unique characteristics of the size, configuration or topography of the site limit compliance with any provision of this chapter or renders the elevation standards of the Building Code inappropriate.
(2) 
A determination that failure to grant the variance would result in exceptional hardship due to the physical characteristics of the land that render the lot undevelopable.
(3) 
A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, nor create nuisances, cause fraud on or victimization of the public or conflict with existing local laws or ordinances.
(4) 
A determination that the variance is the minimum necessary, considering the flood hazard, to afford relief.
(5) 
Notification to the applicant, in writing, over the signature of the Floodplain Administrator, that the issuance of a variance to construct a structure below the base flood level will result in increased premium rates for flood insurance up to amounts as high as $25 for $100 of insurance coverage, and that such construction below the base flood level increases risks to life and property.
A. 
Development and documentation violations. Any development in any flood hazard area that is being performed without an issued permit or that is in conflict with an issued permit shall be deemed a violation. A building or structure without the documentation of elevation of the lowest floor, the lowest horizontal structural member if in a V or Coastal A Zone, other required design certifications, or other evidence of compliance required by the Building Code is presumed to be a violation until such time as that documentation is provided.
B. 
Authority. The Floodplain Administrator is authorized to serve notices of violation or stop-work orders to owners of property involved, to the owner's agent, or to the person or persons doing the work for development that is not within the scope of the Uniform Construction Code but is regulated by this chapter and that is determined to be a violation.
C. 
Unlawful continuance. Any person who shall continue any work after having been served with a notice of violation or a stop-work order, except such work as that person is directed to perform to remove or remedy a violation or unsafe condition, shall be subject to penalties as prescribed by N.J.S.A. 40:49-5 as appropriate.
D. 
Review period to correct violations. A thirty-day period shall be given to the property owner as an opportunity to cure or abate the condition. The property owner shall also be afforded an opportunity for a hearing before the court for an independent determination concerning the violation. Subsequent to the expiration of the thirty-day period, a fine greater than $1,250 may be imposed if a court has not determined otherwise or, upon reinspection of the property, it is determined that the abatement has not been substantially completed.