[Ord. No. 12-2019, art. III, § 13301, eff. 3-20-2019; Ord. No. 34-2021, § 1, eff. 10-11-2021]
a.
For all regulated activities that result in cumulative earth disturbances equal to or greater than ten thousand (10,000) square feet, or the addition of five thousand (5,000) square feet of impervious area, or lower thresholds as defined in the Zoning Ordinance, unless preparation of an SWM Site Plan is specifically exempted in Section 1303.02:
b.
SWM Site Plans approved by the City, in accordance with Section 1304.06, shall be on site throughout the duration of the regulated activity.
c.
These standards apply to the landowner and any person engaged in regulated activities.
d.
Riparian buffer requirements per Section 1303.05 are applicable regardless of whether or not the disturbance thresholds triggering SWM Site Plan review are met.
e.
For all regulated earth disturbance activities, erosion and sediment control BMPs shall be designed, implemented, operated, and maintained during the regulated earth disturbance activities (e.g., during construction) to meet the purposes and requirements of this Title and to meet all requirements under PA Code Title 25 and the Clean Streams Law. Various BMPs and their design standards are listed in the Erosion and Sediment Pollution Control Program Manual (E&S Manual4), No. 363-2134-008, as amended and updated.
f.
Impervious areas from a project site:
1.
The measurement of impervious areas shall include all of the impervious areas in the project site even if development is to take place in stages.
2.
For development taking place in stages, the entire development plan must be used in determining conformance with this Title.
3.
For projects that add impervious areas to a site, the total impervious areas is subject to the requirements of this Title and of Title 9, the Zoning Code. The total impervious areas calculation shall include the sum of the remaining pre-development impervious areas plus any newly created post-development impervious areas, if applicable.
g.
Stormwater flows onto adjacent or downstream property shall not be created, increased, decreased, relocated, impeded, or otherwise altered without written permission of the affected property owner(s). Notification shall include a description of the proposed development and the stormwater flows that are being created, increased, decreased, relocated, impeded, or otherwise altered. Adjacent property shall at a minimum include any property having a shared boundary with the subject property of the SWM Site Plan, however, if in the judgement of the Designated Plan Reviewer additional properties are being affected, additional notifications may be required. Proof of notification (signed postal receipt for example) shall be included as part of the SWM plan submission to the City. Such stormwater flows shall be subject to the requirements of this Title.
h.
All regulated activities shall include such measures as necessary to:
1.
Protect health, safety, and property.
2.
Meet the water quality goals of this Title by implementing measures to:
A.
Minimize disturbance to floodplains, wetlands, natural slopes over twenty-five (25) percent, existing native vegetation, trees and wooded areas.
B.
Maintain or extend riparian buffers.
C.
Minimize soil disturbance and soil compaction.
D.
Avoid erosive flow conditions in natural flow pathways.
E.
Minimize thermal impacts to waters of this Commonwealth.
F.
Disconnect impervious surfaces by directing runoff to pervious areas, wherever possible.
3.
Incorporate green infrastructure methods described in the City of Pittsburgh Stormwater Design Manual. In cases where green infrastructure is infeasible, as determined within the City of Pittsburgh Stormwater Design Manual, the SWM Site Plan shall meet the requirements in Section 1303.033.
i.
Infiltration BMPs should be dispersed throughout the project site at strategic locations, made as shallow as practicable, and located to maximize use of natural on-site infiltration features provided that the geological and soil conditions are conducive to infiltration. Locations where infiltration is prohibited within the City are defined within the City of Pittsburgh Stormwater Design Manual.
j.
All BMPs should completely drain both the volume control and rate control capacities over a period of time not less than twenty-four (24) and not more than seventy-two (72) hours from the end of the design storm.
k.
The design storm precipitation depths to be used in the analysis of volume control and peak rates of discharge shall be as obtained in the City of Pittsburgh Stormwater Design Manual.
l.
For all regulated activities, SWM BMPs shall be designed, implemented, operated, and maintained to meet the purposes and requirements of this Title and to meet all requirements under PA Code Title 25, the Clean Streams Law, and the Storm Water Management Act.
m.
Regulated activities shall incorporate BMPs and their design standards as listed in the City of Pittsburgh Stormwater Design Manual.
n.
The City may, after consultation with DEP, approve measures for meeting the State Water Quality Requirements other than those in this Title, provided that they meet the minimum requirements of, and do not conflict with, state law including, but not limited to, the Clean Streams Law.
o.
For regulated activities discharging stormwater to surface Waters of the Commonwealth via privately and/or publicly owned separate storm sewers, BMPs shall meet or exceed pollutant filtration requirements within the City of Pittsburgh Stormwater Design Manual.
p.
For regulated activities within high pollutant loading hotspot areas, all BMPs used to meet the volume and/or rate control requirements shall incorporate pretreatment to prevent BMP performance decline due to pollutants. Guidelines for pollutant loading hotpot areas and pretreatment design methods shall meet requirements within the City of Pittsburgh Stormwater Design Manual.
q.
The order of preference for all stormwater discharge connections, regardless if subject to stormwater regulations, shall be 1.) the surface waters of the Commonwealth, 2.) a public separate storm sewer, and 3.) a public combined sewer. All stormwater connections and the minimum distance threshold for mandatory connection shall meet requirements within Title Four: Public Spaces Chapter 433: Illegal Surface Stormwater Connections, the PWSA Developers Manual, and the City of Pittsburgh Stormwater Design Manual.
r.
Surface stormwater discharges from a project site to the public right-of-way are prohibited and all stormwater discharges must connect as per the connection requirements in Section 1303.01.q. In the event that surface discharges to the right-of-way are unavoidable per an alternatives analysis submitted to the City demonstrating that the connection options in Section 1303.01.q are not feasible, a "no-harm" downstream hydraulic analysis is required at the discretion of the City to ensure that sufficient conveyance capacity exists to convey the discharge without risk to public safety. "No-harm" downstream hydraulic analysis shall meet the requirements within the City of Pittsburgh Stormwater Design Manual.
s.
All stormwater runoff and groundwater originating from a project site are the sole responsibility of the property owner to provide for, and maintain, private stormwater management infrastructure that safely conveys all discharge flows. No discharges shall result in a public safety and/or nuisance risk to adjacent public and private property. In the event of insufficient capacity to meet this requirement, the developer must construct new or existing infrastructure upgrades, either on adjacent private property or to the public right-of-way infrastructure. Cost for upgrades shall be provided at developer's expense. Depending on the type of the upgrade, the City at its discretion may require regular maintenance, at the developer's expense, to ensure long-term functionality.