A.
The development shall incorporate a maintenance plan for the stormwater management measures incorporated into the design of a major development in accordance with Article IX.
B.
Stormwater management measures shall avoid adverse impacts of concentrated flow on habitat for threatened and endangered species as documented in the Department's Landscape Project or Natural Heritage Database established under N.J.S.A. 13:1B-15.147 through 15.150, particularly Helonias bullata (swamp pink) and/or Clemmys muhlnebergi (bog turtle).
C.
The following linear development projects are exempt from the groundwater recharge, stormwater runoff quality, and stormwater runoff quantity requirements of §§ 172-9, 172-10, and 172-11:
(1)
The construction of an underground utility line, provided that the disturbed areas are revegetated upon completion;
(2)
The construction of an aboveground utility line, provided that the existing conditions are maintained to the maximum extent practicable; and
(3)
The construction of a public pedestrian access, such as a sidewalk or trail with a maximum width of 14 feet, provided that the access is made of permeable material.
D.
A waiver from strict compliance from the green infrastructure, groundwater recharge, stormwater runoff quality, and stormwater runoff quantity requirements of §§ 172-8, 172-9, 172-10, and 172-11 may be obtained for the enlargement of an existing public roadway or railroad; or the construction or enlargement of a public pedestrian access, provided that the following conditions are met:
(1)
The applicant demonstrates that there is a public need for the project that cannot be accomplished by any other means;
(4)
The applicant demonstrates that it does not own or have other rights to areas, including the potential to obtain through condemnation lands not falling under § 172-7D(3) above, within the upstream drainage area of the receiving stream that would provide additional opportunities to mitigate the requirements of §§ 172-8, 172-9, 172-10, and 172-11 that were not achievable on site.
E.
Tables 1 through 3 below summarize the ability of stormwater best management practices identified and described in the New Jersey Stormwater Best Management Practices Manual to satisfy the green infrastructure, groundwater recharge, stormwater runoff quality and stormwater runoff quantity standards specified in §§ 172-8, 172-9, 172-10, and 172-11. When designed in accordance with the most current version of the New Jersey Stormwater Best Management Practices Manual, the stormwater management measures found at N.J.A.C. 7:8-5.2(f), Tables 5-1, 5-2 and 5-3, and listed below in Tables 1, 2 and 3 are presumed to be capable of providing stormwater controls for the design and performance standards as outlined in the tables below. Upon amendments of the New Jersey Stormwater Best Management Practices to reflect additions or deletions of BMPs meeting these standards, or changes in the presumed performance of BMPs designed in accordance with the New Jersey Stormwater BMP Manual, the Department shall publish in the New Jersey Registers a notice of administrative change revising the applicable table. The most current version of the BMP Manual can be found on the Department's website at https://dep.nj.gov/stormwater/bmp-manual/.
F.
Where the BMP tables in the New Jersey Stormwater Management Rule are different due to updates or amendments with the tables in this chapter, the BMP tables in the Stormwater Management Rule at N.J.A.C. 7:8-5.2(f) shall take precedence.
Table 1 Green Infrastructure BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or Stormwater Runoff Quantity | ||||
|---|---|---|---|---|
Best Management Practice | Stormwater Runoff Quality TSS Removal Rate (percent) | Stormwater Runoff Quantity | Groundwater Recharge | Minimum Separation from Seasonal High Water Table (feet) |
Cistern | 0 | Yes | No | — |
Dry well(a) | 0 | No | Yes | 2 |
Grass swale | 50 or less | No | No | 2(e) |
1(f) | ||||
Green roof | 0 | Yes | No | — |
Manufactured treatment device(a)(g) | 50 or 80 | No | No | Dependent upon the device |
Pervious paving system(a) | 80 | Yes | Yes(b) | 2(b) |
No(c) | 1(c) | |||
Small-scale bioretention basin(a) | 80 or 90 | Yes | Yes(b) | 2(b) |
No(c) | 1(c) | |||
Small-scale infiltration basin(a) | 80 | Yes | Yes | 2 |
Small-scale sand filter | 80 | Yes | Yes | 2 |
Vegetative filter strip | 60-80 | No | No | — |
Table 2 Green Infrastructure BMPs for Stormwater Runoff Quantity (or for Groundwater Recharge and/or Stormwater Runoff Quality with a Waiver or Variance from N.J.A.C. 7:8-5.3) | ||||
|---|---|---|---|---|
Best Management Practice | Stormwater Runoff Quality TSS Removal Rate (percent) | Stormwater Runoff Quantity | Groundwater Recharge | Minimum Separation from Seasonal High Water Table (feet) |
Bioretention system | 80 or 90 | Yes | Yes(b) | 2(b) |
No(c) | 1(c) | |||
Infiltration basin | 80 | Yes | Yes | 2 |
Sand filter(b) | 80 | Yes | Yes | 2 |
Standard constructed wetland | 90 | Yes | No | N/A |
Wet pond(d) | 50-90 | Yes | No | N/A |
Table 3 BMPs for Groundwater Recharge, Stormwater Runoff Quality, and/or Stormwater Runoff Quantity only with a Waiver or Variance from N.J.A.C. 7:8-5.3 | ||||
|---|---|---|---|---|
Best Management Practice | Stormwater Runoff Quality TSS Removal Rate (percent) | Stormwater Runoff Quantity | Groundwater Recharge | Minimum Separation from Seasonal High Water Table (feet) |
Blue roof | 0 | Yes | No | N/A |
Extended detention basin | 40 to 60 | Yes | No | 1 |
Manufactured treatment device(h) | 50 or 80 | No | No | Dependent upon the device |
Sand filter(c) | 80 | Yes | No | 1 |
Subsurface gravel wetland | 90 | No | No | 1 |
Wet pond | 50 to 90 | Yes | No | N/A |
Notes to Tables 1, 2, and 3: | |
(a) | Subject to the applicable contributory drainage area limitation |
(b) | Designed to infiltrate into the subsoil. |
(c) | Designed with underdrains. |
(d) | Designed to maintain at least a ten-foot-wide area of native vegetation along at least 50% of the shoreline and to include a stormwater runoff retention component designed to capture stormwater runoff for beneficial reuse, such as irrigation. |
(e) | Designed with a slope of less than 2%. |
(f) | Designed with a slope of equal to or greater than 2%. |
(g) | Manufactured treatment devices that meet the definition of "green infrastructure" at § 172-5. |
(h) | Manufactured treatment devices that do not meet the definition of "green infrastructure" at § 172-5. |
G.
An alternative stormwater management measure, alternative removal rate, and/or alternative method to calculate the removal rate may be used if the design engineer demonstrates the capability of the proposed alternative stormwater management measure and/or the validity of the alternative rate or method to the municipality. A copy of any approved alternative stormwater management measure, alternative removal rate, and/or alternative method to calculate the removal rate shall be provided to the Department in accordance with § 172-14B. Alternative stormwater management measures may be used to satisfy the requirements at § 172-8 only if the measures meet the definition of "green infrastructure" at § 172-5. Alternative stormwater management measures that function in a similar manner to a BMP listed at § 172- 8B are subject to the contributory drainage area limitation specified at § 172-8B for that similarly functioning BMP. Alternative stormwater management measures approved in accordance with this subsection that do not function in a similar manner to any BMP listed at § 172-8B shall have a contributory drainage area less than or equal to 2.5 acres, except for alternative stormwater management measures that function similarly to cisterns, grass swales, green roofs, standard constructed wetlands, vegetative filter strips, and wet ponds, which are not subject to a contributory drainage area limitation. Alternative measures that function similarly to standard constructed wetlands or wet ponds shall not be used for compliance with the stormwater runoff quality standard unless a variance in accordance with N.J.A.C. 7:8-4.6 or a waiver from strict compliance in accordance with § 172-7D is granted from § 172-8.
H.
Whenever the stormwater management design includes one or more BMPs that will infiltrate stormwater into subsoil, the design engineer shall assess the hydraulic impact on the groundwater table and design the site so as to avoid adverse hydraulic impacts. Potential adverse hydraulic impacts include, but are not limited to, exacerbating a naturally or seasonally high water table, so as to cause surficial ponding, flooding of basements, or interference with the proper operation of subsurface sewage disposal systems or other subsurface structures within the zone of influence of the groundwater mound, or interference with the proper functioning of the stormwater management measure itself.
I.
Design standards for stormwater management measures are as follows:
(1)
Stormwater management measures shall be designed to take into account the existing site conditions, including, but not limited to, environmentally critical areas; wetlands; flood-prone areas; slopes; depth to seasonal high water table; soil type, permeability, and texture; drainage area and drainage patterns; and the presence of solution-prone carbonate rocks (limestone);
(2)
Stormwater management measures shall be designed to minimize maintenance, facilitate maintenance and repairs, and ensure proper functioning. Trash racks shall be installed at the intake to the outlet structure, as appropriate, and shall have parallel bars with one-inch spacing between the bars to the elevation of the water quality design storm. For elevations higher than the water quality design storm, the parallel bars at the outlet structure shall be spaced no greater than 1/3 the width of the diameter of the orifice or 1/3 the width of the weir, with a minimum spacing between bars of one inch and a maximum spacing between bars of six inches. In addition, the design of trash racks must comply with the requirements of § 172-16C;
(3)
Stormwater management measures shall be designed, constructed, and installed to be strong, durable, and corrosion resistant. Measures that are consistent with the relevant portions of the Residential Site Improvement Standards at N.J.A.C. 5:21-7.3, 7.4, and 7.5 shall be deemed to meet this requirement;
(4)
Stormwater management BMPs shall be designed to meet the minimum safety standards for stormwater management BMPs at § 172-16; and
(5)
The size of the orifice at the intake to the outlet from the stormwater management BMP shall be a minimum of 2 1/2 inches in diameter.
J.
Manufactured treatment devices may be used to meet the requirements of this article, provided the pollutant removal rates are verified by the New Jersey Corporation for Advanced Technology and certified by the Department. Manufactured treatment devices that do not meet the definition of "green infrastructure" at § 172-5 may be used only under the circumstances described at § 172-8D.
K.
Any application for a new agricultural development that meets the definition of "major development" at § 172-5 shall be submitted to the Soil Conservation District for review and approval in accordance with the requirements at §§ 172-8, 172-9, 172-10, and 172-11 and any applicable Soil Conservation District guidelines for stormwater runoff quantity and erosion control. For purposes of this subsection, "agricultural development" means land uses normally associated with the production of food, fiber, and livestock for sale. Such uses do not include the development of land for the processing or sale of food and the manufacture of agriculturally related products.
L.
If there is more than one drainage area, the groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards at §§ 172-9, 172-10, and 172-11 shall be met in each drainage area, unless the runoff from the drainage areas converge on site and no adverse environmental impact would occur as a result of compliance with any one or more of the individual standards being determined utilizing a weighted average of the results achieved for that individual standard across the affected drainage areas.
M.
Any stormwater management measure authorized under the municipal stormwater management plan or ordinance shall be reflected in a deed notice recorded in the Morris County Clerk's office. A form of deed notice shall be submitted to the municipality for approval prior to filing. The deed notice shall contain a description of the stormwater management measure(s) used to meet the green infrastructure, groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards at §§ 172-8, 172-9, 172-10, and 172-11 and shall identify the location of the stormwater management measure(s) in NAD 1983 State Plane New Jersey FIPS 2900 US feet or latitude and longitude in decimal degrees. The deed notice shall also reference the maintenance plan required to be recorded upon the deed pursuant to § 172-21E. Prior to the commencement of construction, proof that the above required deed notice has been filed shall be submitted to the municipality. Proof that the required information has been recorded on the deed shall be in the form of either a copy of the complete recorded document or a receipt from the Clerk or other proof of recordation provided by the recording office. However, if the initial proof provided to the municipality is not a copy of the complete recorded document, a copy of the complete recorded document shall be provided to the municipality within 180 calendar days of the authorization granted by the municipality.
N.
A stormwater management measure approved under the municipal stormwater management plan or ordinance may be altered or replaced with the approval of the municipality if the municipality determines that the proposed alteration or replacement meets the design and performance standards pursuant to Article IV of this chapter and provides the same level of stormwater management as the previously approved stormwater management measure that is being altered or replaced. If an alteration or replacement is approved, a revised deed notice shall be submitted to the municipality for approval and subsequently recorded with the Morris County Clerk's Office and shall contain a description and location of the stormwater management measure, as well as reference to the maintenance plan, in accordance with Subsection M above. Prior to the commencement of construction, proof that the above required deed notice has been filed shall be submitted to the municipality in accordance with Subsection M above.