The following is a listing of moratoriums that have been enacted by the Town since September 20, 2024. Additional information on the moratoriums listed below as well as on moratoriums enacted prior to September 20, 2024, is available at the Town offices.
Enactment | Adoption Date | Description | Duration | Notes |
|---|---|---|---|---|
L.L. No. 13-2024 | 9-20-2024 | Enacting a moratorium on battery energy storage systems | Three months | Extended by L.L. No. 1-2025; L.L. No. 6-2025; L.L. 8-2026 |
L.L. No. 1-2025 | 1-23-2025 | Extending a moratorium on battery energy storage systems | Three months | |
L.L. No. 6-2025 | 8-12-2025 | Extending a moratorium on battery energy storage systems | Six months | |
L.L. No. 8-2026 | 4-23-2026 | Extending a moratorium on battery energy storage systems | Six months |