A.
No person shall lay, relay or repair a curb or sidewalk, in any other manner than is specified in this article or the specifications adopted by Council for such work.
B.
All curbing, paving and repaving of sidewalks shall be done in accordance with specifications adopted by Council. The width, depth and thickness of curb and curbstone, the depth of grading and the manner of mixing and laying materials, and the kind and character of material to be used, shall be as prescribed by Council.
C.
Each owner of any property abutting any street or highway shall be required by ordinance to construct a sidewalk or pavement and to lay a curb in front of and adjoining any such lot, or to repave and repair the sidewalk or reset or relay the curb, and make the same conform with the regulations of this article, any other City ordinances and to the specifications governing such work.