A.
Continuation. Any lawful use of a building or land existing at the effective date of this chapter may be continued, although such use does not conform to the provisions of this chapter.
B.
Extension. A nonconforming use of land or building shall not be extended or structurally altered; provided, however, that the Borough Council may, as a conditional use, authorize:
(1)
The structural alteration of a nonconforming building where such alteration is necessary for the building or the use of the building to conform to the requirements of the district in which such building is situated.
(2)
The extension of a nonconforming use of a portion of a building throughout the building, or the limited extension of a building which is devoted to a nonconforming use on a lot, provided that:
(a)
It is clear that such extension is not materially detrimental to the character of the surrounding area or the interests of the Borough.
(b)
The area devoted to the nonconforming use shall in no case be increased by more than 50% of the size of the footprint of the existing nonconforming structure.
[Amended 2-2-2010 by Ord. No. 853, approved 2-2-2010]
(c)
Such extension shall conform to the area and height regulations of the district in which it is situated.
C.
Changes. An existing nonconforming use may be changed to another nonconforming use when authorized as a conditional use by the Borough Council. However, Borough Council reserves the right to set conditions on such use and the associated improvements required to construct and operate the new use.
D.
Restoration. A nonconforming building wholly or partially destroyed by fire, explosion, flood or other phenomenon, or legally condemned, may be reconstructed, repaired and used for the same nonconforming use, provided that reconstruction shall be commenced within six months from the date the building was destroyed or condemned. This reconstruction shall be carried on without interruption. No such building shall be used for a nonconforming use until it is completed to the satisfaction of the Borough Manager or his or her designee. Reconstruction must be completed within 12 months following the destruction.
E.
Abandonment. If a nonconforming use of a building or land is voluntarily abandoned and ceases for a continuous period of one year or more, subsequent use of such building or land shall be in conformity with the provisions of this chapter.