In all use districts, a parcel of land or existing building expansion proposal, located within or adjacent to a critical area as identified in Chapter 18.10 CRMC, must first obtain a critical areas permit, prior to obtaining site development preparation approval or a building permit.
(Ord. 2018-02 § 2 (Exh. A), 2018)