[Ord. No. 1102, 9/3/2024]
1.
From and after the date of enactment of this chapter, a stormwater management site plan and other information specified herein shall be submitted to the Township for all lands subdivided or for which land development plans are prepared after the enactment of this chapter. A stormwater management site plan and other information specified herein shall be submitted at the same time and together with submission of a preliminary subdivision or land development plan, along with a completed checklist supplied by the Township indicating the items contained within the submission.
2.
Such plans and information shall be considered part of said zoning and subdivision documents and shall be reviewed in accordance with procedures established thereunder. Preliminary approval or final approval of a subdivision or land development plan, or the issuance of a zoning permit, shall be contingent upon submission of a stormwater management plan and other materials specified herein, and approval of the stormwater management plan in accordance with provisions of this chapter.
3.
All stormwater management plans shall be submitted to the Township Stormwater Engineer for review and comment. Such review shall include a statement by the Township Stormwater Engineer specifying the provisions of this chapter which have not been met by the plan as submitted.
4.
Once a site stormwater management plan has been approved together with a subdivision or land development plan approval, or together with the issuance of a zoning permit, said site stormwater management plan shall be valid only for the approved subdivision, land development, or zoning permit. Any further development on the lot or lots requiring a revision of the approved plan or other construction or activities as defined by Township Zoning Regulations (Chapter 27) shall require the submission of a new, amended, or revised site stormwater management plan and other information specified herein.