[Ord. No. 337, 5/15/2024]
(a)
Applicants proposing regulated activities in Amity Township which do not fall under the exemption criteria shown in § 25-402 shall submit a drainage plan consistent with this chapter to the Township for review. These criteria shall apply to the total proposed development even if development is to take place in stages. No regulated activities shall commence until the Township issues written approval of a drainage plan, which demonstrates compliance with the requirements of this chapter.
(b)
The applicant is required to evaluate practicable alternatives to the surface discharge of stormwater, the creation of impervious surfaces and the degradation of waters of the commonwealth, and must maintain as much as possible the natural hydrologic regime
(c)
The drainage plan must be designed consistent with the sequencing provisions of § 25-304 to ensure maintenance of the natural hydrologic regime and to promote groundwater recharge and protect groundwater and surface water quality and quantity. The drainage plan designer must proceed sequentially in accordance with Part 3 of this chapter.
(d)
Existing points of concentrated drainage that discharge onto adjacent property shall not be altered in any manner which could cause property damage without permission of the affected property owner(s) and shall be subject to any applicable discharge criteria specified in this chapter.
(e)
Areas of existing diffused drainage discharge shall be subject to any applicable discharge criteria in the general direction of existing discharge, whether proposed to be concentrated or maintained as diffused drainage areas, except as otherwise provided by this chapter. If diffused drainage discharge is proposed to be concentrated and discharged onto adjacent property, the applicant must document that adequate downstream conveyance facilities exist to safely transport the concentrated discharge, or otherwise prove that no erosion, sedimentation, flooding or other impacts will result from the concentrated discharge.
(f)
Where a development site is traversed by existing watercourses, drainage easements shall be provided conforming to the line of such watercourses. The terms of the easement shall conform to the stream buffer requirements contained in § 25-306(d) of this chapter.
(g)
Any stormwater management facilities regulated by this chapter that would be located in or adjacent to waters of the commonwealth or wetlands shall be subject to approval by PaDEP through the joint permit application process, or, where deemed appropriate by PaDEP, the general permit process. When there is a question whether wetlands may be involved, it is the responsibility of the applicant or his agent to show that the land in question cannot be classified as wetlands; otherwise approval to work in the area must be obtained from PaDEP.
(h)
Any alteration that affects stormwater flow directly or indirectly toward a PennDOT facility shall be subject to PennDOT regulations.
(i)
Minimization of impervious surfaces and infiltration of runoff through seepage beds, infiltration trenches, etc., are encouraged, where soil conditions permit, to reduce the size or eliminate the need for detention facilities or other structural BMPs.
(j)
Roof drains shall not be connected to impervious surfaces in order to promote overland flow and infiltration/percolation of stormwater where advantageous to do so. When site conditions preclude infiltration/percolation, then it shall be permitted on a case-by-case basis by the Township.
(k)
All stormwater runoff shall be treated for water quality.
(l)
Transference of runoff to or from an EV/HQ watershed is prohibited unless otherwise authorized by DEP, DRBC or SRBC.
(m)
The Board may require that a landowner or developer provide reasonable corrective measures to alleviate an existing off-site drainage problem that may be affected by the proposed subdivision and/or land development. It shall be the responsibility of the landowner or developer to obtain all drainage easements on, over, or through other properties, and the Township, its agents, workmen, servants and employees shall be indemnified and held harmless from any liability.
(n)
Drainage plans approved by the municipality, in accordance with § 25-406, shall be on site throughout the duration of the regulated activity.
(o)
The municipality may, after consultation with DEP, approve measures for meeting the state water quality requirements other than those in this chapter, provided that they meet the minimum requirements of, and do not conflict with, state law, including, but not limited to, the Clean Streams Law.[1]
(p)
For all regulated earth disturbance activities, erosion and sediment control BMPs shall be designed, implemented, operated, and maintained during the regulated earth disturbance activities (e.g., during construction) to meet the purposes and requirements of this chapter and to meet all requirements under Title 25 of the Pennsylvania Code and the Clean Streams Law. Various BMPs and their design standards are listed in the Erosion and Sediment Pollution Control Program Manual (E&S Manual), No. 363-2134-008, as amended and updated.
(q)
Impervious areas:
(1)
The measurement of impervious areas shall include all of the impervious areas in the total proposed development even if development is to take place in stages.
(2)
For development taking place in stages, the entire development plan must be used in determining conformance with this chapter.
(3)
For projects that add impervious area to a parcel, the total impervious area on the parcel is subject to the requirements of this chapter; except that the volume controls in § 25-303 and the peak rate controls of § 25-304 do not need to be retrofitted to existing impervious areas that are not being altered by the proposed regulated activity.
(r)
Stormwater flows onto adjacent property shall not be created, increased, decreased, relocated, or otherwise altered without written notification to the adjacent property owner(s). Such stormwater flows shall be subject to the requirements of this chapter.
(s)
All regulated activities shall include such measures as necessary to:
(1)
Protect health, safety, and property.
(2)
Meet the water quality goals of this chapter by implementing measures to:
(i)
Minimize disturbance to floodplains, wetlands, and wooded areas.
(ii)
Maintain or extend riparian buffers.
(iii)
Avoid erosive flow conditions in natural flow pathways.
(iv)
Minimize thermal impacts to waters of this commonwealth.
(v)
Disconnect impervious surfaces by directing runoff to pervious areas, wherever possible.
(3)
Incorporate methods described in the Pennsylvania Stormwater Best Management Practices Manual (BMP Manual).
(t)
The design of all facilities over karst shall include an evaluation of measures to minimize adverse effects.
(u)
Infiltration BMPs should be spread out, made as shallow as practicable, and located to maximize use of natural on-site infiltration features while still meeting the other requirements of this chapter.
(v)
Normally dry, open-top, storage facilities should completely drain both the volume control and rate control capacities over a period of time not less than 24 and not more than 72 hours from the end of the design storm.
(w)
The design storm volumes to be used in the analysis of peak rates of discharge should be obtained from the latest version of the Precipitation-Frequency Atlas of the United States, National Oceanic and Atmospheric Administration (NOAA), National Weather Service, Hydrometeorological Design Studies Center, Silver Spring, Maryland. NOAA's Atlas 14 can be accessed at: http://hdsc.nws.noaa.gov/hdsc/pfds/.
(x)
(y)
Various BMPs and their design standards are listed in the BMP Manual.