Development shall be designed to minimize the removal of significant and exceptional trees and maximize on-site tree retention consistent with the following:
A. Exceptional trees shall be retained except as provided below:
1. Retention of an exceptional tree(s) will result in an unavoidable hazardous situation consistent with the standards established in BLMC §
16.64.040; or
2. Retention of an exceptional tree(s) will prevent construction otherwise allowed under BLMC Title 15.
B. Significant trees shall be prioritized for retention as provided below:
2. Trees with a diameter of more than 24 inches.
3. Other significant trees that either:
a. Have a greater likelihood of longevity; or
b. Are part of a tree grove.
4. The city may require that trees be retained in partial fulfillment of landscaping requirements.
5. Perimeter trees that are windfirm and tree groves.
C. Any trees retained or replaced in landscape buffers required by Chapter
16.68 BLMC shall count toward fulfillment of said buffer requirements.
D. Retained significant and exceptional trees shall be credited towards compliance with the tree credit requirements as provided in BLMC §
16.64.080.
E. Tree retention areas may be required to be placed in a conservation tract or conservation easement, the purpose of which is to set aside and protect the area. The conservation tract or conservation easement shall be:
1. Held by the city, the property owner, a homeowner's association, a land trust or similar conservation organization, or by each lot owner within the development in an undivided interest;
2. Recorded on all documents of title of record for the affected parcels;
3. Noted on the face of any land division or recorded drawing; and
4. Delineated on the ground with permanent markers and signs in accordance with local survey standards. The outer edge of the retention area shall be signed to protect the resource. The director shall specify the design and sign message.
F. During construction retained trees shall be protected consistent with BLMC §
16.64.090.
G. If any tree to be retained is removed, said tree shall be replaced pursuant to BLMC §
16.64.080.
H. The director may consult an arborist on tree retention. The cost of the third-party arborist consultation shall be paid for by the applicant.
(Ord. 1635 § 8, 2020; Ord. 1686 § 15, 2023; Ord. 1745, 12/9/2025)