A. 
Identification and Delineation. Identification of wetlands and delineation of their boundaries pursuant to this chapter shall be done in accordance with the approved federal wetland delineation manual and applicable regional supplements. All areas within the city meeting the wetland designation criteria in that procedure are hereby designated critical areas and are subject to the provisions of this chapter. Wetland delineations are valid for five years; after such date the city shall determine whether a revision or additional assessment is necessary.
B. 
Rating. Wetlands shall be rated according to the Washington Department of Ecology wetland rating system, as set forth in the Washington State Wetland Rating System for Western Washington: 2014 Update (Ecology Publication No. 14-06-029, effective January 2015) or as revised and approved by Ecology, which contains the definitions and methods for determining whether the criteria below are met.
1. 
Category I. Category I wetlands are: (a) relatively undisturbed estuarine wetlands larger than one acre; (b) wetlands of high conservation value that are identified by scientists of the Washington Natural Heritage Program/DNR; (c) bogs; (d) mature and old-growth forested wetlands larger than one acre; (e) wetlands in coastal lagoons; (f) interdunal wetlands that score eight or nine habitat points and are larger than one acre; and (g) wetlands that perform many functions well (scoring 23 points or more). These wetlands: (a) represent unique or rare wetland types; (b) are more sensitive to disturbance than most wetlands; (c) are relatively undisturbed and contain ecological attributes that are impossible to replace within a human lifetime; or (d) provide a high level of functions.
2. 
Category II. Category II wetlands are: (a) estuarine wetlands smaller than one acre, or disturbed estuarine wetlands larger than one acre; (b) interdunal wetlands larger than one acre or those found in a mosaic of wetlands; or (c) wetlands with a moderately high level of functions (scoring between 20 and 22 points).
3. 
Category III. Category III wetlands are: (a) wetlands with a moderate level of functions (scoring between 16 and 19 points); (b) can often be adequately replaced with a well-planned mitigation project; and (c) interdunal wetlands between 0.1 and one acre. Wetlands scoring between 16 and 19 points generally have been disturbed in some ways and are often less diverse or more isolated from other natural resources in the landscape than Category II wetlands.
4. 
Category IV. Category IV wetlands have the lowest levels of functions (scoring fewer than 16 points) and are often heavily disturbed. These are wetlands that we should be able to replace, or in some cases to improve. However, experience has shown that replacement cannot be guaranteed in any specific case. These wetlands may provide some important functions, and should be protected to some degree.
(Ord. 1853 § 2 (Exh. B), 2018)
A. 
Standard Wetland Buffer Widths. The standard buffer widths in Table 14.15.185-1 have been established in accordance with the best available science. They are based on the category of wetland and the habitat score as determined by a qualified wetland professional using the Washington State wetland rating system for western Washington.
1. 
Buffer Conditions.
a. 
These buffer widths assume that the buffer is vegetated with a native plant community appropriate for the ecoregion. If the existing buffer is unvegetated, sparsely vegetated, or vegetated with invasive species that do not perform needed functions, the buffer should either be planted to create the appropriate plant community or the buffer should be widened to ensure that adequate functions of the buffer are provided.
b. 
Measurement of Wetland Buffers. All buffers shall be measured perpendicular from the wetland boundary as surveyed in the field. The buffer for a wetland created, restored, or enhanced as compensation for approved wetland alterations shall be the same as the buffer required for the category of the created, restored, or enhanced wetland. Only fully vegetated buffers will be considered. Lawns, walkways, driveways, and other mowed or paved areas will not be considered buffers or included in buffer area calculations.
c. 
Buffers on Mitigation Sites. All mitigation sites shall have buffers consistent with the buffer requirements of this chapter to the extent feasible. Buffers shall be based on the expected or target category of the proposed wetland mitigation site.
d. 
Overlapping Critical Area Buffers. If buffers for two contiguous critical areas overlap (such as buffers for a stream and a wetland), the wider buffer applies.
e. 
Buffer Maintenance. Except as otherwise specified or allowed in accordance with this chapter, wetland buffers shall be retained in an undisturbed or enhanced condition. In the case of compensatory mitigation sites, removal of invasive nonnative weeds is required for the duration of the required maintenance and monitoring timeline, which ranges from five to 10 years depending on location.
Table 14.15.185-1. Width of buffers needed to protect wetlands in western Washington considering impacts of proposed land uses.
Category of Wetland
Required Buffer
IV
50 ft
III
150 ft
II
300 ft
I
300 ft
B. 
Increased Wetland Buffer Widths. Buffer widths shall be increased on a case-by-case basis when a larger buffer is necessary to protect wetland functions and values. This determination shall be supported by appropriate documentation showing that it is reasonably related to protection of the functions and values of the wetland. The documentation must include but not be limited to the following criteria:
1. 
The wetland is used by a plant or animal species listed by the federal government or the state as endangered, threatened, candidate, sensitive, monitored or documented priority species or habitats, or essential or outstanding habitat for those species or has unusual nesting or resting sites such as heron rookeries or raptor nesting trees; or
2. 
The adjacent land is susceptible to severe erosion, and erosion-control measures will not effectively prevent adverse wetland impacts; or
3. 
The adjacent land has minimal vegetative cover or slopes greater than 30 percent.
C. 
Decreased Wetland Buffer Widths. Buffer widths shall be decreased on a case-by-case basis as determined by the city. This determination shall be supported by appropriate documentation showing that it still protects the functions and values of the wetland. The documentation must include but not be limited to the following criteria:
1. 
Buffer averaging to improve wetland protection may be permitted when all of the following conditions are met:
a. 
The wetland has significant differences in characteristics that affect its habitat functions, such as a wetland with a forested component adjacent to a degraded emergent component or a "dual-rated" wetland with a Category I area adjacent to a lower-rated area.
b. 
The buffer is increased adjacent to the higher-functioning area of habitat or more-sensitive portion of the wetland and decreased adjacent to the lower-functioning or less-sensitive portion as demonstrated by a critical areas report from a qualified wetland professional.
c. 
The total area of the buffer after averaging is equal to the area required without averaging.
d. 
The buffer at its narrowest point is never less than either three-quarters of the required width or 75 feet for Category I and II, 50 feet for Category III, and 25 feet for Category IV, whichever is greater.
2. 
Buffer averaging to allow reasonable use of a parcel may be permitted when all of the following are met:
a. 
There are no feasible alternatives to the site design that could be accomplished without buffer averaging.
b. 
The averaged buffer will not result in degradation of the wetland's functions and values as demonstrated by a critical areas report from a qualified wetland professional.
c. 
The total buffer area after averaging is equal to the area required without averaging.
d. 
The buffer at its narrowest point is never less than either three-quarters of the required width or 75 feet for Category I and II, 50 feet for Category III and 25 feet for Category IV, whichever category is applicable.
D. 
Allowed Buffer Uses. The following uses may be allowed within a wetland buffer in accordance with the review procedures of this chapter; provided they are not prohibited by any other applicable law and they are conducted in a manner so as to minimize impacts to the buffer and adjacent wetland:
1. 
Conservation and Restoration Activities. Conservation or restoration activities aimed at protecting the soil, water, vegetation, or wildlife.
2. 
Passive recreation. Passive recreation facilities designed and in accordance with an approved critical area report, including:
a. 
Walkways and trails; provided, that those pathways are limited to minor crossings having no adverse impact on water quality. They should be generally parallel to the perimeter of the wetland, located only in the outer 25 percent of the wetland buffer area, and located to avoid removal of significant trees. They should be limited to pervious surfaces no more than five feet in width for pedestrian use only. Raised boardwalks utilizing nontreated pilings may be acceptable.
b. 
Wildlife-viewing structures.
3. 
Educational and scientific research activities.
4. 
Normal and routine maintenance and repair of any existing public or private facilities within an existing right-of-way; provided, that the maintenance or repair does not increase the footprint or use of the facility or right-of-way.
5. 
The harvesting of wild crops in a manner that is not injurious to natural reproduction of such crops and provided the harvesting does not require tilling of soil, planting of crops, chemical applications, or alteration of the wetland by changing existing topography, water conditions, or water source.
6. 
Drilling for utilities/utility corridors under a buffer, with entrance/exit portals located completely outside of the wetland buffer boundary; provided, that the drilling does not interrupt the ground water connection to the wetland or percolation of surface water down through the soil column. Specific studies by a hydrologist are necessary to determine whether the ground water connection to the wetland or percolation of surface water down through the soil column is disturbed.
7. 
Enhancement of a wetland buffer through the removal of nonnative invasive plant species. Removal of invasive plant species shall be restricted to hand removal. All removed plant material shall be taken away from the site and appropriately disposed of. Plants that appear on the Washington State Noxious Weed Control Board list of noxious weeds must be handled and disposed of according to a noxious weed control plan appropriate to that species. Revegetation with appropriate native species at natural densities is allowed in conjunction with removal of invasive plant species.
8. 
Storm water management facilities. Storm water management facilities are limited to storm water dispersion outfalls and bioswales. They may be allowed within the outer 25 percent of the buffer of Category III or IV wetlands only; provided, that:
a. 
No other location is feasible; and
b. 
The location of such facilities will not degrade the functions or values of the wetland; and
c. 
Storm water management facilities are not allowed in buffers of Category I or II wetlands; and
d. 
The hydroperiod of the wetland is not altered.
9. 
Nonconforming Uses. Repair and maintenance of nonconforming uses or structures, where legally established within the buffer, provided they do not increase the degree of nonconformity.
E. 
Signs and Fencing of Wetlands and Buffers.
1. 
Temporary Markers. The outer perimeter of the wetland buffer and the clearing limits identified by an approved permit or authorization shall be marked in the field with temporary "clearing limits" fencing in such a way as to ensure that no unauthorized intrusion will occur. The marking is subject to inspection by the community development director prior to the commencement of permitted activities. This temporary marking shall be maintained throughout construction and shall not be removed until permanent signs, if required, are in place.
2. 
Permanent Signs. As a condition of any permit or authorization issued pursuant to this chapter, the city may require the installation of permanent signs along the boundary of a wetland or buffer.
a. 
Permanent signs shall be made of an enamel-coated metal face and attached to a metal post or another nontreated material of equal durability. Signs must be posted at an interval of one per lot or every 50 feet, whichever is less, and must be maintained by the property owner in perpetuity. The signs shall be worded as follows or with alternative language approved by the community development director:
Protected Wetland Area
No Dumping - Do Not Disturb
Thank you
b. 
The provisions of subsection (E)(2)(a) of this section may be modified as necessary to assure protection of sensitive features or wildlife.
3. 
Fencing.
a. 
Permanent fencing shall be required around wetland buffers. The director may waive this requirement for large sites or situations where the installation of fencing is not feasible due to topography, a lack of access, or other site constraints.
b. 
Fencing installed as part of a proposed activity or as required in this subsection shall be designed so as to not interfere with species migration, including fish runs, and shall be constructed in a manner that minimizes impacts to the wetland and associated habitat. The director shall have the authority to specify appropriate standards for buffer fencing consistent with the requirements of this chapter.
(Ord. 1853 § 2 (Exh. B), 2018; Ord. 1933 § 1 (Exh. A), 2023)
A. 
If the preliminary screening indicates the potential presence of wetland indicators, wetlands, or wetland buffers a professional site assessment shall be conducted to identify any wetland indicators within 300 feet of a proposed project or activity.
B. 
The following map references shall be used to assist in making a determination:
1. 
Wetlands mapped under the National Wetland Inventory by the U. S. Department of Interior, Fish and Wildlife Service;
2. 
Areas mapped as hydric soils under the Soil Survey of Skagit County Area, Washington, by the United States Department of Agriculture, Natural Resources Conservation Service (NRCS);
3. 
A water of the state as defined under WAC 222-16-030 and maintained in the Washington State Department of Natural Resources Stream Type Maps; and
4. 
Wetlands previously identified through the methodology specified under this title for another project.
(Ord. 1853 § 2 (Exh. B), 2018; Ord. 1933 § 1 (Exh. A), 2023)
If a wetlands site assessment is required, it shall meet the following requirements:
A. 
A wetland reconnaissance shall be performed by a qualified wetlands professional. The reconnaissance shall identify the presence of wetlands within 300 feet of the project or activity area. If this wetland reconnaissance demonstrates no wetlands within 300 feet of the activity area, then no further study is required.
B. 
A wetland delineation shall be performed as part of a site assessment where a wetland reconnaissance confirms the presence of a wetland or the applicant chooses to perform delineation instead of a wetland reconnaissance. The delineation shall be performed by a qualified wetland professional trained in conducting delineations in accordance with the methodology specified under this title.
C. 
If the site of a proposed development includes, is likely to include, or is within 300 feet of a wetland, a wetland report, prepared by a qualified professional, shall be required. The expense of preparing the wetland report shall be borne by the applicant.
D. 
Minimum Standards for Wetland Reports. The written report and the accompanying plan sheets shall contain the following information, at a minimum:
1. 
The written report shall include at a minimum:
a. 
The name and contact information of the applicant; the name, qualifications, and contact information for the primary author(s) of the wetland critical area report; a description of the proposal; identification of all the local, state, and/or federal wetland-related permit(s) required for the project; and a vicinity map for the project.
b. 
A statement specifying the accuracy of the report and all assumptions made and relied upon.
c. 
Documentation of any fieldwork, performed on the site, including field data sheets for delineations, rating system forms, baseline hydrologic data, etc.
d. 
A description of the methodologies used to conduct the wetland delineations, rating system forms, or impact analyses including references.
e. 
Identification and characterization of all critical areas, wetlands, water bodies, shorelines, floodplains, and buffers on or adjacent to the proposed project area. For areas off site of the project site, estimate conditions within 300 feet of the project boundaries using the best available information.
f. 
For each wetland identified on site and within 300 feet of the project site provide: the wetland rating, including a description of and score for each function, per wetland ratings of this title; required buffers; hydrogeomorphic classification; wetland acreage based on a professional survey from the field delineation (acreages for on-site portion and entire wetland area including off-site portions); Cowardin classification of vegetation communities; habitat elements; soil conditions based on site assessment and/or soil survey information; and to the extent possible, hydrologic information such as location and condition of inlet/outlets (if they can be legally accessed), estimated water depths within the wetland, and estimated hydroperiod patterns based on visual cues (e.g., algal mats, drift lines, flood debris, etc.). Provide acreage estimates, classifications, and ratings based on entire wetland complexes, not only the portion present on the proposed project site.
g. 
A description of the proposed actions, including an estimation of acreages of impacts to wetlands and buffers based on the field delineation and survey and an analysis of site development alternatives, including a no-development alternative.
h. 
An assessment of the probable cumulative impacts to the wetlands and buffers resulting from the proposed development.
i. 
A description of reasonable efforts made to apply mitigation sequencing pursuant to mitigation sequencing to avoid, minimize, and mitigate impacts to critical areas.
j. 
A discussion of measures, including avoidance, minimization, and compensation, proposed to preserve existing wetlands and restore any wetlands that were degraded prior to the current proposed land use activity.
k. 
A conservation strategy for habitat and native vegetation that addresses methods to protect and enhance on-site habitat and wetland functions.
l. 
An evaluation of the functions of the wetland and adjacent buffer. Include reference for the method used and data sheets.
m. 
An evaluation of flood and stormwater storage capacity, water quality functions, and an analysis of how the proposed development may impact these functions and values.
2. 
A copy of the site plan sheet(s) for the project must be included with the written report and must include, at a minimum:
a. 
Maps (to scale) depicting delineated and surveyed wetland and required buffers on site, including buffers for off-site critical areas that extend onto the project site; the development proposal; other critical areas; grading and clearing limits; areas of proposed impacts to wetlands and/or buffers (include square footage estimates).
b. 
A depiction of the proposed storm water management facilities and outlets (to scale) for the development, including estimated areas of intrusion into the buffers of any critical areas. The written report shall contain a discussion of the potential impacts to the wetland(s) associated with anticipated hydroperiod alterations from the project.
(Ord. 1853 § 2 (Exh. B), 2018; Ord. 1933 § 1 (Exh. A), 2023)
A. 
A regulated wetland or its required buffer can only be altered if the wetlands site assessment shows that the proposed alteration does not degrade the quantitative and qualitative functioning of the wetland, or any degradation can be adequately mitigated to protect the wetland function. Any alteration approved pursuant to this section shall include mitigation necessary to mitigate the impacts of the proposed alteration on the wetland as described in BMC § 14.15.220, Wetland mitigation standards.
B. 
Storm water discharges to wetlands shall be controlled and treated to provide all known and reasonable methods of prevention, control, and treatment as mandated in the State Water Quality Standards, chapter 173-201A WAC, as required by state law and implemented in chapter 14.05 BMC, Surface Water Management.
C. 
Wetland alterations shall not result in a net loss of flood or stormwater storage capacity within the Burlington urban growth area.
(Ord. 1853 § 2 (Exh. B), 2018; Ord. 1933 § 1 (Exh. A), 2023)
A. 
Mitigation Sequencing. Before impacting any wetland or its buffer, an applicant shall demonstrate that the following actions have been taken. Actions are listed in the order of preference:
1. 
Avoid the impact altogether by not taking a certain action or parts of an action.
2. 
Minimize impacts by limiting the degree or magnitude of the action and its implementation, by using appropriate technology, or by taking affirmative steps to avoid or reduce impacts.
3. 
Rectify the impact by repairing, rehabilitating, or restoring the affected environment.
4. 
Reduce or eliminate the impact over time by preservation and maintenance operations.
5. 
Compensate for the impact by replacing, enhancing, or providing substitute resources or environments.
6. 
Monitor the required compensation and take remedial or corrective measures when necessary.
B. 
Requirements for Compensatory Mitigation.
1. 
Compensatory mitigation for alterations to wetlands shall be used only for impacts that cannot be avoided or minimized and shall achieve equivalent or greater biologic functions. Compensatory mitigation requirements shall be consistent with Washington State Department of Ecology, U.S Army Corps of Engineers Seattle District, and U.S. Environmental Protection Agency Region 10 (2021) Wetland Mitigation in Washington State – Part 1: Agency Policies and Guidance (Version 2) (Ecology Publication No. 21-06-003), or as revised. Compensatory mitigation plans shall be consistent with Wetland Mitigation in Washington State: Part 2 – Developing Mitigation Plans Version 1, March 2006, Publication No. 06-06-011b, or as revised.
2. 
Mitigation ratios shall be consistent with subsection (G) of this section.
3. 
Mitigation requirements may also be determined using the credit/debit tool described in Calculating Credits and Debits for Compensatory Mitigation in Wetlands of Western Washington: Final Report (Ecology Publication No. 10-06-011, Olympia, WA, March 2012, or as revised) consistent with subsection (H) this section.
C. 
Compensating for Lost or Affected Functions. Compensatory mitigation shall address the functions affected by the proposed project, with an intention to achieve functional equivalency or improvement of functions. The goal shall be for the compensatory mitigation to provide similar wetland functions as those lost, except when either:
1. 
The lost wetland provides minimal functions, and the proposed compensatory mitigation action(s) will provide equal or greater functions or will provide functions shown to be limiting within a watershed through a formal Washington state watershed assessment plan or protocol; or
2. 
Out-of-kind replacement of wetland type or functions will best meet watershed goals formally identified by the city, such as replacement of historically diminished wetland types.
D. 
Preference of Mitigation Actions. Mitigation for lost or diminished wetland and buffer functions shall rely on the types below in the following order of preference:
1. 
Restoration (reestablishment and rehabilitation) of wetlands:
a. 
The goal of reestablishment is returning natural or historic functions to a former wetland. Reestablishment results in a gain in wetland acres (and functions). Activities could include removing fill material, plugging ditches, or breaking drain tiles.
b. 
The goal of rehabilitation is repairing natural or historic functions of a degraded wetland. Rehabilitation results in a gain in wetland function but does not result in a gain in wetland acres.
2. 
Creation (establishment) of wetlands on disturbed upland sites such as those with vegetative cover consisting primarily of nonnative species. Establishment results in a gain in wetland acres. This should be attempted only when there is an adequate source of water and it can be shown that the surface and subsurface hydrologic regime is conducive to the wetland community that is anticipated in the design.
a. 
If a site is not available for wetland restoration to compensate for expected wetland and/or buffer impacts, the approval authority may authorize creation of a wetland and buffer upon demonstration by the applicant's qualified wetland scientist that:
i. 
The hydrology and soil conditions at the proposed mitigation site are conducive for sustaining the proposed wetland and that creation of a wetland at the site will not likely cause hydrologic problems elsewhere;
ii. 
The proposed mitigation site does not contain invasive plants or noxious weeds or that such vegetation will be completely eradicated at the site;
iii. 
Adjacent land uses and site conditions do not jeopardize the viability of the proposed wetland and buffer (e.g., due to the presence of invasive plants or noxious weeds, storm water runoff, noise, light, or other impacts); and
iv. 
The proposed wetland and buffer will eventually be self-sustaining with little or no long-term maintenance.
3. 
Enhancement of significantly degraded wetlands in combination with restoration or creation. Enhancement should be part of a mitigation package that includes replacing the altered area and meeting appropriate ratio requirements. Enhancement is undertaken for specified purposes such as water quality improvement, flood water retention, or wildlife habitat. Applicants proposing to enhance wetlands or associated buffers shall demonstrate:
a. 
How the proposed enhancement will increase the wetland's/buffer's functions;
b. 
How this increase in function will adequately compensate for the impacts; and
c. 
How all other existing wetland functions at the mitigation site will be protected.
4. 
Preservation. Preservation of high-quality, at-risk wetlands as compensation are generally acceptable when done in combination with restoration, creation, or enhancement; provided, that a minimum of 1:1 acreage replacement is provided. Ratios for preservation in combination with other forms of mitigation generally range from 10:1 to 20:1, as determined on a case-by-case basis, depending on the quality of the wetlands being altered and the quality of the wetlands being preserved.
Preservation of high-quality, at-risk wetlands and habitat may be considered as the sole means of compensation for wetland impacts when the following criteria are met:
a. 
The area proposed for preservation is of high quality. The following features may be indicative of high-quality sites:
i. 
Category I or II wetland rating (using the wetland rating system for western Washington).
ii. 
Rare wetland type (for example, bogs, mature forested wetlands, estuarine wetlands).
iii. 
The presence of habitat for priority or locally important wildlife species.
iv. 
Priority sites in an adopted watershed plan.
b. 
Wetland impacts will not have a significant adverse impact on habitat for listed fish, or other ESA listed species.
c. 
There is no net loss of habitat functions within the watershed or basin.
d. 
Mitigation ratios for preservation as the sole means of mitigation shall generally start at 20:1. Specific ratios should depend upon the significance of the preservation project and the quality of the wetland resources lost.
e. 
Permanent preservation of the wetland and buffer will be provided through a conservation easement or tract held by a land trust, or land in public ownership.
f. 
The impact area is small (generally less than one-half acre) and/or impacts are occurring to a low-functioning system (Category III or IV wetland).
All preservation sites shall include buffer areas adequate to protect the habitat and its functions from encroachment and degradation.
E. 
Location of Compensatory Mitigation. Compensatory mitigation actions shall be conducted within the same subdrainage basin and on the site of the alteration except when all of subsections (E)(1) through (4) of this section apply. In that case, mitigation may be allowed off site within the subwatershed of the impact site. When considering off-site mitigation, preference should be given to using alternative mitigation, such as a mitigation bank, an in-lieu fee program, or advanced mitigation.
1. 
There are no reasonable opportunities on site or within the subdrainage basin (e.g., on-site options would require elimination of high-functioning upland habitat), or opportunities on site or within the subdrainage basin do not have a high likelihood of success based on a determination of the capacity of the site to compensate for the impacts. Considerations should include: anticipated replacement ratios for wetland mitigation, buffer conditions and proposed widths, available water to maintain anticipated hydrogeomorphic classes of wetlands when restored, proposed flood storage capacity, and potential to mitigate riparian fish and wildlife impacts (such as connectivity).
2. 
On-site mitigation would require elimination of high-quality upland habitat.
3. 
Off-site mitigation has a greater likelihood of providing equal or improved wetland functions than the altered wetland.
4. 
Off-site locations shall be in the same subdrainage basin unless:
a. 
Established watershed goals for water quality, flood storage or conveyance, habitat, or other wetland functions have been established by the city and strongly justify location of mitigation at another site; or
b. 
Credits from a state-certified wetland mitigation bank are used as compensation, and the use of credits is consistent with the terms of the certified bank instrument; or
c. 
Fees are paid to an approved in-lieu fee program to compensate for the impacts.
5. 
Wetland mitigation banks and off-site mitigation sites located outside of the city of Burlington's urban growth area shall only be used if necessary to accommodate an essential public facility and only when no feasible alternatives exists.
The design for the compensatory mitigation project needs to be appropriate for its location (i.e., position in the landscape). Therefore, compensatory mitigation should not result in the creation, restoration, or enhancement of an atypical wetland. An atypical wetland refers to a compensation wetland (e.g., created or enhanced) that does not match the type of existing wetland that would be found in the geomorphic setting of the site (i.e., the water source(s) and hydroperiod proposed for the mitigation site are not typical for the geomorphic setting). Likewise, it should not provide exaggerated morphology or require a berm or other engineered structures to hold back water. For example, excavating a permanently inundated pond in an existing seasonally saturated or inundated wetland is one example of an enhancement project that could result in an atypical wetland. Another example would be excavating depressions in an existing wetland on a slope, which would require the construction of berms to hold the water.
F. 
Timing of Compensatory Mitigation. It is preferred that compensatory mitigation projects be completed prior to activities that will disturb wetlands. At the least, compensatory mitigation shall be completed immediately following disturbance and prior to use or occupancy of the action or development. Construction of mitigation projects shall be timed to reduce impacts to existing fisheries, wildlife, and flora.
1. 
The community development director may authorize a one-time temporary delay in completing construction or installation of the compensatory mitigation when the applicant provides a written explanation from a qualified wetland professional as to the rationale for the delay. An appropriate rationale would include identification of the environmental conditions that could produce a high probability of failure or significant construction difficulties (e.g., project delay lapses past a fisheries window, or installing plants should be delayed until the dormant season to ensure greater survival of installed materials). The delay shall not create or perpetuate hazardous conditions or environmental damage or degradation, and the delay shall not be injurious to the health, safety, or general welfare of the public. The request for the temporary delay must include a written justification that documents the environmental constraints that include implementation of the compensatory mitigation plan. The justification must be verified and approved by the city.
G. 
Wetland Mitigation Ratios:
Category and Type of Wetland
Creation or Reestablishment
Rehabilitation
Enhancement
Category I: Bog, Natural Heritage Site
Not considered possible
Case by case
Case by case
Category I: Mature Forested
6:1
12:1
24:1
Forested I: Based on Functions
4:1
8:1
16:1
Category II
3:1
6:1
12:1
Category III
2:1
4:1
8:1
Category IV
1.5:1
3:1
6:1
H. 
Credit/Debit Method. To more fully protect functions and values, and as an alternative to the mitigation ratios found in the joint guidance "Wetland Mitigation in Washington State Parts I and II" (Ecology Publication No. 06-06-011a and b, Olympia, WA, March 2006), the community development director may allow mitigation based on the "credit/debit" method developed by the Department of Ecology in "Calculating Credits and Debits for Compensatory Mitigation in Wetlands of Western Washington: Final Report" (Ecology Publication No. 10-06-011, Olympia, WA, March 2012, or as revised).
I. 
Compensatory Mitigation Report. The report must include a written report and plan sheets that must contain, at a minimum, the following elements. Full guidance can be found in Wetland Mitigation in Washington State – Part 2: Developing Mitigation Plans (Version 1) (Ecology Publication No. 06-06-011b, Olympia, WA, March 2006, or as revised).
1. 
The written report must contain, at a minimum:
a. 
The name and contact information of the applicant; the name, qualifications, and contact information for the primary author(s) of the compensatory mitigation report; a description of the proposal; a summary of the impacts and proposed compensation concept; identification of all the local, state, and/or federal wetland-related permit(s) required for the project; and a vicinity map for the project.
b. 
Description of how the project design has been modified to avoid, minimize, or reduce adverse impacts to wetlands.
c. 
Description of the existing wetland and buffer areas proposed to be altered. Include acreage (or square footage), water regime, vegetation, soils, landscape position, surrounding land uses, and functions. Also describe impacts in terms of acreage by Cowardin classification, hydrogeomorpbic classification, and wetland rating, based on wetland ratings of this chapter.
d. 
Description of the compensatory mitigation site, including location and rationale for selection. Include an assessment of existing conditions: acreage (or square footage) of wetlands and uplands, water regime, sources of water, vegetation, soils, landscape position, surrounding land uses, and functions.
e. 
A description of the proposed actions for compensation of wetland and upland areas affected by the project. Include overall goals of the proposed mitigation including a description of the targeted functions, hydrogeomorphic classification, and categories of wetlands.
f. 
A description of the proposed mitigation construction activities and timing of activities.
g. 
A discussion of ongoing management practices that will protect wetlands after the project site has been developed, including proposed monitoring and maintenance programs (for remaining wetlands and compensatory mitigation wetlands).
h. 
A bond estimate for the entire compensatory mitigation project, including the following elements: site preparation, plant materials, construction materials, installation oversight, maintenance twice per year for up to five years, annual monitoring field work and reporting, and contingency actions for a maximum of the total required number of years for monitoring.
i. 
Proof of establishment of notice on title for the wetlands and buffers on the project site, including the compensatory mitigation areas.
j. 
Identify flood and stormwater storage impacts, water quality impacts, and floodplain habitat impacts affecting ESA-listed species. The mitigation report shall demonstrate how the proposed mitigation measures will prevent a net loss of floodplain habitat, water quality, and flood and stormwater storage functions and values.
2. 
The scaled plan sheets for the compensatory mitigation must contain, at a minimum:
a. 
Surveyed edges of the existing wetland and buffers, proposed areas of wetland and/or buffer impacts, location of proposed wetland and/or buffer compensation actions.
b. 
Existing topography, ground-proofed, at two-foot contour intervals in the zone of the proposed compensation actions if any grading activity is proposed to create the compensation area(s). Also existing cross-sections of on-site wetland areas that are proposed to be altered, and cross-section(s) (estimated one-foot intervals) for the proposed areas of wetland or buffer compensation.
c. 
Surface and subsurface hydrologic conditions, including an analysis of existing and proposed hydrologic regimes for enhanced, created, or restored compensatory mitigation areas. Also, illustrations of how data for existing hydrologic conditions were used to determine the estimates of future hydrologic conditions.
d. 
Conditions expected from the proposed actions on site, including future hydrogeomorphic types, vegetation community types by dominant species (wetland and upland), and future water regimes.
e. 
Required wetland buffers for existing wetlands and proposed compensation areas. Also, identify any zones where buffers are proposed to be reduced or enlarged outside of the standards identified in this chapter.
f. 
A plant schedule for the compensation area, including all species by proposed community type and water regime, size and type of plant material to be installed, spacing of plants, typical clustering patterns, total number of each species by community type, timing of installation.
g. 
Performance standards (measurable standards reflective of years post-installation) for upland and wetland communities, monitoring schedule, and maintenance schedule and actions by each biennium.
J. 
Buffer Mitigation Ratios. Impacts to buffers shall be mitigated at a 1:1 ratio. Compensatory buffer mitigation shall replace those buffer functions lost from development.
K. 
Protection of the Mitigation Site. The area where the mitigation occurred and any associated buffer shall be located in a critical area tract or a conservation easement or land in public ownership.
L. 
Monitoring. Mitigation monitoring shall be required for a period necessary to establish that performance standards have been met, but not for a period less than five years. If a scrub-shrub or forested vegetation community is proposed, monitoring may be required for 10 years or more. The project mitigation plan shall include monitoring elements that ensure certainty of success for the project's natural resource values and functions. If the mitigation goals are not obtained within the initial five-year period, the applicant remains responsible for restoration of the natural resource values and functions until the mitigation goals agreed to in the mitigation plan are achieved.
M. 
Wetland Mitigation Banks.
1. 
Credits from a wetland mitigation bank may be approved for use as compensation for unavoidable impacts to wetlands when:
a. 
The bank is certified under state rules;
b. 
The city determines that the wetland mitigation bank provides appropriate compensation for the authorized impacts; and
c. 
The proposed use of credits is consistent with the terms and conditions of the certified bank instrument;
d. 
The proposed development activity involves an essential public facility and there are no feasible mitigation alternatives to the use of wetland mitigation bank credits.
2. 
Replacement ratios for projects using bank credits shall be consistent with replacement ratios specified in the certified bank instrument.
3. 
Credits from a certified wetland mitigation bank may be used to compensate for impacts located within the service area specified in the certified bank instrument. In some cases, the service area of the bank may include portions of more than one adjacent drainage basin for specific wetland functions.
N. 
In-Lieu Fee. To aid in the implementation of off-site mitigation, the city may develop an in-lieu fee program. This program shall be developed and approved through a public process and be consistent with federal rules, state policy on in-lieu fee mitigation, and state water quality regulations. An approved in-lieu fee program sells compensatory mitigation credits to permittees whose obligation to provide compensatory mitigation is then transferred to the in-lieu program sponsor, a governmental or nonprofit natural resource management entity. Credits from an approved in-lieu fee program may be used when subsections (N)(1) through (6) of this section apply:
1. 
The approval authority determines that it would provide environmentally appropriate compensation for the proposed impacts.
2. 
The mitigation will occur on a site identified using the site selection and prioritization process in the approved in-lieu fee program instrument.
3. 
The proposed use of credits is consistent with the terms and conditions of the approved in-lieu fee program instrument.
4. 
Land acquisition and initial physical and biological improvements of the mitigation site must be completed within three years of the credit sale.
5. 
Projects using in-lieu fee credits shall have debits associated with the proposed impacts calculated by the applicant's qualified wetland scientist using the method consistent with the credit assessment method specified in the approved instrument for the in-lieu fee program.
6. 
Credits from an approved in-lieu fee program may be used to compensate for impacts located within the service area specified in the approved in-lieu fee instrument.
O. 
Advance Mitigation. Mitigation for projects with pre-identified impacts to wetlands may be constructed in advance of the impacts if the mitigation is implemented according to federal rules, state policy on advance mitigation, and state water quality regulations.
P. 
Exceptions to Mitigation Requirements. Requirements for mitigation do not apply under the following circumstances:
1. 
When a wetland alteration is intended exclusively for the enhancement or restoration of an existing regulated wetland and the proposal will not result in a loss of wetland function and value, subject to the following conditions:
a. 
The enhancement or restoration project shall not be associated with a development activity.
b. 
An enhancement or restoration plan shall be submitted for site plan review. The restoration or enhancement plan must include the information required under this title.
2. 
When a wetland is a part of a development activity that is permitted by the Corps of Engineers NWP permitting crossing of wetlands as part of road construction.
(Ord. 1853 § 2 (Exh. B), 2018; Ord. 1933 § 1 (Exh. A), 2023)
[1]
Ratios for rehabilitation and enhancement may be reduced when combined with 1:1 replacement through creation or reestablishment. See Table 1a, Wetland Mitigation in Washington State – Part 1: Agency Polices and Guidance – Version 1 (Ecology Publication No. 06-06-011a, Olympia, WA, March 2006 or as revised). See also subsection (D)(4) of this section for more information on using preservation as compensation.