Prior to commencing any excavation or disturbance of the surface of a public right-of-way, all persons or entities must obtain an excavation permit from the public works director. Excavation or disturbance of the public right-of-way includes, but is not limited to, construction, reconstruction, grading, oiling, repair, or opening of a sidewalk, street, or curb.
(Ord. 1544 § 1, 2022)