The purpose of this chapter is to establish, in accordance with Chapter 80.60 RCW, rules and procedures for determining the terms and conditions governing the interconnection of electric generating facilities with a maximum generating capacity of not more than 100 kilowatts to the town of Eatonville electric distribution system.
(Ord. 2016-11 § 1 (Exh. A), 2016)