Skip to content
home
Home
code
Code
Code
law
Laws (1)
New Laws (1)
Law Ledger (0)
help_center
Help
Help
About Us
ecode
search
Login
City of Palmdale, CA
chevron_right
chevron_right
Municipal Code
chevron_right
Title 13 Sanitary Sewers and Industrial Waste
chevron_right
Chapter 13.08 PERMITS, FEES, DESIGN AND INSPECTION REQUIREMENTS
Chapter 13.08
PERMITS, FEES, DESIGN AND INSPECTION REQUIREMENTS
Article I
Sewer Permit Required
§ 13.08.010
Sanitary sewer policy.
§ 13.08.020
Sewer permit required when – Period of validity.
§ 13.08.030
Permits – Issuance authorized when.
§ 13.08.040
Exception.
§ 13.08.050
Application – Form and contents.
§ 13.08.060
Plan approval prerequisite to issuance.
§ 13.08.070
Permit from other agencies required.
§ 13.08.080
Connections to trunk sewers – Permit requirements.
§ 13.08.090
Sewer permit – Determination of capacity – Agreement on future assessments.
§ 13.08.100
Manhole inspection permit.
§ 13.08.110
No transferability of permits.
Article II
Fees
§ 13.08.120
Connection to public sewer – Payment of fees required.
§ 13.08.130
Fees – Estimated valuation procedures.
§ 13.08.140
Sewer capacity fee (connection fee) – Designated.
§ 13.08.150
Tapping fee established, payment required when.
§ 13.08.160
Area and connection charges in reimbursement districts.
§ 13.08.170
Tap fee.
§ 13.08.180
Manhole inspection fee.
§ 13.08.190
Consolidated sewer maintenance district withdrawal fees.
§ 13.08.200
Sewer maintenance charges.
§ 13.08.210
Geographical information system (GIS) fees.
§ 13.08.220
Charges for substantial increase in public sewer capacity.
§ 13.08.230
Refund procedures.
Article III
Design Standards
§ 13.08.240
Sanitary sewer system design standards.
§ 13.08.250
Copy of the City Engineering Design Guidelines maintained by Director of Public Works.
§ 13.08.260
Participation in project – Letter requirements.
§ 13.08.270
Dedication of sewers.
§ 13.08.280
Exceptions to requirements authorized when.
§ 13.08.290
Plan preparation by registered civil engineer.
§ 13.08.300
Sewer plans.
§ 13.08.310
Materials and construction – Conformity with standard specifications.
§ 13.08.320
Sewer easement requirements.
Article IV
Inspections
§ 13.08.330
Inspection by City – Requirements.
§ 13.08.340
Notice to City when ready for inspection.
§ 13.08.350
Work to be convenient and uncovered.
§ 13.08.360
Using facilities before inspection prohibited – Exceptions.
§ 13.08.370
CCTV inspection of sewers prior to acceptance.
§ 13.08.380
Correction of defective work.
§ 13.08.390
Certificate of final inspection – Conditions.
Article V
Maintenance
§ 13.08.400
Injuring or removing sewers or equipment.
§ 13.08.410
Manholes – Opening or entering prohibited.
§ 13.08.420
Reconnection following violations – Conditions – Cost reimbursement.
§ 13.08.430
Reimbursement for repairs and maintenance following violations.