A.
For both minor and major stormwater permits, the applicant shall provide a financial security to the municipality for the timely installation and proper construction of all stormwater management controls as required by the approved SWM site plan and this chapter, equal to 110% of the full construction cost of the required controls in accordance with the Municipalities Planning Code.
B.
For minor stormwater permits, the required amount of financial security may be calculated as described Appendix D[1] for the applicable BMP types. For major stormwater permits, or for BMP types other than the ones described in Appendix B, the applicant shall submit an itemized cost estimate for the stormwater improvements based on the quantities and installed unit cost of each material used in construction of the subject facilities.
[1]
Editor's Note: The appendix is included as an attachment at the end of this chapter.
C.
At the completion of the project and as a prerequisite for the release of the financial security, the applicant shall:
(1)
Provide a certification of completion from an engineer, architect, surveyor or other qualified professional, verifying that all permanent facilities have been constructed according to the SWM site plan and report and approved revisions thereto.
(2)
The applicant shall demonstrate that all required inspections by the municipal engineer have been completed and the items inspected were found to be satisfactory. Required inspections by the municipal engineer shall be per the schedule of required inspections described in § 247-20 for major stormwater permits, or in accordance with Appendix D for minor stormwater permits.
(3)
Provide a set of record drawings.
(4)
Request a final inspection from the municipality to certify compliance with this chapter, after receipt of the certification of completion and record drawings by the municipality.