The following regulations shall apply in all special flood hazard areas:
(1)
Anchoring and Construction Techniques.
(a)
All new construction and substantial improvements shall be:
(i)
Anchored to prevent flotation, collapse or lateral movement of the structure; and
(ii)
Constructed using materials and utility equipment resistant to flood damage; and
(iii)
Constructed using methods and practices that minimize flood damage; and
(iv)
Electrical, heating, ventilation, plumbing, and air-conditioning equipment and other service facilities shall be designed and/or otherwise elevated or located so as to prevent water from entering or accumulating within the components during conditions of flooding.
(b)
All manufactured homes must likewise be anchored to prevent flotation, collapse or lateral movement, and shall be installed using methods and practices that minimize flood damage. Anchoring methods may include, but are not limited to, use of over-the-top or frame ties to ground anchors (Reference FEMA's Manufactured Home Installation in Flood Hazard Areas guidebook for additional techniques). Anchoring shall meet the specifications set forth below for structures located within one hundred feet of a floodway or the ordinary high water mark if no floodway has been established.
(c)
All new construction and any improvements or additions to existing floodproofed structures that would extend beyond the existing floodproofing located within one hundred feet of the floodway, or one hundred feet of the ordinary high water mark if no floodway has been established, shall be elevated to a height equal to or greater than the base flood, using zero-rise methods such as piers, posts, columns, or other methodology, unless it can be demonstrated that non-zero-rise construction methods will not impede the movement of floodwater or displace a significant volume of water. The size and spacing of any support devices used to achieve elevation shall be designed to penetrate bearing soil, and be sufficiently anchored, as specified above in subsection (1)(a) of this section.
(d)
Except where otherwise authorized, all new construction and substantial improvements to existing structures shall require certification by a registered professional engineer, architect or surveyor that the design and construction standards are in accordance with adopted floodproofing techniques.
(2)
Utilities. All new and replacement water supply systems and sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharge from the systems into floodwaters; and on-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding.
(3)
Subdivision Proposals. Subdivision proposals shall:
(a)
Be consistent with the need to minimize flood damage;
(b)
Have roadways, public utilities and other facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage;
(c)
Have adequate drainage provided to reduce exposure to flood damage; and
(d)
Include base flood elevation data.
(4)
Watercourse Alterations. The flood-carrying capacity within altered or relocated portions of any watercourse shall be maintained. Prior to the approval of any alteration or relocation of a watercourse in riverine situations, the department shall notify adjacent communities, the Department of Ecology and FEMA of the proposed development.
(Ord. 14-2007 § 1 (Exh. A) (part), 2007)