The City may require the pretreatment of waste to produce effluent which does not exceed the limitations imposed by this chapter or laws or regulations of the state or federal government or other regulatory agencies. Any facilities or equipment which a user utilizes for pretreatment of waste shall be provided and maintained at the user's expense. Detailed plans showing the pretreatment facilities and operating procedures shall be submitted to the City for review and shall be approved by the Director before the construction of the facility. The review and approval of the plans and operating procedures shall in no way relieve the user from the responsibility of modifying the facility as necessary to produce an effluent complying with the provisions of this chapter or the requirements of other regulatory agencies. Any subsequent changes in the pretreatment facilities or methods of operation shall be reported to, and be approved by, the Director prior to such construction or installation.
(895-CS, Enacted, 04/11/1996; 1018-CS, Renumbered, 02/12/2004, Renumbered from 6-4-701)