Connection Required. No property within the City limits shall dispose of sewage other than into the POTW. The introduction of septic tank waste or waste hauled from other jurisdictions is prohibited.
B.
Permit Required. No property within the City or within a territory hereafter annexed to the City shall tie into or connect with the POTW without first obtaining a permit from the City.
C.
Connection Fee. Each applicant for a permit shall pay a connection fee as set forth by resolution.
D.
Issuance of Permit – Specifications for Connections. The Director upon receipt of the fee shall issue the permit and at the time of issuance inform the person to whom the permit is issued of the location of the tie-in connection. All connections made with the sewer system shall be in conformity with plans and specifications approved by the Director and are subject to inspection by the Director.
E.
Connection – Outside City Limits. Premises situated outside the City may, upon issuance of a permit pursuant to subsection B of this section, be connected to the POTW, by paying all costs and fees appropriate thereto, as set forth by ordinance, and thereafter paying the user fees set in DMC § 14.01.211.
F.
Screening Requirements. Domestic sewage, consisting essentially of human waste, may be passed into the POTW without screening. Industrial waste must be screened through the equivalent of twenty (20) mesh screen. No peach, plum, cherry, apricot, or other fruit pits may be discharged or permitted to enter into the POTW.
G.
Installation – Means of Measurement. The Director shall determine what commercial businesses and industries should be required to install an approved means of measurement, including but not limited to an improved flume or an automatic recording device. The measurement of sewage may be required to determine the amount of the user charge and/or to monitor flows.