Contents of a construction stormwater pollution prevention plan shall be consistent with the requirements and examples cited in this chapter, the manual, NPDES Phase II permit Appendix 1, and Chapters 2 and 5 of the Sumner Development Specifications and Standard Details including required written descriptions and calculations. Erosion and sediment control BMPs shall be designed/prepared and stamped by a civil engineer licensed to practice in the state of Washington. The required contents of geotechnical engineering reports shall be established on a project-by-project basis.
(Ord. 2316 § 1 (part), 2010; Ord. 2356 § 11 (part), 2011)