A. 
Prior to approval of a stormwater site plan, the applicant shall submit to the city a proposed inspection and construction schedule. The city engineer or his or her designee shall conduct inspections and file reports for periodic inspections necessary during construction of stormwater management systems to ensure compliance with the approved plans.
B. 
No work shall proceed until the city inspects and approves the work previously completed and furnishes the applicant with the results of the inspection reports as soon as possible after completion of each required inspection.
C. 
Any portion of the work which does not comply shall be promptly corrected by the applicant, after notice from the city. The notice shall set forth the nature of corrections required and the time within which corrections will be made.
D. 
The applicant shall notify the city before commencing any work in conjunction with the stormwater site plan. The applicant shall notify the city in writing when the project is ready for final inspection.
E. 
Inspection requirements are specified in Chapters 2 and 5 of the Sumner Development Specifications and Standard Details.
(Ord. 2316 § 1 (part), 2010; Ord. 2356 § 11 (part), 2011)
Inspections shall be conducted as specified in Sumner Development Specifications and Standard Details, Chapter 2, Section 2.5. It is the responsibility of the applicant or his/her assignee to notify the city permit center at the completion of the specified phases of work for inspections and for scheduling of future inspections.
(Ord. 2316 § 1 (part), 2010; Ord. 2356 § 11 (part), 2011)
Unscheduled inspections may be made by the city engineer or his or her designee in addition to routine scheduled inspections to enforce any of the provisions of this chapter, or wherever the city engineer or his or her designee has reasonable cause to believe that violations of this chapter are present or operating on a property or portions thereof. The city engineer or his or her designee may enter such premises at all reasonable times for the purposes of inspection or to perform any duty imposed by this chapter; provided, that if such premises or portion thereof is occupied, he/she shall first make a reasonable effort to locate the owner or other person having charge or control of the premises or portion thereof and demand entry. The city engineer or his or her designee may charge fees for such unscheduled inspections pursuant to SMC § 13.48.325 and as set by the city council in the Sumner utility rate and fee schedule.
(Ord. 2316 § 1 (part), 2010; Ord. 2356 § 11 (part), 2011)