A.
Prior to approval of a stormwater site plan, the applicant shall submit to the city a proposed inspection and construction schedule. The city engineer or his or her designee shall conduct inspections and file reports for periodic inspections necessary during construction of stormwater management systems to ensure compliance with the approved plans.
B.
No work shall proceed until the city inspects and approves the work previously completed and furnishes the applicant with the results of the inspection reports as soon as possible after completion of each required inspection.
C.
Any portion of the work which does not comply shall be promptly corrected by the applicant, after notice from the city. The notice shall set forth the nature of corrections required and the time within which corrections will be made.
D.
The applicant shall notify the city before commencing any work in conjunction with the stormwater site plan. The applicant shall notify the city in writing when the project is ready for final inspection.
E.
Inspection requirements are specified in Chapters 2 and 5 of the Sumner Development Specifications and Standard Details.
(Ord. 2316 § 1 (part), 2010; Ord. 2356 § 11 (part), 2011)