It is the responsibility of the permittee or his/her assignee to notify the city engineer at the completion of the following phases of work for inspections and for scheduling of future inspections:
A. 
Preconstruction Inspection. Prior to the commencement of any other work, the inspection of sediment and erosion control devices shall take place when installation of all the sediment and erosion control devices has been completed according to approved plans. Only the minimum area necessary for installation of the sediment and erosion control devices shall be cleared and/or graded prior to this inspection.
B. 
Rough Grading Inspection. When all rough grading is complete inspection of the site shall take place to determine the satisfactory functioning of all sediment and erosion control devices.
C. 
Final Inspection. Upon completion of all construction, inspection of the site shall take place to determine that all temporary sediment and erosion control devices have been removed and that the site has been permanently stabilized.
(Ord. 1529 § 6.1, 1991)
Unscheduled inspections may be made by the city engineer in addition to routine scheduled inspections to enforce any of the provisions of this chapter, or wherever the city engineer has reasonable cause to believe that violations of this chapter are present or operating on a property or portions thereof. The city engineer may enter such premises at all reasonable times, for the purposes of inspection or to perform any duty imposed by this chapter; provided that, if such premises or portion thereof is occupied, he/she shall first make a reasonable effort to locate the owner or other person having charge or control of the premises or portion thereof, and demand entry. The city engineer may charge fees for such unscheduled inspections pursuant to SMC § 16.05.380 and as set by the city council in the fee schedule.
(Ord. 1529 § 6.2, 1991)