The contractor shall maintain the entire highway and related highway facilities located within the project between the beginning of the project and end of the project from the date construction begins until the contractor receives a letter of substantial completion. The contractor shall maintain these areas continually and effectively on a daily basis, with adequate resources to keep them in satisfactory condition at all times. The contractor shall maintain those areas outside the project that are affected by the work, such as haul routes, detour routes, structures, material sites and equipment storage sites during periods of their use.
The contractor shall repair damage done to work or highways or haul routes to the satisfaction of the Bristol Bay Borough manager.
(Ord. 2007-11 § 3 (part), 2008)