A. All improvements installed shall conform to the requirements of this title and the standards, specifications, inspections and procedures as set forth by the Department of Public Works, and shall be installed in accordance with the following procedures:
1. Work shall not commence until plans have been checked for adequacy and approved by the Department of Public Works to the extent necessary for the evaluation of the proposal. Plans shall be prepared in accordance with the requirements of the City.
2. Work shall not commence until the Department of Public Works has been notified in advance and, if work has been discontinued for any reason, it shall not be resumed until the Department of Public Works has been notified.
3. Public improvements shall be constructed under the inspection and to the satisfaction of the Director of Public Works. The Director of Public Works may require changes in typical sections and details if unusual conditions arise during construction to warrant the change.
4. All underground utilities, sanitary sewers and storm drains installed in the streets shall be constructed prior to street surfacing. Stubs for service connections and underground utilities and sanitary sewers shall be placed to a length obviating the necessity for disturbing the street improvements when surface connections are made.
5. Plans showing all improvements as built shall be filed with the City upon completion of the improvements.
(Ord. 2740, 10/17/2024; Ord. 2764, 6/9/2025)