Application for conditional use permit, administrative use permit, building permit, and other related requests may include any combination of site plans, surveys, maps, technical reports, or written narratives necessary to convey the following information in addition to the requirements of the zoning code and other applicable ordinances:
A. Photo simulations of the proposed facility from affected residential properties and public rights-of-way at varying distances;
B. A site elevation and landscaping plan indicating the specific placement of the facility on the site, the location of existing structures, trees, and other significant site features, the type and location of plant materials used to screen the facility, and the proposed colors) of the facility;
C. A signed statement indicating that:
1. The applicant and landowner agree that they will diligently negotiate in good faith to facilitate co-location of additional personal wireless service facilities by other providers on the applicant's structure or within the same site location; and
2. The applicant and/or landlord agree to remove the facility within 60 days after abandonment;
D. Copies of any environmental documents required by any federal agency. These shall include the environmental assessment required by FCC Para. 1.1307, or, in the event that an FCC environmental assessment is not required, a statement that describes the specific factors that obviate the requirement for an environmental assessment;
E. A site plan clearly indicating the location, type and height of the proposed tower and antenna, on-site land uses and zoning, adjacent land uses and zoning, adjacent roadways, proposed means of access, setbacks from property lines, elevation drawings of the proposed tower, and any other proposed structures;
F. A current map and aerial showing the location of the proposed tower, a map showing the locations and service areas of other personal wireless service facilities operated by the applicant and those proposed by the applicant that are close enough to impact service within the city;
G. Legal description of the parcel, if applicable;
H. The approximate distance between the proposed tower and the nearest residential unit, platted residentially zoned properties, and unplatted residentially zoned properties;
I. A landscape plan showing specific landscape materials;
J. Method of fencing, finished color and, if applicable, the method of camouflage and illumination;
K. A letter signed by the applicant stating the tower will comply with all FAA regulations and EIA standards and all other applicable federal, state, and local laws and regulations;
L. A statement by the applicant as to whether construction of the tower will accommodate co-location of additional antennas for future users;
M. Certification that the antenna usage will not interfere with other adjacent or neighboring transmission or reception functions;
N. The telecommunications company must demonstrate that it is licensed by the FCC if required to be licensed under FCC regulations;
O. The applicant, if not the telecommunications service provider, shall submit proof of lease agreements with an FCC licensed telecommunications provider if such telecommunications provider is required to be licensed by the FCC;
P. A full site plan shall be required for all sites, showing the tower, antenna, antenna support structure, building, fencing, buffering; access, and all other items required in this chapter. The site plan shall not be required if the antenna is to be mounted on an existing structure; and
Q. At the time of site selection, the applicant should demonstrate how the proposed site fits into its overall network within the city.
(Ord. 1244-16 § 3 (Exh. A))