A.
Applicability. No building or land shall be occupied or used, the use of an existing building or land shall not be changed, and no building or other structure shall be constructed, reconstructed, altered, extended or enlarged in whole or in part for any purpose until a Zoning Permit shall have been issued by the Zoning Enforcement Officer showing conformance:
B.
Application procedures.
(1)
An application for a Zoning Permit shall be accompanied by plans and/or other information that comply with the requirements in the Appendix of these Regulations.
(2)
If all requirements of these Regulations are met, the Zoning Permit shall generally be issued within 30 days; otherwise, the permit shall be denied for stated reasons.
(3)
In the event that any Zoning Permit is issued based on incorrect information or the specific conditions of approval are not adhered to strictly, such Zoning Permit shall be null and void.