Final storm sewer, water and underground service plans must be submitted to the city engineer for approval prior to actual construction of these utilities. If any changes are made during installation, revised drawings showing the exact location of the utilities must be furnished. All underground utilities, sanitary sewer or storm drains installed in the streets shall be constructed prior to the surfacing of such streets. Service connections for all underground utilities and sanitary sewers shall be laid to such lengths as will obviate the necessity for disturbing the street improvements, when service connections thereto are made.
(Ord. 693 § 1, 1994)