Before any such permit is granted, the applicant must pay the City such fees as are specified in other applicable ordinances or resolutions, and furnish a plan of the proposed connection or sewer in accordance with the then-current permit application requirements, together with whatever other information is required on application forms furnished by the City to the applicant. Said plan shall show the course of the sewer from the connection with the street main or service lateral to its other terminus, with the location of all branches, cleanouts, traps and fixtures to be connected therewith. Said plan shall be correct, and conform to the Engineering Details and Specifications of the City.
It shall be the responsibility of the contractor or owner to provide the City with an as-built drawing of all repair work including any changes made in the routing or materials of any side sewer or service lateral sewer or the relocation, deletion, or addition of any cleanouts.
(Formerly 13.20.130; Ord. 158 § 15, 1959; Ord. 702, 1969; Ord. 2759 § 24, 2019; Ord. 2792 § 5, 2021; Ord. 2857 § 1 (Exh. A), 2024)