Application for such permit shall be made on a printed form furnished by the town. The applicable permit fee shall be paid at the time of application. The minimum inspection fee shall be paid prior to the issuance of the permit. Any inspection fee in excess of the minimum fee, shall be paid prior to approval and use of the town water service connection. The water system development fee shall be paid in accordance with Section 13.04.300.
(Ord. 412 § 6.01, 1993)