Persons wishing to take a supply of water from a fire hydrant must make application to the Water Department for such service. The Department will make the necessary connections and install a meter of required size upon payment of a service charge established by resolution of the City Council.
When water is required for construction purposes of any type, upon making proper application a service connection will be made with a main or at a hydrant at the most accessible point to the construction work. When the connection is not sufficiently accessible and water must be taken to the work in a tank wagon or barrel, such supply shall be taken through the meter as installed. In no case will water be furnished for any purpose except through a meter, and unless paid for.
(Formerly 13.05.400; Ord. 241 § 40, 2000; Ord. 356 § 1, 2017)