A.
The Board of Health shall require that each individual lot shall meet all applicable requirements of Title V and the Board of Health. Two groundwater observation holes and two percolation tests must be performed on each lot to prove a suitable primary and expansion area for each lot. This requirement shall also apply to a subdivision for which a preliminary or definitive plan has been submitted.
B.
Deep observation holes for the determination of groundwater elevations may be performed during the months of March and April. Use of holes conducted in months other than March and April will be limited to Class II and Class III soils, with a percolation rate of greater than five minutes/inch. Observation holes in March and April may be required by the Board of Health or its agent at their discretion on all sites. Out of season soil testing for upgrades are allowed without a variance.
C.
Deep observation holes must be completely refilled within 12 hours of being witnessed by the Board of Health or its agent.
D.
A lot must be inspected by the Board of Health or its agent when it is clear of snow before a sewage disposal works construction permit may be issued.
E.
There must be a minimum of five feet of pervious material between the bottom of the leaching facility and the groundwater elevation and/or any impervious layer. The offset above groundwater may be increased depending upon climatic and/or site conditions encountered.