A developer who wishes to extend sewer facilities must employ a civil engineer registered in Arizona to perform the field engineering and prepare detailed plans and specifications for the sewer extension. The final detailed plans and specifications for the main sewer extension must be approved by the Arizona State Department of Health Services and by the council before construction begins. The design and engineering will be in accordance with the specifications of the Arizona State Department of Health Services and the town prior to construction. The construction shall meet the town's specifications, requirements and approval and will be subject to inspection by the town's agents during construction. Subject to the provisions of this title, the town agrees to permit the developer to connect into the town's existing trunk sewer lines and the main sewer line to be constructed by the developer herein provided. Individual lines shall be not less than four-inch lines or larger if determined by the sewer department and a cleanout must be installed not less than one on any line with a turn equal to 22.5 degrees or more.
(Prior code § 12-3-1; Ord. 89-05, 1989)