The purpose of the City of Everson's cross-connection control program shall be to protect the public water system from contamination or pollution via cross-contamination as defined in WAC 246-290-010, or as amended.
(Ord. 693, 2009)
Type of Service | Schedule |
|---|---|
New connections with potential cross-connection hazards | Before service is initiated |
Existing connections with potential high health cross-connection hazards | Within 90 days after notification |
Existing connections with potential severe health cross-connection hazards | Within 180 days after notification |
Existing fire protection systems using chemicals or supplied by unapproved auxiliary water source | Within 90 days after notification |
Existing fire protection systems not using chemicals and supplied by purveyor's water | Within one year after notification |