After approval of a tentative map by the planning commission and, prior to the expiration of the approved tentative map or any approved extension of time as provided by this title, the land divider shall cause a final map to be prepared by a registered civil engineer or a licensed land surveyor in accordance with a complete survey of the division of land and in substantial compliance with the approved tentative map and the conditions of approval thereof, and with the provisions of the Subdivision Map Act and this title. The requirement for a survey of the division of land shall be waived if the approved tentative map complies with the following conditions:
(a)
The division of land shall not result in more than two lots;
(b)
Each of the two lots resulting from the division of land shall front on an existing city street;
(c)
Each of the two lots resulting from the division of land shall be of such size, width and depth that a subsequent division of either of said lots could not result in additional conforming lots.
(Ord. 233 Sec. 5.1, 1972; Ord. 291 Sec. 2, 1974)