Any permit or variance that is granted shall be used within two years from the effective date thereof, or within such time as may be set in the conditions of approval, which shall not exceed a total of five years, except that a permit or variance in connection with a land division shall remain in effect during the same period of time that the land division is in effect. The term "used" shall mean the beginning of substantial construction of the use for which the permit or variance has been granted, which constructed must thereafter be pursued diligently to completion, or the actual occupancy of existing buildings or land under the terms of the authorized permit or variance, or the recording of the final or parcel map in connection with an approved land division.
(Ord. 501 Sec. 8 (part), 1983)