The purpose of Chapter 19.75 SVMC is to establish transitional development regulations along zoning district boundaries, specifically where properties of more intensive zoning abut less intensively zoned properties.
General. The transition shall be provided in the form of a ground level setback of 10 feet, or the applicable setback pursuant to Chapter 19.70 SVMC, Density and Dimensions, whichever is greater, and an upper level setback as provided in SVMC § 19.75.030(A)(2) and illustrated in Figure 19.75-1.
Starting at a height of 15 feet at the boundary of an R-1, R-2, R-3, or R-4 zone, the building height may be increased at a ratio of one foot of height for every one foot of horizontal distance from the nearest R-1, R-2, or R-3 zone boundary. Figure 19.75-1 provides a graphic illustration of this requirement.
Where the protected zone boundary is the centerline of a right-of-way, the horizontal distance calculation in SVMC § 19.75.030(A)(2)(a) shall be measured from the property line of the zone providing protection. Figure 19.75-1 provides a graphic illustration of this requirement.
Parking, drive aisles, and/or queuing areas in the RC, CMU, MU, IMU, and I zones are prohibited within 20 feet of any R-1, R-2, R-3, or R-4 zone. All parking and drive aisles shall be landscaped and screened pursuant to SVMC § 22.70.050 and § 22.70.070.
Any mechanical equipment, building vents, and exhausts within the transitional setback areas shall be visually screened pursuant to SVMC § 22.70.070. All building vents and mechanical equipment exhausts shall be directed away from adjacent R-1, R-2, R-3, or R-4 zone.
All outdoor lighting in the transitional setback areas shall be shielded and not produce off-site glare pursuant to SVMC § 22.60.030 and shall be limited to 16 feet in height above grade.
In the ground level transitional setback areas of the I and IMU zones, the following uses are prohibited within 30 feet of a R-1, R-2, R-3, R-4, or MFR zone: