Any person conducting an activity within the jurisdiction of the Port Gamble S’Klallam Reservation that will or is likely to significantly impact the environment shall be required to obtain a permit from the Port Gamble S’Klallam Tribe under this title prior to commencing the activity. Activities requiring a permit include, but are not limited to, the following:
(a)
Preparation of a site for the construction of a building or area for purpose of business use or public use;
(b)
The construction of any structure except single family residences and construction which expands the square footage of the exterior of an existing structure by more than 500 square feet.
(c)
New road construction or road widening;
(d)
Road construction or repair and right of way maintenance that alters a natural drainage course;
(e)
Construction, installation, or repair of culverts and drainage ditches;
(f)
Construction of any water related project regardless of the nature or extent of the construction activity;
(g)
Any docks or other projects of a permanent or semi-permanent nature which interfere with the normal use of the tidelands or surface of the waters overlying lands within the Port Gamble S’Klallam Reservation at any state of water level;
(h)
Dredging; drilling; dumping; filling; removal of any sand, gravel or minerals; bulk heading; diking; rip rapping; or driving of piling;
(i)
Timber harvesting;
(j)
Spraying or other application of pesticides and herbicides, except for use by single family residences;
(k)
Clearing and grading involving the removal of more than 150 cubic yards of soil, sand, or gravel; and
(Res. 04-A-053 6/8/2004)