The following procedures shall apply after construction activity is completed.
(1)
Upon completion of any storm water improvements, the owner or authorized agent shall also submit a certification letter signed by a registered design professional to the City Engineer which states that the improvements have been completed in accordance with the project specifications and all ordinances and specifications of the City.
(2)
The inspection and completion of construction of public storm water improvements shall comply with the final approved subdivision engineering standards or any revisions thereto that have been accepted in writing by the City Engineer.
(3)
After final stabilization of the site is achieved, the owner or authorized agent shall submit a written notice of termination for the City Engineer to terminate the permit. The notice shall contain the following information.
(4)
The City Engineer shall terminate the permit after determining that final stabilization has been achieved.