The fee for each International Building Code, International Residential Code, or Washington State Energy Code permit shall be as established by the taxes, rates and fees schedule adopted by ordinance.
(Ord. 1738 § 12, 2021)
Relocation (preinspection) | Per Table 1-A |
Housing inspection | Actual city cost, subject to Table 1-A |
Change of use | Per Table 1-A |
Fuel tank installation (per tank) | $50.00 |
Fuel tank removal (per tank) | $50.00 |
Table 2-A – Mechanical Permit Fees | ||
|---|---|---|
Mechanical Permit Issuance | Residential | Commercial |
For the issuance of each mechanical permit | $35.00 | $50.00 |
For issuing each supplemental permit for which the original permit has not expired, been canceled or finaled | $15.00 | $25.00 |
Unit fee schedule (in addition to the issuance fee): | ||
Furnace/unit heater | $20.00 | |
Furnace ≤160,000 BTU/h | $25.00 | |
Furnace >160,000 BTU/h | $37.50 | |
Appliance vent | $10.50 | $12.75 |
Ventilation fan | $10.50 | $12.75 |
Boiler/compressor/absorption unit ≤3 HP and ≤100,000 BTU/h | $20.15 | $20.15 |
Boiler/compressor/absorption unit ≤15 HP and ≤500,000 BTU/h | $37.00 | $37.00 |
Boiler/compressor/absorption unit >15 HP but ≤30 HP and >500,000 BTU/h but ≤1,000,000 BTU/h | $50.75 | $50.75 |
Boiler/compressor/absorption unit >30 HP but ≤50 HP and >1,000,000 BTU/h but ≤1,750,000 BTU/h | $75.50 | $75.50 |
Boiler/compressor/absorption unit >50 HP and >1,750,000 BTU/h | $120.00 | $120.00 |
Air-handling unit ≤10,000 cubic feet per minute | $17.00 | $20.00 |
Air-handling unit >10,000 cubic feet per minute | $18.10 | $25.00 |
Evaporative coolers/or AC unit | $17.00 | $25.00 |
Exhaust hood, residential kitchen | $17.00 | |
Exhaust hood, Type II | $23.50 | |
Exhaust hood, Type I | $33.00 | |
Incinerator | $24.50 | $37.00 |
Miscellaneous appliances | $17.00 | $17.00 |
Initial plan review (includes first re-check) (does not include SF residential) | An amount equal to 65% of the determined mechanical permit fee | |
Other Inspections and Fees: | |
A three percent technology surcharge will be added to every permit issued (minimum $3.00).2 | |
1. Inspections outside of normal business hours (minimum charge: two hours) | $85.00 per hour1 |
2. Reinspection fees assessed under provisions of NBMC § 15.02.1000 | $100.00 |
3. Inspections for which no fee is specifically indicated (minimum charge: one-half hour) | $85.00 per hour1 |
4. Additional plan review required by changes, additions or revisions to plans (minimum charge: one-half hour) | $85.00 per hour1 |
5. For use of outside consultants for plan checking and inspections, or both | Cost of service + 15 percent administrative fee |
6. Investigation fees assessed under provisions of NBMC § 15.02.1200 | Equal to mechanical permit fee |
7. Public Improvement Projects Fee Waiver. The city administrator may, in his or her discretion, waive any or all of the permit fees required under the International Building Code, and any amendments thereto, for any public improvement project for which the city is providing some or all of the funding. | |
Notes: |
|---|
1 Or the total hourly cost to the jurisdiction, whichever is greater. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. |
2 The technology surcharge shall be two percent ($2.00 minimum) for cottage and multifamily structures as defined in NBMC § 18.06.030 or identified in Table 18.10.030. |
FEE DESCRIPTION | RATE |
|---|---|
Fire Staff Hourly Rate | $182 |
Fire Alarm System | |
Modification (monitoring, device swap, tenant improvement, etc.) | $455 |
New Systems | $1,637 |
Fire Alarm Communicator/Transmitter | $273 |
Fire Sprinkler System (one permit per riser required) | |
Tenant Improvement (20 heads or less) | $546 |
New Systems and Tenant Improvements over 20 heads (fee charged per zone) | $1,728 |
Residential 13D System | $728 |
Fire Sprinkler System 13D Tank and Pump | $1,001 |
Fire Extinguishing/Suppression System – New systems and modifications | $910 |
Underground Supply Permits – Commercial and residential (excludes single-family residential) | $1,637 |
Standpipe Installation – Class I, II, or III | $1,274 |
Application/Processing | |
Other Types of Fire Permits/Inspections | |
Tents and Canopies, Temporary Membrane Structures (per tent) | $364 |
Fire Pump Installation | $910 |
Power Generators | $0 |
Emergency Responder Radio | $637 |
Stairway Pressurization and Smoke Control Plans | $910 |
Permitted Hazardous Materials | $546 |
Flammable/Combustible Liquids/Construction | |
Tank Install | $546 |
Tank Removal | $364 |
LPG Construction | |
Install or Modify LP-Gas System/Construction | $546 |
Tank Install – Residential (R-3) >120 Gallons | $364 |
Compressed Gas System, Install, Modify, or Remove | $546 |
Inspection/Testing, If Requested and/or Required | Hourly rate |
Rack Storage/High Pile Storage | $546 |
Building Plan Review | 15% (BLD Review Fee) |
Land Use Plan Review (Subdivisions, Plats, etc.) | Hourly rate |
Fees include anticipated review and inspection time. Most fees cover two inspections and one reinspection, with additional inspections billed at an hourly rate | |
Reinspection fees: When a portion of work for which inspection is called is not complete, approved plans and permits are not on the site or when corrections called for are not made | Hourly Rate |
Inspections outside normal business hours | Hourly Overtime Rate (min. two hours) |
Cost Recovery Statement: Costs for planning, engineering, legal and/or other professional services shall be reimbursed by the applicant, in addition to a 10% administrative fee. |
Table 3-A Plumbing Permit Fees | ||
|---|---|---|
Plumbing Permit Issuance | Residential | Commercial |
For the issuance of each plumbing permit | $35.70 | $45.90 |
For issuing each supplemental permit for which the original permit has not expired, been canceled or finaled | $15.30 | $22.95 |
Unit Fee Schedule (in addition to the issuance fee): | ||
For each additional plumbing fixture on one trap or a set of fixtures on one trap | $9.55 | $12.90 |
For each building and each trailer park sewer | $15.00 | $15.00 |
Rainwater systems – per drain (inside building) | $9.55 | $12.90 |
For each water heater and/or vent | $9.55 | $12.90 |
For each industrial waste pretreatment interceptor including its trap and vent, except kitchen-type grease interceptors functioning as fixture traps | $9.55 | $12.90 |
For each installation, alteration or repair or water piping and/or water treatment, each | $9.55 | $12.90 |
For each repair or alteration of a drainage or vent piping, each fixture | $9.55 | $12.90 |
For each lawn sprinkler system on any one meter including backflow protection devices therefor | $9.55 | $12.90 |
For atmospheric-type vacuum breakers, one to five | $7.00 | $10.30 |
Additional atmospheric-type vacuum breakers exceeding five, each | $1.65 | $1.65 |
Backflow protective device other than atmospheric-type vacuum breakers: ≤ 2-inch | $17.05 | $23.20 |
Backflow protective device other than atmospheric-type vacuum breakers: > 2-inch | $45.40 | $53.05 |
For initial installation and testing for a reclaimed water system | $34.00 | $46.40 |
For each annual cross-connection testing of a reclaimed water system | $34.00 | $46.40 |
For each medical gas piping system serving one to five inlet(s)/outlet(s) for a specific gas | $87.70 | |
Additional medical gas inlet(s)/outlet(s), each | $7.75 | |
Gas piping system, one to five outlets | $7.00 | $10.30 |
Additional gas piping outlets, each | $1.65 | $1.65 |
Bathtub/shower | $9.55 | $12.90 |
Bidet | $9.55 | $12.90 |
Clothes washer | $9.55 | $12.90 |
Dishwasher | $9.55 | $12.90 |
Drinking fountain | $9.55 | $12.90 |
Floor drain | $9.55 | $12.90 |
Grease trap | $9.55 | $12.90 |
Hose bib | $9.55 | $12.90 |
Ice maker | $9.55 | $12.90 |
Laundry tub | $9.55 | $12.90 |
Pressure reducing valve | $9.55 | $12.90 |
Roof drain | $9.55 | $12.90 |
Sink (kitchen/bath) | $9.55 | $12.90 |
Urinal | $9.55 | $12.90 |
Water closet | $9.55 | $12.90 |
Initial plan review (includes first re-check) (does not include SF residential) | An amount equal to 65% of the determined plumbing permit fee | |
Other Inspections and Fees: | |
A three percent technology surcharge will be added to every permit issued (minimum $3.00).2 | |
1. Inspections outside of normal business hours (minimum charge: two hours) | $85.00 per hour1 |
2. Reinspection fees assessed under provisions of NBMC § 15.02.1000 | $100.00 |
3. Inspections for which no fee is specifically indicated (minimum charge: one-half hour) | $85.00 per hour1 |
4. Additional plan review required by changes, additions or revisions to plans (minimum charge: one-half hour) | $85.00 per hour1 |
5. For use of outside consultants for plan checking and inspections, or both | Cost of service + 15 percent administrative fee |
6. Investigation fees assessed under provisions of NBMC § 15.02.1200 | Equal to plumbing permit fee |
7. Public Improvement Projects Fee Waiver. The city administrator may, in his or her discretion, waive any or all of the permit fees required under the International Building Code, and any amendments thereto, for any public improvement project for which the city is providing some or all of the funding. | |
Notes: |
|---|
1 Or the total hourly cost to the jurisdiction, whichever is greater. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. |
2 The technology surcharge shall be two percent ($2.00 minimum) for cottage and multifamily structures as defined in NBMC § 18.06.030 or identified in Table 18.10.030. |