Prior to any construction or installation of any buildings or utilities in a new or proposed mobile home park, or additions, extensions, and enlargement of any existing mobile home park, the owner or operator shall obtain approval from the community development director. All submitted plans shall be prepared by a licensed architect or engineer; provided, however, that an owner may develop his own drawings when he is capable of producing drawings equivalent to the conventional drawings of architects and engineers.
(Ord. 294 § 2.01, 1967; Ord. 1053 § 22, 1998; Ord. 1172 § 11, 2002; Ord. 1816 § 1, 2024)