Allow the director to modify interior lot-based or lot line requirements contained within the zoning, building, fire and other similar international codes adopted by the city;
Allow the director to authorize sharing of open space, parking, access and other improvements among contiguous properties subject to the binding site plan; and
Specify administrative requirements for binding site plans in addition to the procedural requirements of NBMC § 20.01.004 and in accordance with applicable Washington State and city of North Bend laws, rules and regulations.
Any person seeking the use of a binding site plan process to divide property for the purpose of sale, lease or transfer of ownership of commercial or industrial zoned property, lease of mobile homes or travel trailers, or creation of condominium units is required to have an approved binding site plan prior to any property division, as provided for in Chapter 58.17 or 64.90 RCW, and as required by this chapter. A binding site plan for a condominium shall be based on a recorded final planned unit development, a building permit, an as-built site plan for developed sites or a site development permit issued for the entire site or a general site plan showing the anticipated development plan for the entire site.
The site that is subject to the binding site plan may be reviewed independently for developed sites, concurrently with or subsequent to a site development permit application for undeveloped land or concurrently with or subsequent to a building permit application.
The binding site plan process creates or alters lot lines and does not authorize substantial improvements or changes to the property or the uses thereon.
The city shall review binding site plan applications as Type I administrative, nonexempt development permits under NBMC § 20.01.004 and Table 20.01.004.
(Ord. 1718 § 1 (part), 2020)
In addition to the minimum application requirements in NBMC Titles 17 and 20, including those required in NBMC § 17.08.150, the following are required to complete an application for a preliminary and final binding site plan:
A copy of any existing covenants, conditions, and restrictions, property owners' association bylaws, incorporation documents, and all other private restrictions or provisions currently applicable to the property; and
A copy of a title company certification (current within 60 days from filing of the binding site plan) confirming that the title of the lands as described and shown on the binding site plan is in the name of the owner(s) signing the binding site plan; and
Preliminary engineering plans, preliminary technical information report, and any preliminary reports and studies including, but not limited to: geotechnical report, traffic impact analysis, and wetland assessment.
Written documentation that all requirements for preliminary binding site plan approval are met, including the completion of all required infrastructure improvements; and
Reference by recording number to the covenants, conditions and restrictions and property owners' association incorporation documents applicable to the property; and
Upon submittal of a complete preliminary binding site plan application, as defined in NBMC § 17.20.024(A), the city shall notify the applicant, in writing, that the application is complete. A proposed binding site plan shall be vested at the time a fully completed application for binding site plan has been submitted to the city. A proposed binding site plan shall be considered under the zoning and other land use control ordinances in effect as of the date a fully completed application for binding site plan is submitted to the city.
Preliminary binding site plan applications shall be considered by the appropriate decision body as provided for within NBMC Title 20 for a Type I, administrative permit decision.
Preliminary binding site plan applications shall be reviewed for consistency with the city's comprehensive plan and the applicable development regulations in the North Bend Municipal Code.
If all requirements for approval are met, the community and economic development director ("director") shall provide written findings of fact supporting the approval of the preliminary binding site plan and set forth all conditions for final binding site approval.
The binding site plan shall ensure that the collective lots continue to function as one site with respect to, but not limited to, compliance with city design standards, lot access, interior circulation, open space, landscaping, drainage facilities, facility maintenance and parking;
The binding site plan shall ensure appropriate provisions are made for the public health, safety, and general welfare, and for such open spaces, drainage ways, streets or roads, alleys, other public ways, transit stops, potable water supplies, sanitary wastes, parks and recreation, playgrounds, schools and school grounds and all other relevant facts, including sidewalks and other planning features that assure safe walking conditions for students who only walk to and from school; and
The binding site plan shall ensure that environmentally critical areas, as defined in NBMC Title 14 and other applicable provisions in the NBMC, are protected.
Identification of the areas and locations of all streets, roads, improvements, utilities, open spaces, sensitive areas, parking areas, landscaped areas, surveyed topography for preliminary map, water bodies and drainage features and building envelopes;
Inscriptions or attachments setting forth such limitations and conditions for the use of the land as are established by the director or the hearing examiner, including, but not limited to, compliance with city design standards; and
Conditions of use, maintenance and restrictions on redevelopment of shared open space, parking, access and other improvements shall be identified and enforced by covenants, easements or other similar mechanisms.
All applicable processing fees specified by Chapter 20.09 NBMC and any civil penalty assessed pursuant to Chapter 20.10 NBMC against a site being reviewed under this section shall be paid prior to recording.
Preliminary approval of a binding site plan shall be effective for a period of 60 months. An extension up to three years may be granted by the director if:
Unforeseen circumstances and conditions which are not the result of voluntary actions of the applicant necessitate the extension of the preliminary binding site plan;
Conditions in the immediate vicinity of the subject property have not changed substantially since the preliminary binding site plan was first approved;
An extension of the preliminary binding site plan will not cause substantial detriment to existing uses in the immediate vicinity of the subject property or to the community as a whole;
The preliminary binding site plan substantially complies with applicable NBMC provisions in effect on the date that the application for extension was made.
Plans and reports shall be submitted to the department and prepared consistent with the requirements of the NBMC, including, but not limited to: the adopted city public works standards, Chapter 19.01 NBMC; the adopted surface water design manual; and conditions of preliminary approval. Each plan set or document shall be stamped, signed and dated by a civil engineer.
Engineering plans for roads, sewer, water, drainage controls and other proposed or conditioned improvements shall be prepared, submitted and reviewed for approval by the development engineer prior to the commencement of on-site clearing or construction activities.
Prior to issuance of a clearing and grading permit, the applicant shall post a site restoration guarantee consistent with the provisions of NBMC Title 19, and shall pay all applicable fees set forth in Chapter 20.09 NBMC.
Filing. A final binding site plan application shall be filed with the community and economic development department at such time as the property owner(s) intends to sell or lease a portion of property as approved in a preliminary binding site plan. Applications shall include a copy of any proposed declarations, covenants, conditions, and restrictions, property owners' association bylaws and incorporation documents, and all other private restrictions or provisions, not previously submitted to the city, which will become applicable to the subject property.
Limitations. A final binding site plan shall not be used to modify the provisions of the approved preliminary binding site plan, building permit, or final occupancy permit, other than to divide lots for sale or lease within areas designated for lot development in the preliminary binding site plan.
Review Procedures. Final binding site plan applications shall be reviewed for compliance with the conditions of the preliminary binding site plan, building permit, applicable planned unit development conditions, Chapter 64.90 RCW, and all other applicable laws and regulations in effect at the time of application.
Identify the areas and locations of all streets, roads, improvements, utilities, open spaces, sensitive areas, parking areas, landscaped areas, water bodies, drainage features and building envelopes; and
Contain inscriptions or attachments setting forth such limitations and conditions for the use of the land as are established by the director, including, but not limited to, compliance with city design standards; and
Approval and Recording. Upon determination of consistency with the preliminary binding site plan and the requirements in subsection D of this section, the final binding site plan shall be signed by the community development director and the public works director. Applicant shall then record the signed final binding site plan, a declaration that complies with RCW 64.90.225, and a map that complies with RCW 64.90.245 with the county auditor.
(Ord. 1718 § 1 (part), 2020)
Fees, as established by the taxes, rates and fees schedule adopted by ordinance, shall apply to preliminary and binding site applications governed by this chapter.
Alteration of an approved final binding site plan shall be accomplished by following the same process required for a new application as set forth in this chapter. Alterations that result in any substantial changes as determined by the department shall be treated as a new application for purposes of vesting and shall be reviewed as an administrative decision pursuant to NBMC § 20.01.004. For the purpose of this section, "substantial change" includes the creation of additional lots, the elimination or reduction of open space, or changes to conditions of approval of an approved preliminary binding site plan.
Changes to a building permit, planned unit development, subdivision or short subdivision, or site development permit within a binding site plan area shall also require alteration of the binding site plan unless the director determines that such changes are consistent with the approved binding site plan.
Vacation of a final binding site plan shall be accomplished by following the same procedure and satisfying the same laws, rules and conditions as required for a new binding site plan application, as set forth in this chapter. If a portion of a binding site plan is vacated, the property subject to the vacated portion shall constitute one lot unless the property is subsequently divided by an approved subdivision or short subdivision or another binding site plan.
If a building permit is revised or expires, then the binding site plan shall be vacated unless the director determines that the revision or expiration is consistent with the approved binding site plan.
Except for a binding site plan for a condominium, identification of lots by number on a binding site plan containing more than one lot. Tracts shall be similarly designated and each tract shall be clearly identified with the ownership and purpose;
Satisfaction of health department requirements, unless previously approved on a recorded final planned unit development, a building permit, an as-built plan for developed sites or a site development permit for the entire site;
Lots, parcels or tracts created through the binding site plan procedure shall be legal lots of record. All provisions, conditions and requirements of the binding site plan shall be legally enforceable on the purchaser or any other person acquiring a lease or other ownership interest of any lot, parcel, or tract created pursuant to the binding site plan.
No person shall sell, transfer or lease any lot, tract or parcel created pursuant to the binding site plan that does not conform to the requirements of the binding site plan or without binding site plan approval.
The binding site plan shall set forth limitations and conditions, including irrevocable dedications of property and containing a provision that any development of the site shall be in conformity with the approved binding site plan.
Any decision of the director may be appealed following the procedures set forth in the NBMC, including but not limited to Chapters 20.01 and 20.06 NBMC.