A. A final plat shall be prepared by a registered land surveyor and submitted for planning commission review following the board review of the concept plat. The plat shall comply with all the major subdivision final plat submission requirements in SGC §
21.20.160. The easements and improvements shall comply with all the applicable standards in Chapter
21.55 SGC. It must be submitted at least 13 days prior to the next planning commission meeting. Flagging may be required along the proposed plat’s existing or proposed boundaries or features as required by the platting authority pursuant to SGC §
21.55.160. Notices and a public hearing shall be required and given as provided for in Chapter
21.10 SGC.
B. In addition to providing a plat that conforms to the major subdivision final plat requirements, the following shall be submitted:
1. General topography of the site and immediate surroundings, showing specific topographic features and spot elevations. The purpose of this topography is to provide an understanding of the overall terrain of the site and to confirm the grades of access easements and rights-of-way. The planning commission may also require more detailed topographic information of existing and proposed grades.
C. The planning commission shall approve, deny, or approve with conditions the final plat at a regularly scheduled meeting and the action shall be given within 60 days of the date of submission of a complete final plat. A delay in commission action may be requested in writing by the applicant, may result from the application being incomplete, or may result from evidence requiring further city consideration. If the plat approval is denied or the applicant is not satisfied with the conditions placed on the plat, the matter shall be reconsidered by the planning commission unless the applicant files an appeal directly to the assembly.
D. After the final plat is approved, a recordable plat shall be prepared by a registered land surveyor including any required certificates as also required of a major subdivision, all applicable plat notes required by this title, and all plat notes required by the planning commission during the approval process. The recordable document shall reference all monuments that have been installed following the approval of the plat.
(S.G.C. 21.12.030; Ord. 03-1729 § 4, 2003; Ord. 18-07 § 4, 2018)