The zero lot line subdivision application, review and approval procedures shall be the same as those for minor subdivisions (Chapter 21.15 SGC) except as specified below:
A.
The exact locations of the structures shall be shown along with dimensions to each adjacent property line. This may be accomplished by either of the following methods:
B.
No construction beyond the footings and stem wall shall be permitted and commenced until plat approval has been completed.
C.
Upon the receipt of a detailed written request by the applicant, the municipality may approve an alternate zero lot line process on a case-by-case basis. In all instances, a plat must be approved by the city planning commission or assembly and shall comply with the documentation required elsewhere in this chapter.
(S.G.C. 21.24.010; Ord. 03-1729 § 4, 2003)