The SMP regulations directly support the adopted goals and policies for each shoreline designation and development, use, activity or structure. They reflect and are intended to preserve the special character of each designation. Each designation contains general regulations for allowed uses. Additional regulations including shoreline permitting requirements for developments, uses, structures and activities by designation are addressed in Table 18.50.600.
A. 
Shoreline uses not specifically identified in this SMP and for which regulations have not been developed will be evaluated on a case-by-case basis. They may be allowed subject to a conditional use permit. Such proposals must be consistent with the policies of the SMA, and the goals and general policies of this SMP including the character and management policies of the shoreline designation in which they are to be located.
B. 
In addition to the general regulations of Article II, this article identifies:
1. 
Specific uses;
2. 
General development standards for named uses; and
3. 
Development standards that apply to the different shoreline designations where appropriate.
C. 
Shoreline development, uses, structures and activities shall not result in a net loss of shoreline ecological functions or adversely impact other shoreline uses, resources and activities such as navigation, recreation and public access. Where critical area regulations are not met, adverse impacts to shoreline ecological functions must be mitigated consistent with SJCC § 18.50.140, § 18.50.150 and § 18.50.160.
(Ord. 1-2016 § 26)
A. 
General Regulations.
1. 
In accordance with SJCC § 18.50.130, buffers of permanent vegetation or other suitable soil erosion controls shall be established and maintained between tilled or grazed areas and associated water bodies and wetlands. The type and extent of such vegetation and other controls shall be of a width or character sufficient to capture sediments and other compounds.
2. 
Confined animal feeding operations, retention or storage ponds for feedlot wastes, and stockpiles of manure solids shall be located to prevent water contamination consistent with guidelines prepared by the U.S. Environmental Protection Agency and the requirements of state and local agencies.
3. 
Commercial feedlots are prohibited.
4. 
New agricultural activities in the shoreline jurisdiction shall be located, designed, constructed and managed in a manner that will result in no net loss of shoreline ecological functions.
B. 
Regulations by Designation.
1. 
Natural. Agricultural activities may be allowed in this designation subject to a conditional use permit; provided, that the resource to be protected by the natural designation will not be degraded.
(Ord. 1-2016 § 27; Ord. 11-2017 § 13)
A. 
General Regulations. Except as restricted in subsection (B) of this section, the following regulations apply to all aquaculture:
1. 
Shorelines within the County that are located seaward of the line of extreme low tide have been designated "shorelines of statewide significance."
2. 
Structures or facilities that would have a significant adverse impact on shoreline ecological functions are prohibited.
3. 
Private, noncommercial aquaculture activities that do not include development are not subject to this section.
4. 
No aquatic organism shall be introduced into County waters without prior written approval of the WDFW, WDNR, the County's noxious weed control board, or the appropriate regulatory agency for the specific organism proposed for introduction. Such approvals shall be submitted in writing to the department prior to the introduction of the organism or the granting of the permit decision, whichever comes first. Introduction, for purposes of this section, means the placement of any aquatic organism in any area within the waters of the County regardless of whether it is a native or resident organism within the County and regardless of whether it is being transferred from within or beyond County waters.
5. 
Unless required by the shoreline permit issued by the department, after a permit is issued for a specific organism, the repeated introduction of an approved organism in the same location does not require subsequent approval by the department.
6. 
Aquaculture shall comply with all applicable noise, light, glare, air pollution, and water quality standards including those in Chapter 18.60 SJCC. Aquaculture operations shall minimize adverse impacts to nearby residents. Some impacts from odor, noise and light may be unavoidable and will not be considered sufficient cause to deny a project application.
7. 
Aquaculture structures and equipment, except navigation aids, shall be designed, operated, and maintained to blend into their surroundings through the use of appropriate colors and materials. They shall not adversely impact the aesthetic qualities of the surrounding area.
8. 
The department may require commercial aquaculture applicants to provide a financial guarantee in an amount commensurate with the risk of injury or damage to any person, property, or shoreline ecological functions as a result of the project. Financial guarantees shall not duplicate the requirements of other agencies.
9. 
All aquaculture structures and facilities shall be marked in accordance with U.S. Coast Guard requirements.
10. 
Aquaculture structures and equipment shall be properly constructed and maintained. Abandoned or unsafe structures and equipment shall be removed or repaired promptly by the owner. The department requires a financial guarantee in an amount commensurate with the cost of their removal or repair if any structure might constitute a potential hazard to the public in the future. The department may abate an abandoned or unsafe structure in accordance with Chapter 7.48 RCW and may take action necessary to enforce the financial guarantee of the applicant. Evidence of the County's financial guarantee shall be considered independently of the requirements of other agencies.
11. 
Applications shall include adequate information to demonstrate that the proposed operation complies with this SMP. Applications shall include at least the following information, when applicable:
a. 
Species to be reared;
b. 
Aquaculture method(s) including the identification of all pesticides, herbicides, antibiotics, vaccines, growth stimulants, anti-fouling agents, feed or other chemicals the applicant anticipates using;
c. 
Number of employees;
d. 
Harvest and processing location, method, and timing;
e. 
Location and plans for any shoreside activities, including loading and unloading of the product, processing, and any use of freshwater supplies;
f. 
Methods of waste disposal and predator control;
g. 
An environmental assessment that includes the best available information on water quality, tidal variations, prevailing storm wind conditions, current flows, flushing rates, aquatic and benthic organisms, and probable impacts on water quality, macroalgae, biota, currents, littoral drift, and any shoreline or water uses existing on the date of application. Further baseline studies may be required depending upon the adequacy of available information, conditions existing on the date of the application, the nature of the proposal, and probable adverse environmental impacts. Applicants may submit documents previously submitted to other agencies. Baseline monitoring shall be at the applicant's expense unless otherwise provided for;
h. 
For floating aquaculture facilities, the department may require a visual impact analysis consisting of information comparable to that found in the WDOE's "Aquacultural Siting Study" of 1986; and
i. 
Other pertinent information deemed necessary by the director.
12. 
No pesticides, herbicides, antibiotics, vaccines, growth stimulants, anti-fouling agents, feed, chemicals or other such materials shall be used until approval is obtained from all appropriate state and federal agencies, including the U.S. Food and Drug Administration, the Washington Department of Agriculture, Washington Department of Health (WDOH), WDOE, and WDFW, and proof of such approvals has been submitted to the department.
13. 
Legally established aquaculture enterprises including authorized experimental projects shall be protected from incompatible uses that are proposed to locate nearby. Demonstration of a probability that such use would result in damage to or destruction of an aquaculture enterprise is grounds for the denial of that use.
14. 
Operational monitoring of commercial aquaculture facilities may be required to the extent necessary to determine, ensure, or confirm compliance with predicted or required performance. Monitoring shall be consistent with local, state and federal requirements. Monitoring requirements shall be established as a condition of the permit and shall be conducted at the applicant's or operator's expense.
15. 
No processing of any commercial aquaculture product, except for the sorting or culling of the cultured organism and the washing or removal of surface materials or organisms, shall occur in or over the water after harvest, unless specifically approved by permit. All other processing facilities shall be located on land and are also governed by the commercial development regulations.
16. 
Aquaculture waste must be disposed of in a manner that complies with all applicable waste disposal standards. No garbage, waste, or debris is allowed to accumulate at an aquaculture operation.
17. 
Projects involving substantial substrate modification shall be located 1,500 feet or more from areas identified in National Wildlife Refuge lands, marine protected areas and state or County parks. Lesser distances may be authorized by permit if the applicant demonstrates that the wildlife resource will be protected and the exception is supported by the reviewing resource agencies. Greater distances also may be required if recommended by the reviewing resource agencies.
18. 
Aquaculture uses and facilities may intrude into or over critical saltwater habitats where the public's need for such an action is clearly demonstrated and the proposal is consistent with the protection of the public trust; the project is consistent with the state's interest in resource protection and species recovery; an alternative alignment or location is not feasible; and potential adverse impacts are identified and mitigated to result in no net loss of shoreline ecological functions consistent with the requirements of SJCC § 18.50.140.
19. 
Predator control shall not involve the intentional killing or abusive harassment of birds or mammals. Approved controls include but are not limited to double netting for seals, overhead netting for birds, and three-foot-high fencing or netting for otters. The use of other nonlethal and nonabusive predator control measures requires the submittal of written approval from the National Marine Fisheries Service or U.S. Fish and Wildlife Service.
20. 
When feasible , the cleaning of nets and other apparatus shall be accomplished by air drying, spray washing, or hand washing.
21. 
For commercial aquaculture projects using over-water structures, the storage of necessary tools and apparatus seaward of the OHWM is limited to containers not more than three feet in height as measured from the surface of the floating aquaculture facility or dock. However, in locations where the visual impact of the proposed commercial aquaculture structures will be minimal, storage containers of greater height may be authorized by the decision-maker. In such cases, the burden of proof is on the applicant.
22. 
Materials that are not necessary for the immediate and regular operation of the facility shall not be stored seaward of the OHWM.
23. 
Mechanical clam harvesting or other actions that involve substrate modification through dredging, trenching or digging are prohibited in all eelgrass beds.
24. 
Commercial finfish net pens are prohibited.
25. 
Commercial aquaculture proposals that include floating aquaculture facilities shall not be located closer than one nautical mile to any other commercial floating aquaculture facility. A lesser distance may be authorized by the decision-maker if the applicant can demonstrate that the ecological and aesthetic protection requirements of this SMP will be met. If a lesser distance is requested, the applicant must demonstrate that the cumulative impacts of the existing and proposed operations will not be contrary to the regulations of this SMP.
26. 
Experimental and noncommercial aquaculture developments shall not exceed five acres in area (except anchorage for floating aquaculture systems and restoration projects) and five years in duration. The decision-maker may, however, issue a new permit to continue an experimental project as many times as is necessary and appropriate.
27. 
When it is necessary to preserve the integrity of collectible research data, commercial aquaculture project applications will be reviewed for potential adverse impacts on experimental and noncommercial aquaculture developments existing at the time of application. If there is evidence that an additional project would likely jeopardize a noncommercial or experimental aquaculture project, the commercial project will not be allowed within the same bay, harbor, or cove, or within one mile of such a development if the water body is larger than one square mile in area, until after the experimental project is granted nonexperimental status or terminated.
28. 
If it is determined that proposed new commercial aquaculture projects are likely to affect water quality and pose potential adverse impacts to an allowed and currently established aquaculture operation, a separate administrative review will be completed prior to issuing any project permit(s). The director may request research or an analysis to be prepared by appropriate experts to assist the department in determining marine water quality impacts. No project permit will be granted for a new project if it is likely to damage or destroy the established aquaculture operation.
29. 
A conditional use permit is required for commercial geoduck aquaculture. Subsequent cycles of planting and harvesting do not require a new conditional use permit. A single conditional use permit may be submitted for multiple sites within an inlet, bay or other defined feature, provided the sites are all under the control of the same applicant.
30. 
Geoduck operations shall be located where sediments, topography, and land and water access can accommodate operations without adversely impacting shoreline ecological functions.
31. 
Applications shall identify management practices that will be implemented to address impacts from mooring, parking, noise, lights, litter, and other activities associated with geoduck planting and harvesting operations.
B. 
Small Scale Shellfish Aquaculture.
1. 
Small scale shellfish aquaculture and supplemental wildstock seeding that do not adversely impact shoreline ecological functions or aesthetic qualities are allowed in the nearshore waters with a certificate of exemption; provided, that it does not:
a. 
Intrude into critical saltwater habitats on shorelines of statewide significance unless there is no feasible alternative; and
b. 
Exceed the shoreline substantial development permit exemption criteria in SJCC § 18.50.040(D)(1).
2. 
Applications for shellfish aquaculture and supplemental wildstock seeding operations shall demonstrate compliance with all state and federal requirements including:
a. 
Hydraulic project approval or joint aquatic resources permit application from the WDNR;
b. 
Certification and license from the WDOH; and
c. 
Shellfish import or shellfish transfer permits from WDFW.
3. 
A conditional use permit is required if projects conflict with public access, navigation, or adversely impact critical saltwater or freshwater habitats.
4. 
Applications for certificates of exemption for shellfish aquaculture shall include the information required under subsection (A)(11) of this section, as applicable.
C. 
Regulations by Designation.
1. 
Rural Residential. Floating aquaculture facilities may be allowed within 1,500 feet of the OHWM if a visual impact analysis is submitted with the application and approved.
2. 
Conservancy. Aquaculture activities are allowed in this designation; provided, that natural resources and ecological functions will not be significantly altered; and proposed structures and facilities, both terrestrial and aquatic, will not have a significant adverse impact on the aesthetic qualities of the surrounding area.
3. 
Natural. Aquaculture activities that do not require structures, facilities or mechanized harvest practices and will result in no net loss of shoreline ecological functions are allowed.
4. 
Aquatic. Aquaculture activities are allowed in this designation subject to the regulations of the most restrictive abutting shoreline designation. This is determined on a case-by-case basis but is generally the shoreline designation visible within 1,500 feet directly landward of the center of the project site. The regulations of a less restrictive abutting designation may be substituted if the director determines that the public interest would not be compromised.
(Ord. 1-2016 § 28; Ord. 11-2017 § 14)
A. 
General Regulations.
1. 
All over-water structures including boating facilities, docks, piers, mooring buoys, and mooring and recreational floats must be designed to avoid or minimize adverse impacts on marine and aquatic life, and the shore process corridor and its operating systems. Over-water structures are restricted to the minimum size necessary to meet the requirements of the proposed water-dependent use.
2. 
All over-water structures must be sited and designed to avoid or minimize the need for new and maintenance dredging.
3. 
The construction of all over-water structures including new, modifications or replacements of existing facilities must meet the applicable design criteria established by the WDFW in WAC 220-660-140 and 220-660-380 relative to materials, siting, disruption of currents, restrictions of tidal prisms, flushing characteristics, and fish passage to the extent that those criteria are consistent with protection of the shore process corridor and its operating systems.
4. 
At least one safety ladder must be placed on the long side of all new or enlarged main floats at 60-lineal-foot intervals.
5. 
In general, only one form of moorage or other structure for boat access to the water is allowed on a single lot. A mooring buoy may be allowed to serve single lots, and areas with community use docks, boat ramps and railways. In addition, multiple forms of moorage or structures for boat access to the water may be allowed on a single lot if:
a. 
Each form of boat access to water serves a public or commercial recreational use, provides public access, is a part of a marina facility, or serves an historic camp or resort; or
b. 
The location proposed for multiple boat access structures is common area owned by or dedicated by easement to the joint use of the owners of at least 10 shoreline lots.
6. 
Provided the structure will result in no net loss of shoreline ecological functions, storage structures are allowed on private docks, floats, and piers. Except as provided in SJCC § 18.50.280, structures on private docks, floats and piers may be up to three feet in height and 24 square feet in size. The height of buildings providing waiting areas on public docks used for marine transportation may be up to 10 feet in height. Storage buildings on publicly owned over-water structures and marinas are allowed where no feasible alternative exists; provided, that they are no larger than 100 square feet and six feet tall. In all cases, height is measured from the deck surface to the highest point of the structure.
7. 
Public access and ecological restoration shall be incorporated into publicly financed projects when feasible.
8. 
Multiple use and expansion of existing over-water structures are preferred over construction of new over-water structures.
9. 
The order of preference for over-water structures is:
a. 
Mooring buoys;
b. 
Existing marinas;
c. 
Moorage and recreational floats unattached to a pier or floating dock;
d. 
Boating facilities, docks and ramps serving five or more residences;
e. 
Joint use or community docks; and
f. 
Single use docks.
10. 
Applicants for a shoreline substantial development permit for boating facilities, joint use community docks, private docks, piers, moorage floats and buoys shall demonstrate how the proposed development will be designed, constructed and maintained to minimize adverse impacts. Impacts must be mitigated in accordance with SJCC § 18.50.140, § 18.50.150 and § 18.50.160. At a minimum, potential impacts to the following shall be evaluated:
a. 
Littoral drift;
b. 
Sand movement;
c. 
Water circulation and quality;
d. 
Fish and wildlife;
e. 
Navigation;
f. 
Scenic views; and
g. 
Public access to the shoreline.
11. 
Boating facilities that are expected to interfere with the normal erosion-accretion process associated with feeder bluffs are prohibited.
12. 
Abandoned or unsafe over-water structures shall be removed or repaired promptly by the owner. The department may abate an abandoned or unsafe structure in accordance with Chapter 7.48 RCW.
13. 
Boats moored at residential boating facilities shall not be used for commercial overnight accommodations.
B. 
Regulations – General Design and Construction Standards.
1. 
Nontoxic materials should be used in construction. Use of treated wood containing toxic compounds should be minimized and may only be used where nontoxic materials are deemed infeasible and as allowed by this subsection as follows:
a. 
Piers, docks and floats shall be constructed of materials that comply with requirements of federal and state regulations.
b. 
Wood products treated with creosote or pentachlorophenol are prohibited on all new structures or repair projects that come in contact with or could leach into water.
c. 
No treated wood may be used for the decking on the over-water structures.
d. 
Treated wood can be used for all structural elements of the over-water structure.
e. 
Treated wood materials may be utilized on pilings in repair projects for timber structures.
f. 
All treated wood used in the aquatic environment shall be restricted to those that have met or exceed the industry BMP manual standards found in Best Management Practices for the Use of Treated Wood in Aquatic Environments: USA Version as revised (Western Wood Preservers Institute, Vancouver, WA).
g. 
Instead of wood, technologies such as EZ Dock or fiber optic lighting may be allowed consistent with the recommendations of state and federal agencies and with the approval of the director.
2. 
Pilings employed in piers or any other structure shall have a minimum vertical clearance of one foot above the extreme high water of marine shorelines or OHWM of lakes.
3. 
All floats shall have stops that serve to keep the bottom of the float off tidelands at low tide or off the substrate in lakes.
4. 
Nonbiodegradable materials used in float, pier, or dock construction shall be shielded and enclosed to prevent disintegration.
5. 
Overhead wiring and plumbing are prohibited on boating facilities, joint use and private docks, and piers.
6. 
New or relocated boathouses and covered moorages are prohibited on boating facilities except as allowed for railway systems in SJCC § 18.50.290(E).
7. 
Dock lighting shall shine downward, be of a low wattage, and not exceed a height of three feet above the dock surface. All lighting must be consistent with SJCC § 18.50.200.
8. 
All construction-related debris shall be disposed of properly and legally. Any debris that enters the water shall be removed promptly. Where feasible, floats shall be secured with anchored cables in place of pilings. The cabling must have a mid-line float or similar mechanism to keep the cable from dragging and disturbing the bottom substrates, vegetation and aquatic life.
9. 
Over-water structures must be marked with reflectors, or otherwise identified to prevent unnecessarily hazardous conditions for water surface users during the day or night. In general, the exterior finish of all structures shall be nonreflective and a color that will visually blend with the background.
(Ord. 1-2016 § 29)
A. 
Boating facilities must not intrude into or over shoreline critical areas unless all of the following criteria are met:
1. 
The public need for an intrusion is demonstrated and the proposal protects the public trust, as embodied in RCW 90.58.020. To demonstrate how the project protects the public trust, the applicant shall submit a narrative demonstrating that the proposal:
a. 
Is consistent with the goals and policies and regulations of this SMP;
b. 
Benefits the public by providing physical or visual access to the shoreline; and
c. 
Will not have an adverse impact on the navigability of adjacent waters.
2. 
No feasible alternative exists.
3. 
The project and any required mitigation will result in no net loss of shoreline ecological functions associated with critical fresh and saltwater habitat.
4. 
The project is consistent with the state's interest in resource protection and species recovery.
B. 
The location, construction, management, and, if necessary, mitigation of adverse impacts of new and expanded boating facilities and associated accessory uses must conform with SJCC § 18.50.140, § 18.50.150 and § 18.50.160 and result in no net loss of shoreline ecological functions.
C. 
Boating facilities must be the minimum size needed to accommodate the intended use as demonstrated by the demand analysis required in SJCC § 18.50.330.
D. 
Private boating facilities designs may not accommodate more than one boat per residential unit except that one additional space for every 10 residential units served is allowed to accommodate guests.
E. 
Boating facilities shall be set back at least 10 feet from side property lines. However, a boating facility may be located adjacent to or upon a side property line when mutually agreed to by contract or by covenant with the owners of the adjacent property. A copy of such contract or covenant must be recorded with the County auditor in a format approved by the department to run with each parcel's titles.
(Ord. 1-2016 § 30)
A. 
Joint use community docks are required when docks are proposed as part of new land divisions.
B. 
Single-family and community joint use docks, moorage and recreational floats serving four or fewer residential units may not intrude into or over shoreline critical areas unless the following criteria are met:
1. 
Avoidance of impacts to critical salt and freshwater habitats by an alternative alignment or location is not feasible; and
2. 
The project including required mitigation will result in no net loss of shoreline ecological functions associated with critical fresh and saltwater habitat.
C. 
Applications for single-family and joint use docks, moorage and recreational floats serving four or fewer residential units may not be approved unless the applicant demonstrates that:
1. 
The facilities existing at the time of application are not adequate or feasible for use; and
2. 
Alternative moorage such as mooring buoys, mooring floats, boating facilities and joint use facilities is not adequate or feasible.
D. 
The size and dimensions of single-family and joint use docks, moorage and recreational floats are provided in Table 18.50.260.
1. 
The use regulations apply to single-family and community joint use docks, and moorage and recreational floats serving four or fewer residential units.
2. 
Deviations from the dimensional standards are subject to a shoreline variance.
Table 18.50.260. Single-family and community joint use docks, and moorage and recreational floats serving four or fewer residential units
Moorage Element
Marine and Lake
Number
No more than one dock, moorage float, or mooring buoy is generally allowed per residential shoreline lot.
Type
Docks must be fixed pile or combination of fixed pile and floating.
Width
Single-family and joint use community docks.
• Pier: six feet.
• Float: eight feet.
• Ramp: cannot exceed five feet.
Length
• Pier and ramp: length as needed to extend float to position where moorage can occur with rise and fall of tides without resulting in either float or vessel grounding or adversely affecting the substrate.
• A pier shall not extend offshore farther than 50 feet beyond the extreme low tide contour in marine waters.
• Single-family and joint use community docks float length: 30 feet for single use, 60 feet for joint use or deviations may be allowed; applicants must demonstrate the alternative is the minimum necessary to achieve purpose and will minimize expected adverse impacts.
Area
• Moorage floats unconnected to the land: 250 square feet.
• Recreational floats unconnected to the land: 150 square feet.
• Single-family dock: 700 square feet including ramp, pier and float.
• Joint use dock (two users): 1,400 square feet including ramp, pier and float.
• Joint use dock (three to four users): 2,000 square feet including ramp, pier and float.
Height
The bottom of any piers or the landward edge of any ramp must be the maximum height feasible, but not less than one and one-half feet above the OHWM. The freeboard height on all floats must be at least 10 inches.
Decking
• Pier: Effective grating is not required if width is four feet or less, otherwise decking and effective grating must cover a minimum of 30 percent of the deck surface.
• Single-family float: Decking and effective grating must cover 30 percent of the deck surface if the float is six feet wide or less. Floats greater than six feet wide require decking and effective grating that covers 50 percent of the deck surface.
• Joint use floats must have decking and effective grating that covers 50 percent of the float surface.
• Ramps must be fully grated.
Orientation
As close to north/south as feasible to minimize shadows. Also see the WDFW guidelines in WAC 220-660-380 and 220-660-140 as amended.
Safety ladders
Every 60 lineal feet each long side of main floats.
Boat and watercraft lifts
Prohibited.
Covered moorage watercraft lift canopies
Prohibited.
(Ord. 1-2016 § 31)
A. 
Substantial development permits for new docks or piers serving a commercial or industrial enterprise will not be approved unless the permit application contains information from nearby commercial and industrial enterprises regarding their water access needs and plans. Where more than one enterprise needs and could use a single moorage facility, permits for individual facilities will not be granted.
B. 
Bulk fuel storage (retail or wholesale) for gasoline, oil, and other petroleum products for any use or purpose is prohibited on piers and docks.
C. 
Spill containment and clean-up equipment shall be available for prompt response and application at all piers and docks involved in the transfer of gas, petroleum, oil and hazardous products.
(Ord. 1-2016 § 32)
A. 
Over-water structures in marinas shall not be wider than eight feet, except that the director may approve larger widths based upon the submittal of documentation consistent with SJCC § 18.50.330.
B. 
Over-water structures in marinas must be no longer than needed to achieve the intended use, as demonstrated by the demand analysis requirement in SJCC § 18.50.330.
C. 
Dredging or filling of wetlands for the sole purpose of constructing a marina is prohibited.
D. 
No new marina will be approved for construction within one-half mile of any outfall of a domestic or industrial sewage treatment facility except as a conditional use.
E. 
All service facilities within or associated with a marina must maintain a spill prevention plan and equipment to prevent pollutants from entering the water.
F. 
Commercial covered moorages may be allowed only where vessel construction or repair work is the primary activity and covered work areas are necessary over water.
G. 
Marina-related structures or uses that are not water-dependent shall not be located over water.
H. 
Marinas shall be sited to prevent restrictions in the use of commercial and recreational shellfish beds and comply with the WDOH "Environmental Health Guidelines for Marina Development and Operation."
I. 
Public access facilities are required in marinas subject to SJCC § 18.50.180.
J. 
Marinas shall be designed to minimize adverse effects on the scenic qualities of the shoreline.
K. 
Surface runoff from marina areas shall be controlled to prevent pollutants from entering water bodies.
L. 
Marinas are not allowed on Class I beaches or where their presence would interrupt driftways feeding Class I beaches.
M. 
Where fill is allowed, it shall be only used for the necessary water-dependent portions of the facility and be consistent with SJCC § 18.50.110. Fill is prohibited for the creation of parking lots and land for future development.
N. 
Parking lots associated with marinas shall comply with SJCC § 18.50.550.
O. 
Live aboard vessels are regulated by SJCC § 18.50.540(E).
P. 
Marina applicants that propose live aboard moorage must demonstrate that the location of the live aboard slips will result in no net loss of shoreline ecological functions.
Q. 
Regulations by Designation – Rural Residential and Rural Farm Forest. New marinas are prohibited. The expansion or alteration of a marina legally established prior to October 30, 2017, may be allowed subject to the regulations of this SMP.
(Ord. 1-2016 §§ 33, 39, 84(D), (G))
A. 
Ramps and marine railways shall be designed to not obstruct littoral drift.
B. 
Ramps may be allowed for residences where the upland slope within 25 feet of the OHWM does not exceed 25 percent and where cutting, grading, or filling exceeding 250 cubic yards or retaining walls and structural shoreline stabilization measures are not necessary.
C. 
Ramps, appurtenant buildings, and haul out facilities shall be designed in character and scale with the surrounding shoreline.
D. 
Ramps and marine railways are prohibited on Class I beaches, pocket beaches or where their presence would interrupt driftways from feeding Class I beaches.
E. 
Marine railways shall be located on unaltered grade where feasible. They shall not obstruct public access to and along the shoreline or across publicly owned tidelands. A boathouse is allowed at the landward end of a marine railway above the OHWM if it meets the required critical area buffers or setbacks.
(Ord. 1-2016 § 34; Ord. 11-2017 § 15)
A. 
Mooring buoys shall not interfere with navigation or access to the shoreline. They shall be visible in daylight 100 yards away.
B. 
Mooring buoys shall be placed as specified by state and federal agencies.
C. 
Unless there is no feasible alternative, mooring buoys shall be located to avoid eelgrass beds and other critical saltwater habitats.
D. 
Mooring buoys individually or cumulatively shall not:
1. 
Impede the ability of other landowners to access their private property;
2. 
Pose a hazard to or obstruct navigation or fishing;
3. 
Contribute to the degradation of water quality or habitat; or
4. 
Pose a threat to a commercial shellfish growing area classification or reduce the potential for an existing area to be upgraded to a new commercial shellfish growing area classification.
E. 
Residential mooring buoys shall not be used for live aboard vessels or commercial purposes.
F. 
Mooring buoys shall use neutral buoyancy rope, mid-line float, helical anchors, or other state-approved designs to minimize adverse effects on aquatic ecosystems and fish.
G. 
Mooring buoys shall be clearly marked and labeled with the owner's name and contact information and WDNR authorization number(s).
H. 
Unless otherwise permitted by WDNR, the capacity of each mooring buoy shall not exceed one boat and its shore access craft.
(Ord. 1-2016 § 35; Ord. 11-2017 § 16)
A. 
Private recreational floats shall be placed offshore no farther than 200 feet beyond extreme low tide or the line of navigability, whichever is closest to shore.
B. 
Private recreational floats shall not provide boat moorage.
C. 
Private recreational floats shall not exceed 150 square feet.
D. 
Private recreational floats shall be located at least 10 feet from side property lines, unless they are designated as joint use structures serving two or more adjoining shoreline properties.
E. 
Only one private recreational float may be approved per shoreline parcel.
(Ord. 1-2016 § 36)
A. 
The director may approve a design different than the one for a boating facility, dock, pier, float, or ramp that is being replaced without a shoreline variance if the following criteria are met:
1. 
Any adverse impacts on shoreline ecological functions are mitigated; and
2. 
The new structure does not exceed the thresholds for substantive change set forth in WAC 173-27-100.
B. 
Proposals involving the replacement, repair and expansion of boating facilities, private and joint use docks, piers, floats and ramps that exceed the thresholds for substantive change in WAC 173-27-100 will be reviewed and permitted as new structures. They must comply with the following criteria:
1. 
The enlargement is necessary due to safety concerns, inadequate depth of water, increased or changed use or demand;
2. 
Applicable design and mitigation standards; and
3. 
The proposal results in no net loss of shoreline ecological functions.
C. 
Replacement of more than 33 percent or 250 square feet of decking or the replacement of decking substructure requires installation of functional grating in the replaced section only.
D. 
The boating facility, docks, pier, float or ramp must have been usable at the site within the past 12 months prior to the time of application to be considered a replacement structure. Usable means no major deterioration or section loss in critical structural components is present.
(Ord. 1-2016 § 37)
A. 
For all new or expanded boating facilities, docks, piers, floats, and ramps, applicants must provide a demand analysis demonstrating the need for the proposal that addresses at least the following criteria:
1. 
The total amount of moorage proposed (except for ramps);
2. 
The total number of commercial moorage spaces within the service range of the proposed facility, including vacancies or waiting lists at facilities existing on the date of the application;
3. 
The expected service population and boat ownership characteristics of the population, if necessary for specific design elements related to facility length or necessary water depth;
4. 
Approved facilities, or pending applications, within the service range of the proposed facility;
5. 
Proposals for new boating facilities, docks, piers, floats, and ramps shall provide documentation demonstrating that expansion of facilities existing at the time of application is not feasible or would not be adequate to meet current demand; and
6. 
For new or expanded ramps:
a. 
Identification of the nearest public or commercial ramp existing at the time of application;
b. 
Demonstration that planned expansion of existing facilities will not meet current or future demand; and
c. 
Any other relevant factors related to the need for safe or efficient access to public waters if that information supports justification for specific design elements.
B. 
At the discretion of the director, the following documents for new or expanded boating facilities, docks, piers, floats and ramps may be requested:
1. 
A mitigation plan in accordance with SJCC § 18.50.140, § 18.50.150 and § 18.50.160 if the project will result in unavoidable adverse impacts to shoreline ecological functions or processes;
2. 
A biological assessment compliant with the ACOE and FEMA Region 10 floodplain habitat assessment and mitigation guidance, and the demand analysis prepared in accordance with subsection (A) of this section;
3. 
A slope bathymetry map;
4. 
An assessment of current water-dependent uses in the vicinity and documentation of potential impacts to those uses and mitigating measures;
5. 
An assessment of pedestrian shoreline access or the infeasibility of providing public access areas for public ramps;
6. 
Location of wetlands within 300 feet and FWHCAs within 200 feet of the project area; and
7. 
Field location of the OHWM.
(Ord. 1-2016 § 38; Ord. 11-2017 § 17)
A. 
Regulations.
1. 
Breakwaters, jetties and groins waterward of the OHWM are only allowed for water-dependent uses, public access, restoration, and shoreline stabilization.
2. 
Breakwaters shall conform to all design requirements established by the WDFW and the ACOE.
3. 
Breakwaters shall be designed and constructed to avoid adverse impacts on the circulation of water, the movement of sand, sediment and other ecological functions. The design shall minimize impediments to navigation. Visibility from the shoreline shall be minimized.
4. 
Public breakwaters shall permit pedestrian use of their surfaces where safe and feasible.
5. 
Breakwaters, jetties and groins require a conditional use permit except in conjunction with a project to restore ecological functions.
B. 
Regulations by Designation.
1. 
Conservancy. Floating breakwaters may be allowed in this designation if they can be made visually compatible with their surroundings. Rigid breakwaters may be allowed only as a shoreline conditional use. Jetties and groins are prohibited.
2. 
Natural. Breakwaters, jetties, and groins are prohibited in the natural designation.
3. 
Aquatic. Breakwaters are allowed in this designation subject to the regulations of the most restrictive abutting shoreline designation. Where the proposed breakwater site abuts more than one shoreline designation, the regulations of the most restrictive abutting designation govern.
4. 
Breakwaters, jetties and groins are prohibited in the Eastsound subarea.
5. 
Breakwaters, jetties and groins required in a shoreline restoration project may be allowed in all designations with a shoreline substantial development permit.
(Ord. 1-2016 § 40; Ord. 11-2017 § 18)
Hard and soft structural shoreline stabilization measures must meet the following requirements:
A. 
Hard and soft structural shoreline stabilization measures are only allowed to protect the following types of structures and infrastructure:
1. 
An existing primary structure;
2. 
An accessory dwelling unit;
3. 
Underground utilities and components of on-site sewage disposal systems and wells that cannot feasibly be relocated; and
4. 
A road or driveway that cannot be relocated and where there is no feasible alternative means of access.
B. 
New, replaced, or enlarged hard structural shoreline stabilization measures may be allowed when damage to structures and infrastructure defined in subsection (A) of this section is expected within three years.
C. 
New, replaced, or enlarged soft structural shoreline stabilization measures are not allowed unless there is conclusive evidence documented by a geotechnical analysis that the structure or infrastructure identified in subsection (A) of this section is in danger from shoreline erosion caused by tidal action, waves or currents.
1. 
Normal sloughing, erosion of steep bluffs, or shoreline erosion itself, without a scientific or geotechnical analysis, is not demonstration of need.
2. 
The geotechnical analysis should evaluate on-site drainage issues and address drainage problems away from the shoreline edge before considering structural shoreline stabilization.
D. 
A certificate of exemption is required prior to undertaking the repair of shoreline stabilization measures.
E. 
All structural shoreline stabilization measures must result in no net loss of ecological functions.
F. 
If it can be demonstrated that nonstructural measures such as planting vegetation or the installation of on-site drainage improvements are not feasible or sufficient to address erosion causes and impacts, new structural stabilization measures may be allowed to:
1. 
Restore shoreline ecological functions;
2. 
Remediate hazardous substances pursuant to Chapter 70.105D RCW; or
3. 
Protect sites with exposed and verified archaeological resources.
(Ord. 1-2016 § 41; Ord. 21-2018 § 4)
Applicants for new, enlarged, or replacement hard or soft structural shoreline stabilization measures shall employ the first feasible alternative in the shoreline stabilization order of preference provided below. Applicants shall document the infeasibility of using subsection (A) of this section in order to use subsection (B) of this section and so on. The order of preference is:
A. 
Leaving the shoreline undisturbed and allowing natural processes to occur. No structural stabilization measure is constructed. Nonstructural shoreline stabilization options shall be considered including installing drainage controls, planting native vegetation, increasing building setbacks, or relocating structures;
B. 
Using soft structural shoreline stabilization measures such as flexible defense works constructed of natural materials such as bioengineering alternatives (those incorporating trees, shrubs and other living components), beach nourishment, protective berms, and vegetative stabilization; and
C. 
Using hard structural shoreline stabilization measures that form rigid structures constructed of materials such as sandbags, wood retaining walls, rock or concrete.
(Ord. 1-2016 § 42)
A. 
Excavation and fill for new, enlarged or replacement hard and soft structural shoreline stabilization measures must be located landward of the OHWM to the maximum extent feasible.
B. 
Hard and soft shoreline stabilization measures must minimize adverse impacts to shoreline ecological functions resulting from short-term construction activities consistent with SJCC § 18.50.130, § 18.50.150 and § 18.50.160. Minimization techniques may include compliance with appropriate timing restrictions, use of best management practices to prevent water quality impacts related to land or in-water work, management of upland drainage, and stabilization of exposed soils following construction.
C. 
Hard and soft shoreline stabilization measures must be designed to not interfere with normal surface or subsurface drainage into the adjacent water body.
D. 
Hard and soft shoreline stabilization measures must be designed to not constitute a hazard to navigation.
E. 
Private pedestrian pathways, stairways and ramps, or other pedestrian access features may be incorporated into the structural shoreline stabilization measure (e.g., steps integrated into the bulkhead in a coved area with shallow entry, etc.), but they must not extend waterward of the face of the structural shoreline stabilization measure.
F. 
In accordance with SJCC § 18.50.180, publicly financed or subsidized shoreline stabilization measures must provide public access to the shoreline except where such access is infeasible due to the presence of incompatible uses, safety issues, security threats, or predictable harm to shoreline ecological functions. When a hard or soft structural shoreline stabilization measure is required at a public access site, provisions for safe access to the water and long-term multiple uses must be incorporated into the design (e.g., steps integrated into the bulkhead, creation of a coved area with shallow entry, etc.).
G. 
Shoreline stabilization measures must not extend waterward more than the minimum amount necessary to achieve effective stabilization, except for those elements that enhance shoreline ecological functions and minimize impacts.
(Ord. 1-2016 § 43)
In addition to the general design requirements in SJCC § 18.50.370, the following design standards must be incorporated into the design of hard structural stabilization measures:
A. 
All new, enlarged, or replacement hard structural shoreline stabilization measures must avoid and minimize long-term adverse impacts to shoreline ecological functions by incorporating the following measures into the design:
1. 
Limiting the size of hard structural shoreline stabilization measures to the minimum necessary, including length, height, depth, and mass;
2. 
Shifting the hard structural shoreline stabilization measure landward or sloping the hard structural shoreline stabilization measure landward to provide some dissipation of wave energy and increase the quality or quantity of nearshore shallow water habitat; and
B. 
Avoiding impacts to critical area functions and values where feasible, including significant areas of natural erosion and accretion.
C. 
All applications for new and enlarged (see SJCC § 18.50.410 and § 18.50.420) shoreline stabilization measures must include plans to minimize adverse impacts to shoreline ecological functions by incorporating the following measures into the project as appropriate:
1. 
Mitigation of substrate conditions including the substrate and gradient waterward of the OHWM. Near drainage or stream outlets, the material should be sized and placed to remain stable during a two-year flood event, under typical currents, boat wakes, and wind-driven waves including those occurring during storm events; and
2. 
Planting native, nontoxic, riparian vegetation along at least 75 percent of the shoreline linear frontage affected by the new or enlarged structural stabilization measure. The vegetated portion of the shoreline must average 10 feet in depth landward from the OHWM. It may be a minimum of five feet wide to allow for variation in landscape bed shape and plant placement. Mitigation of native vegetation must consist of a mixture of trees, shrubs, and vegetation and be designed to improve habitat functions. Where appropriate, at least three trees, three feet or taller, per 100 linear feet of proposed development must be included in the planting. Plant materials must be native to the ecosystem of the project area.
D. 
In lieu of meeting the requirements in subsection (C) of this section, alternative measures that are demonstrated to be functionally equivalent may be allowed.
E. 
When a hard structural shoreline stabilization measure is proposed on a site where legally established hard structural shoreline measures do not exist on adjacent properties, the proposed stabilization measure must tie in flush with the contours of the adjoining properties, as feasible, so that the proposed stabilization measure will not cause erosion of the adjoining properties.
F. 
When a hard structural shoreline stabilization measure is proposed on a site where legally established hard structural shoreline stabilization measures exist on adjacent properties, the proposed stabilization must tie in flush with those stabilization measures. The new stabilization measure shall not extend waterward of the OHWM, except when necessary to connect to the adjoining stabilization measure. The length of the hard structural shoreline stabilization transition area to adjacent properties shall be the shortest distance possible and shall not extend onto adjacent property.
G. 
Any fill in excess of one cubic yard per linear foot of stabilization structure is subject to SJCC § 18.50.110 and requires a shoreline substantial development permit or shoreline conditional use permit.
H. 
New hard structural shoreline stabilization measures are prohibited adjacent to documented forage fish spawning areas except replacements as defined in SJCC § 18.50.410(A).
I. 
The sizing and placement of all hard structural shoreline stabilization materials must be selected to:
1. 
Protect upland structures from erosion over the long term;
2. 
Provide stability during a two-year flood event under typical currents, boat wakes and wind-driven waves including those occurring during storm events if the proposal is near a stream or drainage outlet;
3. 
Allow safe passage and migration of fish and wildlife;
4. 
Minimize the creation of juvenile salmon predator habitat; and
5. 
Use gravel suitable as forage fish spawning substrate if a project is proposed on a shoreline reach with documented spawning habitat for forage fish and sand lance.
(Ord. 1-2016 § 44)
In addition to the general design requirements of SJCC § 18.50.370, the following design standards must be incorporated into the design of soft structural shoreline stabilization measures:
A. 
The project must be designed to prevent increased erosion of adjacent properties. Soft shoreline stabilization projects may not include hard structural shoreline stabilization elements.
B. 
The soft shoreline stabilization design must provide stability and dissipate wave and current energy without presenting extended linear faces to oncoming waves or currents.
C. 
The sizing and placement of all materials must be selected to:
1. 
Protect upland structures from erosion over the long term;
2. 
Ensure they will remain stable during a two-year flood event and under typical currents, boat wakes and wind-driven waves including those occurring during storm events if the proposal is near a stream or drainage outlet;
3. 
Allow safe passage and migration of fish and wildlife;
4. 
Minimize the creation of juvenile salmon predator habitat; and
5. 
Use sand and gravel that are suitable as spawning substrate when a proposal is on a shoreline reach with forage fish spawning habitat.
D. 
Soft shoreline stabilization measures may include fill placed waterward of the OHWM to provide enhancement of shoreline ecological functions to improve the substrate condition or gradient. Fill in flood hazard areas identified on the FIRMs is not allowed unless the director finds that there is no feasible alternative.
E. 
Applicants are encouraged to use the Washington Department of Ecology's March 2014 Shoreline Master Program Planning and Implementation Guidance: Soft Shoreline Stabilization as well as the Washington State Department of Fish and Wildlife's March 2014 Marine Shoreline Design Guidelines and any revisions thereto to plan and design soft shoreline stabilization measures.
(Ord. 1-2016 § 45; Ord. 11-2017 § 19; Ord. 21-2018 § 5)
Enlargement of a hard or soft structural shoreline stabilization measure includes additions or increases in size to existing shoreline stabilization measures. Enlarging structural shoreline stabilization measures is allowed only if it will result in no net loss of shoreline ecological functions. Proposals to enlarge a soft or hard structural shoreline stabilization measure are regulated the same as entirely new structures and are subject to all shoreline permit requirements.
(Ord. 1-2016 § 46)
A. 
For purposes of this section, "replacement" means the construction of a new hard or soft shoreline stabilization measure that will perform the function of one that no longer adequately serves its purpose. The terms "maintenance" and "repair" include modifications or improvements designed to ensure the continued function of a stabilization structure.
B. 
The reconstruction, renovation or repair of up to 99.99 percent of the volume (length, depth and height) of an existing, permitted structural shoreline stabilization measure is considered repair and maintenance of the stabilization measure and requires a certificate of exemption.
C. 
When the reconstruction or renovation of an existing hard or soft structural stabilization measure is 100 percent of its currently permitted volume (length, depth, height), it is considered a replacement structure and is subject to the requirements for a new hard or soft structural stabilization measure.
D. 
Nonfunctioning structures shall be removed where they have adverse impacts on shoreline ecological functions associated with critical saltwater habitats.
E. 
A geotechnical analysis is not required for the replacement of soft structural shoreline stabilization measures with other soft measures.
(Ord. 1-2016 § 47)
A. 
Except as provided in SJCC § 18.50.410(E), a geotechnical report prepared by a qualified professional must be submitted with applications to construct new, enlarged and replacement structural shoreline stabilization measures. The report must demonstrate the need for the proposed hard or soft stabilization measure and must include:
1. 
A determination that shoreline erosion is being caused by waves and currents and not upland drainage issues. Normal sloughing, erosion of steep bluffs, or shoreline erosion itself, without a scientific or geotechnical analysis, is not demonstration of need. The geotechnical analysis should evaluate on-site drainage issues. If erosion is being caused by drainage from upland areas, the report should present options for controlling the erosion;
2. 
An assessment of the erosion rate and site specific conditions contributing to the erosion such as water depth, orientation of the shoreline, and wave fetch and flow velocities;
3. 
A geotechnical analysis for hard structural shoreline stabilization measures documenting that without the proposal there is conclusive evidence that development will be damaged within three years as a result of erosion caused by waves and currents, or that postponing the work until the need is imminent (within three years) will result in the loss of opportunities to avoid greater impacts on shoreline ecological functions. New and enlarged hard structural shoreline stabilization measures are allowed only when needed to protect the types of upland structures and infrastructure identified in SJCC § 18.50.350(A);
4. 
A geotechnical analysis for soft structural shoreline stabilization measures documenting that without the proposal there is conclusive evidence that development will be damaged as a result of erosion caused by waves and currents. New and enlarged soft structural shoreline stabilization measures are allowed only when needed to protect the types of upland structures and infrastructure identified in SJCC § 18.50.350(A);
5. 
An assessment of alternatives to hard or soft structural shoreline stabilization measures, such as:
a. 
Relocation of the structural measure farther inland. If the structural measure does not meet current buffer or setback standards, the new location is not required to meet these standards provided the magnitude of the nonconformity is not increased, new nonconformities are not created, and there is no net loss of shoreline ecological functions;
b. 
Correction of any groundwater or drainage issues that may be causing shoreline erosion;
c. 
An assessment of the feasibility of using soft structural shoreline stabilization measures in lieu of hard structural shoreline stabilization measures;
d. 
An assessment of the anticipated effects of the proposed stabilization measure on ecosystem processes and functions such as effects on feeder bluffs, drift cells and areas adjacent to and down drift of the site;
e. 
Design recommendations for minimizing adverse impacts of the soft or hard structural shoreline stabilization measure; and
f. 
Design recommendations for minimizing the size, bulk or volume of structural shoreline stabilization materials, including gravel and cobble beach substrates necessary to dissipate wave energy, eliminate scour, and provide long-term shoreline stability.
B. 
Detailed construction plans shall be submitted for hard and soft structural shoreline stabilization measure proposals that demonstrate compliance with the standards. Plans shall include:
1. 
Existing and proposed cross section views showing topography and OHWM;
2. 
Construction sequence; and
3. 
Specifications for all materials, including gravels, cobbles, boulders, logs, and vegetation.
C. 
The director may waive a demonstration of need when a hard structural shoreline stabilization measure is proposed to be replaced with soft structural shoreline stabilization measures and the replacement would result in restoration of shoreline ecological functions or processes.
(Ord. 1-2016 § 48; Ord. 21-2018 § 6)
A. 
General Regulations.
1. 
Applications for commercial developments and uses shall include a detailed narrative explaining the nature and intensity of the water-dependency or orientation of the proposed activity, including at least the following information:
a. 
The nature of the commercial development or use;
b. 
The need for shoreline frontage;
c. 
Proposed measures to mitigate adverse impacts to shoreline ecological functions; and
d. 
Proposed provisions to provide the public with visual or physical access to the shoreline.
2. 
Commercial resorts and campgrounds shall provide access to water areas for their patrons and on-site recreation facilities. Commercial resorts and campgrounds cannot be dependent on, or place undue burdens on, public recreational facilities.
3. 
Only water-dependent commercial development and uses such as boat fueling stations are allowed to be located over the water.
4. 
Commercial developments and uses, such as ports and marinas that have the potential to release toxic substances into the aquatic designation, shall be equipped with spill containment and cleanup kits.
5. 
Public access is required where a commercial development or use is proposed to be located on land in public ownership.
6. 
Commercial developments or uses that result in a net loss of shoreline ecological functions or adversely impact other shoreline uses, resources and activities such as navigation, recreation and public access must be mitigated in compliance with SJCC § 18.50.140, § 18.50.150 and § 18.50.160. Impacts to shoreline resources by commercial developments or uses must be mitigated by providing public access and ecological restoration unless such improvements are demonstrated to be infeasible or inappropriate.
7. 
Non-water-oriented commercial developments and uses are prohibited unless they meet the following criteria:
a. 
The use provides a public benefit on sites with severe navigability limitations and with respect to the objectives of the SMA such as providing public access and ecological restoration; or
b. 
It is part of a mixed use project with water-dependent uses that provides a significant public benefit and prevents significant adverse impacts to other shoreline uses, resources and the objectives of the SMA such as navigation, recreation and public access.
8. 
Structures used for the sale of aquacultural products are commercial development.
9. 
Accessory developments and uses such as warehousing, outdoor storage, waste storage and treatment, stormwater runoff control facilities, and utilities that do not require a shoreline location must be located landward of OHWM.
10. 
In areas designated for commercial developments and uses, non-water-oriented commercial developments and uses may be allowed if the site is physically separated from the shoreline by another property or public right-of-way.
11. 
All accessory parking and transportation facilities must comply with the provisions of SJCC § 18.50.550(B) and (C).
B. 
Regulations by Designation.
1. 
Urban.
a. 
Commercial developments and uses shall be set back at least 50 feet from the OHWM unless an alternate setback is approved in a variance.
b. 
Commercial developments and uses are allowed in the urban designation. Commercial structures, facilities and uses in Eastsound UGA shall adhere to the setbacks and building envelopes identified in the adopted Eastsound Waterfront Access Plan (Figure 130-6 of the Eastsound Subarea Plan).
2. 
Rural. Commercial developments and uses that will not significantly alter the character of the area may be allowed in the rural designation by conditional permit. In the absence of critical areas and their protective buffers all commercial structures, facilities and uses shall be set back at least 100 feet from the OHWM.
3. 
Rural Residential and Rural Farm Forest. Commercial developments and uses are prohibited in these designations, except for the alteration, modification, or expansion of small resorts, camps or commercial facilities associated with a lawfully existing commercial marina.
4. 
Conservancy.
a. 
Low intensity recreational commercial developments and uses that will not significantly alter the character of the area are allowed in the conservancy designation. Low intensity developments that will not significantly alter the character of the area such as birdwatching and hiking are those:
i. 
That do not require new services;
ii. 
That include minimal land disturbance;
iii. 
That provide sustained resource use; and
iv. 
That are located where shoreline conditions support the use.
Other low intensity commercial uses require conditional use permits.
b. 
With the exception of water-dependent structures, commercial structures and facilities shall be set back at least 100 feet from the OHWM.
5. 
Ports, Marinas and Marine Transportation. New commercial developments and uses must be water-dependent, water-related or water-enjoyment uses. Non-water-dependent commercial structures and uses shall be set back at least 50 feet from the OHWM unless an alternate setback is approved in a shoreline variance. Commercial developments and uses must provide public access to the shoreline in accordance with SJCC § 18.50.180.
6. 
Aquatic. Water-dependent commercial developments and uses are allowed in this designation subject to the regulations of the most restrictive abutting shoreline designation. Where a proposed commercial development site abuts more than one shoreline designation the regulations of the most restrictive abutting designation govern.
(Ord. 1-2016 § 49)
A. 
Regulations.
1. 
Dredging and dredge material disposal must be done in a manner that avoids or minimizes adverse ecological impacts. Unavoidable impacts must be mitigated in conformance with SJCC § 18.50.140, § 18.50.150 and § 18.50.160.
2. 
New development must be sited and designed to avoid or to minimize the need for new and maintenance dredging.
3. 
Dredging is allowed for the following purposes and where other alternatives are not feasible:
a. 
To improve water quality or aquatic habitat;
b. 
To establish, expand, relocate, reconfigure or maintain navigation channels to assure safe and efficient accommodation of lawfully existing navigational uses. Maintenance dredging of established navigation channels and basins is restricted to maintaining previously dredged or existing locations and shall not exceed previously authorized depths and widths;
c. 
To mitigate conditions that could endanger public safety; or
d. 
To create or improve public recreational opportunities.
4. 
Dredging for the primary purpose of obtaining fill material is prohibited, except when the material is necessary for the restoration of ecological functions. Placement of fill shall be waterward of the OHWM. The project must be either associated with a Model Toxics Control Act or Comprehensive Environmental Response, Compensation and Liability Act habitat restoration project, or any other significant habitat project that is approved through a shoreline conditional use permit.
5. 
All dredge spoils shall be deposited at spoils deposit sites.
6. 
In addition to any other required application materials, applications for a shoreline substantial development permit or exemption for dredging shall include at least the following information:
a. 
A site plan outlining the perimeter of the area proposed to be dredged, the spoil disposal site, and the bathymetry existing on the date of application with data points at a minimum of two-foot depth increments;
b. 
The purpose of the proposed dredging and an analysis of compliance with the SMP regulations;
c. 
The physical characteristics, shoreline geomorphology, and biological resources in the area proposed to be dredged, including:
i. 
Location and size of the proposed dredging site;
ii. 
A habitat survey conducted according to the most recent WDFW eelgrass/macroalgae survey guidelines, if applicable;
iii. 
Analysis of the stability of bedlands adjacent to the proposed dredging site; and
iv. 
Tidal fluctuation, current speed and direction;
d. 
A detailed description of the physical, chemical and biological characteristics of the dredge materials to be removed, including:
i. 
Physical analysis of material to be dredged (material composition and amount, grain size, organic materials present, source of material, etc.);
ii. 
Chemical analysis of material to be dredged (volatile solids, chemical oxygen demand, grease and oil content, mercury, lead and zinc content, etc.); and
iii. 
Biological analysis of material to be dredged;
e. 
A description of the anticipated dredging operations including the:
i. 
Total spoils volume;
ii. 
Location, size, capacity and physical characteristics of the proposed spoils disposal area;
iii. 
Frequency and volume of anticipated maintenance dredging;
iv. 
Method of dredging, including facilities for settlement and movement of materials;
v. 
Project timeline; and
vi. 
A plan for disposal of maintenance spoils for the life of the project or a period of 25 years, whichever is shorter.
B. 
Regulations by Designation.
1. 
Rural, Rural Residential, and Rural Farm Forest. Dredging is allowed in these designations. Spoil disposal sites are allowed only if it can be shown that the disposal site will ultimately be used for an activity allowed in the affected designation.
2. 
Conservancy. Dredging in this designation is limited to maintenance of existing navigation channels and facilities. Spoil disposal sites are limited to existing sites designated by the WDNR.
3. 
Aquatic. Dredging is allowed in this designation subject to the regulations of the most restrictive abutting shoreline designation. Where the proposed site abuts more than one shoreline designation, the policies and regulations of the most restrictive abutting designation govern. Spoil disposal sites are prohibited in the aquatic designation.
(Ord. 1-2016 § 50)
A. 
General Regulations.
1. 
In any 10-year period, no more than 30 percent of marketable trees may be harvested on a parcel located within the shoreline jurisdiction in accordance with WAC 222-30-110. Other timber harvesting may be allowed in limited instances where the topography, soil conditions or silviculture practices necessary for regeneration render selective logging ecologically detrimental.
2. 
This section does not apply to the cutting of timber solely incidental to the preparation of land for other uses authorized by a shoreline permit or shoreline certificate of exemption if the activity is not covered under the Washington State Forest Practices Act, Chapter 76.09 RCW.
3. 
If there is a likelihood of conversion to nonforest uses, forest practice conversions and other Class IV general forest practices shall:
a. 
Result in no net loss of shoreline ecological functions;
b. 
Maintain the ecological quality of the watershed's hydrologic system;
c. 
Prevent significant adverse impacts to other shoreline uses, resources, and values; and
d. 
Provide a benefit with respect to the objectives of the SMA such as navigation, recreation and public access.
B. 
Activities covered under the Washington State Forest Practices Act, Chapter 76.09 RCW, except for conversion to other uses, are exempt from the vegetation management standards in this section.
C. 
Regulations by Designation.
1. 
Natural. Forest management practices are allowed in this designation only if no other means of control will work to control a fire, halt the spread of disease or damaging insects, or to clean up and restore an area devastated by a natural disaster such as fire, storm, disease, or insect attack. No roads may be constructed except those necessary to cope with the emergency situation.
(Ord. 1-2016 § 51; Ord. 11-2017 § 20; Ord. 8-2020 § 9)
A. 
General Regulations.
1. 
Only water-dependent and water-related industrial developments and uses are allowed. They must be consistent with or compatible with existing uses on adjacent shoreline parcels.
2. 
Accessory developments and uses such as warehousing, outdoor storage, waste storage and treatment, stormwater runoff control facilities, and utilities that do not require a shoreline location must be located landward of the OHWM.
3. 
Existing industrial development and uses on shorelines that are neither water-dependent nor water-related may be allowed to expand inland from existing structures, subject to a shoreline conditional use permit. Waterward or lateral expansion of non-water-oriented industrial development is prohibited.
4. 
Water-dependent industrial development and uses must be located and designed, where feasible, to eliminate the need for initial or continual dredging, filling, dredge material disposal, and other harbor and channel maintenance activities.
5. 
Storage or disposal of industrial waste is prohibited.
6. 
At new or expanded industrial developments and uses, source control and treatment standards and best management practices required by SJCC § 18.60.070 must be employed for the safe handling of fuels and toxic or hazardous materials to prevent them from entering the water.
7. 
The processing of oil and natural gas and their products is prohibited. The installation of underwater oil and natural gas pipelines is prohibited.
8. 
The installation of over-water facilities for the refining of oil and natural gas is prohibited.
9. 
Industrial developments and uses in shoreline jurisdictions must be located, designed, constructed, and managed in a manner that will result in no net loss of shoreline ecological functions.
10. 
Any industrial development and use having the potential for the release of toxic substances into marine waters must have adequate response equipment on site.
11. 
Public access to the waterfront must be provided where an industrial development or use is proposed on public lands.
12. 
Solid waste disposal and liquid waste treatment facilities are prohibited unless there is no feasible alternative.
13. 
Discharge of solid and liquid wastes, biosolids and untreated effluent is prohibited.
14. 
All accessory parking and transportation facilities must comply with the provisions of SJCC § 18.50.550(B) and (C).
B. 
Regulations by Designation.
1. 
Rural Farm Forest. Industrial developments and uses that are non-water-oriented uses directly related to the commercial fishing industry are prohibited in this designation.
2. 
Aquatic. Industrial developments and uses are prohibited in this designation except for water-dependent uses subject to the regulations of the most restrictive abutting shoreline designation. Where the proposed development would abut more than one shoreline designation, the regulations of the most restrictive abutting designation govern.
3. 
Ports, Marinas and Marine Transportation Designation. Marine service, repair, fueling and sewage pump out facilities are allowed in this designation. All other industrial developments and uses are prohibited.
(Ord. 1-2016 § 52; Ord. 11-2017 § 21)
A. 
General Regulations.
1. 
Only water-dependent and water-related institutional developments and uses are allowed within shoreline jurisdiction.
2. 
Accessory developments and uses such as storage, waste storage and treatment, stormwater runoff control facilities and utilities that do not require a shoreline location must be located landward of the water-dependent and water-related development.
3. 
Institutional developments and uses on shorelines that are neither water-dependent nor water-related may be allowed as a shoreline conditional use to expand inland from structures existing at the time of application. Waterward or lateral expansion of existing non-water-dependent institutions is prohibited.
4. 
Applications for institutional developments and uses must include a detailed narrative explaining the nature and intensity of the water dependency or orientation of the proposed activity. The narrative shall include at least the following information:
a. 
The nature of the institutional activity;
b. 
The need for shoreline frontage;
c. 
Proposed measures to mitigate potential adverse impacts in a manner that will result in no net loss of shoreline ecological functions; and
d. 
Proposed provisions for public visual or physical access to the shoreline.
5. 
All accessory parking and transportation facilities must comply with the provisions of SJCC § 18.50.550(B) and (C).
B. 
Regulations by Designation.
1. 
Aquatic. Institutional developments and uses are prohibited in this designation unless the use is water-dependent.
(Ord. 1-2016 § 53)
A. 
Regulations.
1. 
Land log storage is preferred over water log storage unless the applicant demonstrates that water log storage will be less detrimental to the shoreline ecological functions or the public interest.
2. 
Unpaved areas that have seasonal high water tables (less than three feet below ground surface) or poor surface drainage shall not be used for log storage during the wet season unless specifically authorized by the director.
3. 
Log storage is prohibited in public waters where such storage would constitute a significant hindrance to other water uses such as small craft navigation.
4. 
Easy-let-down devices are preferred over the free-fall dumping of logs into the water in conformance with WDNR established policy ("12.1 Log Booming and Log Storage" 9/1994 or as updated). The free-fall dumping of logs in a manner that would do avoidable damage to the shoreline ecological functions is prohibited.
5. 
Bark and wood debris controls, collection and disposal methods must be employed at log storage and raft construction areas for both floating and sinking particles.
6. 
Drainage and surface runoff from log storage areas shall be controlled so that pollutants such as bark and other wood debris are not carried into water bodies.
7. 
Logs must be secured in bundles before being placed in the water where water depths permit the floating of bundled logs. Bundles shall not be broken again except on land or at mill sites.
8. 
Log transfer facilities will not be approved until the applicant demonstrates:
a. 
There is no feasible alternative; and
b. 
There is a demand for a multiple-user facility.
9. 
The development of a log transfer facility, or the use of an unimproved shoreline area for a log transfer site, may be allowed as a shoreline conditional use permit.
10. 
On non-ferry-served islands, proposals for timber harvest must identify all sites on that island that are proposed for the transfer of logs. A shoreline conditional use permit is required for each log transfer site.
B. 
Regulations by Designation.
1. 
Rural and Rural Residential. Log transfer sites, facilities and storage are allowed if the site will serve multiple users.
2. 
Conservancy. Log transfer sites, facilities and storage may be allowed in this designation with a conditional use permit on non-ferry-served islands if the site will serve multiple users. The applicant must demonstrate that these activities will result in no net loss of shoreline ecological functions.
3. 
Aquatic. Wet storage and log transfer sites and facilities are allowed in this designation subject to the regulations of the most restrictive abutting shoreline designation.
(Ord. 1-2016 § 54; Ord. 11-2017 § 22)
A. 
General Regulations.
1. 
Mineral extraction projects are subject to the provisions in SJCC § 18.50.110, § 18.50.120, and § 18.50.130. If a project cannot meet the critical area regulations, the applicant must complete the mitigation sequencing analysis established in SJCC § 18.50.140, § 18.50.150 and § 18.50.160.
2. 
Applications for substantial development permits for mineral extraction must be accompanied by a report prepared by a qualified professional and must include at least the following information:
a. 
Types of materials present on the site;
b. 
Quantity and quality of each material;
c. 
Lateral extent of mineral deposit(s);
d. 
Depth of mineral deposit(s); and
e. 
Depth of overburden.
3. 
All mineral extraction and reclamation must be performed in full compliance with the Washington State Surface Mining Act (Chapter 78.44 RCW).
4. 
The extraction of minerals from any marine beach or feeder bluff or any lake beach for any commercial or industrial purpose is prohibited.
5. 
The extraction of minerals from any marine or lake beach for noncommercial, nonindustrial purposes is prohibited to protect natural shoreline ecological functions, resources or systems.
6. 
Topsoil or other overburden having value for agriculture or other beneficial uses must not be removed or disposed of in a manner that will reduce its value or prevent its future use.
7. 
All mineral extraction operations must employ buffer zones, erosion and sedimentation control measures, and other suitable precautionary measures to protect the shoreline from adverse impacts resulting from the operations.
8. 
Each application for a substantial development permit for mineral extraction must be accompanied by a detailed reclamation plan. The plan must indicate the approximate dates that the reclamation effort is to be initiated and completed. It must identify the allowed use that will be established after reclamation. The plan must indicate the mitigation efforts to be undertaken so that the project results in no net loss of shoreline ecological functions. The reclamation program must be initiated within 60 days following the completion of the extraction operations.
9. 
The extraction of minerals in or under County waters shall be undertaken only where there will be no adverse impact on sediment transport and only with the approval of the appropriate state and federal regulatory agencies and, where applicable, only in compliance with this SMP.
B. 
Regulations by Designation.
1. 
Rural. Mineral extraction is allowed in this designation. A 110-foot buffer of undisturbed soil and vegetation must be maintained between the extraction site (including all accessory developments) and adjacent properties, water bodies, and wetlands.
(Ord. 1-2016 § 55)
A. 
Private pedestrian pathways, stairways and ramps used to provide pedestrian access to the OHWM from a single-family residence are normal residential appurtenances.
B. 
Private pedestrian pathways, stairways and ramps must not include roofs or roof covering materials such as awnings. They are exempt under SJCC § 18.50.050 if the following standards are met:
1. 
All materials must be finished in subdued natural earth colors;
2. 
No construction or placement seaward or below the OHWM is allowed unless the private pedestrian pathway, stairway or ramp is physically connected to an exempt or permitted dock;
3. 
The maximum vertical height of the structure is 15 feet and the maximum width of the structure is five feet. One intermediate landing or platform with a maximum size of five feet by five feet is allowed. Stairways may not be located on rock faces or bluffs that exceed a 60-degree angle; and
4. 
The project complies with bank stability requirements of SJCC § 18.35.055 through § 18.35.070.
C. 
Every application, whether exempt or nonexempt, for private pedestrian pathways, stairways and ramps will be evaluated on the basis of:
1. 
Bank stability;
2. 
Bank geology;
3. 
Vegetation removal in Tree Protection Zone 1 and other requirements of SJCC § 18.50.130;
4. 
Potential for revegetation;
5. 
Structural stability;
6. 
Adverse impacts on shoreline ecological functions; and
7. 
Aesthetic impacts.
D. 
Private pedestrian pathways, stairways and ramps that are likely to interfere with the erosion-accretion process associated with feeder bluffs are prohibited.
E. 
Where adverse impacts to shoreline ecological functions are expected, private pedestrian pathways, stairways and ramps are subject to the mitigation provisions of SJCC § 18.50.140, § 18.50.150 and § 18.50.160.
F. 
Public pedestrian trails identified in County planning documents are allowed in the shoreline and are regulated by SJCC § 18.50.550.
(Ord. 1-2016 § 56; Ord. 11-2017 § 23)
A. 
General Regulations.
1. 
All proposed port development activities must take place within the jurisdiction of a port district and be consistent with an adopted comprehensive district improvement plan.
2. 
Industrial enterprises that are not water-dependent are not allowed to locate within any marine port area. Expansion of non-water-related industrial enterprises within marine port areas is prohibited.
3. 
Opportunities for public visual or physical access to port areas must be included as part of each development project to the maximum extent feasible unless it is shown to be incompatible due to reasons of safety, security, or impact to the shoreline ecological functions.
B. 
Regulations by Designation.
1. 
Rural. Ports and water-dependent or water-related port facilities directly related to the commercial fishing industry are allowed in this designation. Other water-dependent or water-related port facilities may be permitted as a conditional use.
2. 
Rural Farm Forest. Ports and water-dependent or water-related port facilities directly related to the commercial fishing industry are allowed in this designation. Other port uses are prohibited.
3. 
Aquatic. Ports and water-dependent or water-related port facilities are allowed in this designation subject to the regulations of the most restrictive abutting shoreline designation. Where the proposed port or water-dependent or water-related facility would abut more than one shoreline designation, the regulations of the most restrictive abutting designation govern.
(Ord. 1-2016 § 57)
A. 
General Regulations.
1. 
Recreational areas must be designed to take advantage of the natural character of the shoreline area.
2. 
Recreational uses and facilities must include features that relate to access, enjoyment and use of the water and shorelines of the state. Accessory uses, such as restrooms and commercial services, must be located according to the following preferences:
a. 
Outside of shoreline jurisdiction, where feasible; or
b. 
Landward of water-oriented uses unless it can be shown that such facilities are shoreline dependent.
3. 
Motorized vehicles are prohibited on beaches, dunes, or fragile shoreline areas except for necessary maintenance activities, public health or safety protection, or boat launching at allowed marine railways and boat launches.
4. 
Intensive recreational development such as overnight camping areas and recreational vehicle or trailer parks is allowed only where water supply, sewage, and solid waste disposal can be provided consistent with public health regulations without adversely affecting the natural resources and features of the area.
5. 
Recreational facilities that require the use of large quantities of chemical fertilizers and herbicides such as golf courses and playing fields shall not be located on shoreline areas unless adequate provisions can be made for the protection of water areas from drainage and surface runoff consistent with SJCC § 18.60.070.
6. 
Recreational structures shall be set back behind the tops of feeder bluffs to avoid the need for future stabilization for the life of the structure (75 years) as determined by a qualified professional.
7. 
All recreational development in shoreline jurisdiction must be located, designed, constructed, and managed in a manner that will result in no net loss of shoreline ecological functions.
8. 
All accessory parking and transportation facilities must comply with the provisions of SJCC § 18.50.550(B) and (C).
B. 
Regulations by Designation.
1. 
Rural Residential and Rural Farm Forest. Recreational uses are allowed in these designations if the use is designed to serve a residential land division or multifamily development.
2. 
Natural. Noncommercial recreational uses of a nature and intensity consistent with the objectives of the natural designation are allowed. Such uses might include viewpoints and public pedestrian trails. New roads, camping areas, parking lots, restrooms, and similar facilities may be located within the SMP jurisdiction only when all other locations are not feasible. Golf courses, playing fields, and similar high intensity uses are prohibited. The use of chemical fertilizers, pesticides, and herbicides is prohibited. Landscaping shall consist of native vegetation.
3. 
Aquatic. Recreational uses are allowed in this designation subject to the regulations of the most restrictive abutting shoreline designation. Where the proposed recreational use would abut more than one shoreline designation, the regulations of the most restrictive abutting designation govern.
(Ord. 1-2016 § 58)
In addition to the requirements of Chapter 18.70 SJCC all land divisions in the shoreline shall be consistent with the following requirements:
A. 
All applications shall include a site plan demonstrating that new lots are developable (with the exception of common areas). The site plan will not be binding on future development.
B. 
The site plan shall show the following, where applicable:
1. 
Lot boundaries;
2. 
Topography;
3. 
Existing land cover;
4. 
Existing trees;
5. 
Trees proposed to be removed as part of the development;
6. 
At least one potential location for primary and appurtenant structures;
7. 
Potential location of parking and other impervious areas;
8. 
Potential graded areas;
9. 
Potential lawns, gardens, etc.;
10. 
Potential location of joint use dock;
11. 
Critical areas;
12. 
Setbacks;
13. 
Tree protection zones;
14. 
Habitat buffers;
15. 
Water quality buffers;
16. 
Easements or common areas;
17. 
Potential on-site sewage systems and their buffers;
18. 
Potential stormwater treatment and infiltration areas;
19. 
Potential well sites and their buffers;
20. 
Potential location of utility lines including water, sewer, power and phone;
21. 
All streams, ditches, drainage ways, seeps, ponds, and wetlands;
22. 
Areas with slumps, landslides or ongoing soil erosion;
23. 
Areas of unfractured bedrock; and
24. 
Rocky balds, meadows, fields with wildflowers, native grasses or Garry oaks.
C. 
In all new land divisions creating five or more lots, one of the following public and community access standards shall be met:
1. 
An easement shall be established to provide all lots usable physical access to the OHWM; or
2. 
A common area of 75 feet deep measured landward from the OHWM shall be established along the entire waterfront of the property that is being divided. A minimum of one and one-quarter acres within shoreline jurisdiction shall be provided for each residential unit proposed to be located within the shoreline jurisdiction. This is not a minimum lot size and does not preclude the clustering of units within the shoreline jurisdiction; or
3. 
A common area of at least 20 percent of the area of the property being divided that is within the shoreline jurisdiction shall be established. A minimum of two acres within the shoreline jurisdiction shall be provided for each residential unit to be located within the shoreline jurisdiction. This is not a minimum lot size and does not preclude the clustering of units within the shoreline jurisdiction.
D. 
Land division applications including nonbedrock lots must include a geotechnical evaluation, prepared by a qualified professional, identifying setbacks or other conditions needed to allow for natural erosive processes to occur over the life of the proposed development (minimum 75 years) without requiring structural shoreline stabilization measures.
E. 
Land divisions creating four or fewer lots are not required to provide public access to the shoreline.
F. 
In land divisions creating five or more lots, community or public access easements or common areas consistent with SJCC § 18.50.180 are required. These and other plat conditions must be noted on the deed or on the face of the plat.
G. 
If docks are proposed, shoreline land divisions are required to provide community docks rather than individual private docks.
H. 
Common area tracts do not contribute to density calculations.
I. 
Division of parcels in the natural designation is prohibited.
J. 
Land division that would exceed maximum density established on the Comprehensive Plan Map may be allowed by a shoreline conditional use permit if the following circumstances are demonstrated by the owners:
1. 
The property is not located within the natural designation;
2. 
The property is occupied by individually owned single-family dwelling units that exceed the currently allowable maximum residential density standards and all units are documented to have existed on the property before May 28, 1976;
3. 
All dwelling units have been maintained on the site consistent with the nonconforming use standards in SJCC § 18.50.090 and have not been abandoned since May 28, 1976; and
4. 
There is a potable water source and sewage disposal method for each unit approved in writing by the County department of health and community services.
K. 
A shoreline conditional use permit granted under the provisions in subsection (J) of this section will include the following conditions:
1. 
Conditional use permit approval does not constitute a legal division of the land. The property owners must legally divide the entire property simultaneously. Such division must be initiated with the submittal to the department of a complete land division application within two years of the effective date of the conditional use permit;
2. 
Residential density on the property may not be increased; and
3. 
Residential use and development are restricted to single-family dwelling units and normal residential appurtenances. Accessory dwelling units are prohibited.
(Ord. 1-2016 § 59)
A. 
Regulations – Location and Design.
1. 
Residential development is only allowed landward of the OHWM, except as specifically allowed for live aboard vessels in subsection (E) of this section.
2. 
Developments on waterfront lots may not cover more than 50 percent of the width of the lot as measured by the shortest straight line distance from lot line to lot line through the most seaward point of the primary residential structure. Developments with multiple structures shall ensure that the combined width of all the structures does not exceed 50 percent of the width of the single lot. However, on lots less than 80 feet wide at the most seaward point of the proposed residential structure, the structure may cover an area up to 40 feet wide as long as a minimum setback of 10 feet from side property boundaries is maintained. With the exception of patios, pedestrian pathways, stairways and ramps, all appurtenant structures must be placed landward of the primary residential structure. See Figure 18.50.540 below. The lot width requirement does not apply to normal residential appurtenances and accessory structures 30 inches or less in height.
Figure 18.50.540
3. 
The maximum allowed height for residential structures is 35 feet above average grade level. An exception to allow residential structures to exceed the 35-foot height limitation may be allowed with a shoreline conditional use permit. In order for the height exception to be approved, the applicant must demonstrate that:
a. 
The structure will not result in significant adverse visual impacts;
b. 
The structure will not interfere with normal public and visual access to the water; and
c. 
There are compensating factors that make a taller structure desirable from the standpoint of the public interest.
4. 
Developments on circular lots in the Decatur Northwest subdivision must comply with the setback and development standards approved in that land division and are not required to meet the shoreline setbacks.
B. 
Prohibited Uses and Activities. Except as provided in the live aboard provisions in subsection (E) of this section, new residential structures and their normal residential appurtenant structures are prohibited over-water or floating on the water.
C. 
Regulations – Buffers and Setback Standards.
1. 
On all nonbedrock shorelines, coastal geologic buffers consistent with SJCC § 18.35.130 are required. The required geotechnical report must demonstrate that the proposed buffer will be sufficient to avoid the need for new protective structural shoreline stabilization measures for the life of the structure (75 years).
2. 
Development may also be subject to critical buffers and restrictions in SJCC § 18.50.130.
3. 
If a lot has screening vegetation within 50 feet of the OHWM the aesthetic setback is 50 feet from the top of the bank. In all other cases, the aesthetic setback is 100 feet from the top of the bank.
4. 
Where there is no clear top of the bank, structures shall be set back from the OHWM.
5. 
Trees stocking levels must be maintained consistent with SJCC § 18.35.130(B).
6. 
If existing houses on waterfront lots adjoining the project site are closer to the top of bank or OHWM than any specified minimum setback or buffer and may potentially block the view of the proposed residential structure, a lesser setback or buffer of not less than 35 feet may be authorized for a residential structure by the director if:
a. 
Adverse impacts to shoreline critical areas are identified by a qualified professional;
b. 
Adverse impacts are mitigated in conformance with SJCC § 18.50.140, § 18.50.150 and § 18.50.160; and
c. 
The proposed setback or buffer is the greater of:
i. 
The waterward side of a line between the most waterward points of the houses on the adjoining lots, and
ii. 
The average of the distances from the OHWM to the most waterward points of the houses on adjoining lots.
D. 
Regulations – Normal Residential Appurtenances and Accessory Structures.
1. 
Normal residential appurtenant and accessory structures are not allowed in critical area buffers required by SJCC § 18.50.120 except for:
a. 
Private pedestrian pathways, stairways, ramps, and boathouses served by marine railways; and
b. 
Temporary fencing for shoreline habitat and natural systems enhancement projects approved pursuant to SJCC § 18.50.590.
2. 
Normal residential appurtenant and accessory structures are not allowed in the shoreline aesthetic buffer except for:
a. 
Private pedestrian pathways, stairways, ramps, and boathouses served by marine railways; and
b. 
Normal residential appurtenant structures and accessory structures less than 30 inches in height; and
c. 
Temporary fencing for shoreline habitat and natural systems enhancement projects approved pursuant to SJCC § 18.50.590.
3. 
Accessory dwelling units must comply with SJCC § 18.40.240.
E. 
Live Aboard Vessels.
1. 
Live aboard vessels are only allowed within marinas.
2. 
Marinas located on state tidelands must provide facilities in the upland for disposal of sewage, oil, grey water, and solid waste consistent with federal, state and local laws and follow best management practices. Twenty-five percent of the total number of slips may be used for live aboard vessels.
3. 
Marinas located outside of state owned tidelands that do not provide facilities for the upland disposal of sewage, oil, grey water, and solid wastes consistent with local, state and federal laws but follow best management practices are allowed to use 10 percent of the total number of slips for live aboard vessels.
4. 
All applicants proposing live aboard vessel moorage must demonstrate:
a. 
The specific locations of the live aboard vessel slips will not result in a net loss of shoreline ecological functions; and
b. 
Residents will have access to an on-site potable water system and either a restroom or an on-site pump-out facility.
F. 
Regulations by Designation.
1. 
Natural. Residential development is prohibited in this designation, except that the owner of an existing parcel of record may construct one single-family residence and appurtenant structures. Vacation rental of a single-family residence or accessory dwelling unit is prohibited. Alteration of natural topography and vegetation is restricted to the minimum square footage necessary for the construction of the structures and their access. Shoreline modification is prohibited.
(Ord. 1-2016 § 60; Ord. 11-2017 § 24; Ord. 8-2020 § 10)
A. 
Regulations – General.
1. 
Transportation facilities and parking must be planned, located, designed, constructed and managed to have the least possible impact on shoreline ecological functions and result in no net loss of shoreline ecological functions.
2. 
Transportation facility and parking applications must include documentation to demonstrate that the proposal will not adversely impact existing or planned water-dependent uses.
3. 
Provisions for pedestrian access to or along the water shall be included in the plans for all new public transportation facilities and parking.
4. 
Commercial watercraft and seaplane operations at public access points require a conditional use permit.
B. 
Regulations – Roads (Public and Private).
1. 
Construction of major collector roads is prohibited in shoreline areas where an alternative alignment landward of the shoreline jurisdiction is feasible.
2. 
Major collector roads that must be constructed through the shoreline jurisdiction shall follow the shortest, most direct route possible, consistent with protection of the shoreline ecological functions, and the shore process corridor and its operating systems.
3. 
Public road alignments shall be designed to fit the topography to minimize alterations to natural site conditions.
4. 
Access roads must be located according to the following preferences:
a. 
Outside of shoreline jurisdiction; or
b. 
Landward of water-oriented uses unless it can be shown that such facilities are shoreline dependent.
5. 
Roadside vegetation shall be controlled.
6. 
Roads shall not be constructed on or seaward of a beach berm.
7. 
Roads shall be set back behind the tops of feeder bluffs to avoid the need for shoreline stabilization for a minimum of 75 years. The setback shall be determined by a qualified professional.
C. 
Regulations – Parking.
1. 
A parking lot may be located within shoreline jurisdiction if the applicant can demonstrate that it:
a. 
Is an essential accessory to an allowed use;
b. 
Could not feasibly be located outside of the shoreline jurisdiction; and
c. 
Can be constructed, used and maintained in a manner that will result in no net loss of shoreline ecological functions.
2. 
Parking and holding lots serving ferry terminals, marinas, community docks, and port facilities may be allowed within the shoreline jurisdiction with a shoreline conditional use permit. Parking lots and their accessory use, such as restrooms, commercial services, and access roads, must be located according to the following preferences:
a. 
Outside of the shoreline jurisdiction; or
b. 
Landward of water-oriented uses unless it can be shown that such facilities are shoreline dependent.
3. 
Parking areas for shoreline access use are allowed.
4. 
Parking over-water is prohibited.
5. 
Parking lots for shoreline uses must provide access to the shoreline and safe and convenient pedestrian circulation within the parking lot.
6. 
Where feasible, shared parking is preferred for all types of shoreline development.
D. 
Regulations – Airports, Airfields, Airstrips and Runways.
1. 
New airports, airfields, airstrips, and runways are prohibited except airstrips on non-ferry-served islands may be allowed on private property with a conditional use permit.
2. 
Existing airports, airfields, airstrips and runways may be repaired, maintained or expanded consistent with the provisions of SJCC § 18.50.090.
E. 
Regulations – Ferry Terminals. Ferry terminals and their related parking lots shall be located, designed, and constructed to result in no net loss of shoreline ecological functions.
F. 
Regulations – County Docks.
1. 
Overnight moorage is prohibited at County docks.
2. 
County docks must be designed and located to increase public access and result in no net loss of shoreline ecological functions.
G. 
Regulations – Float Plane Facilities.
1. 
Use of docks for scheduled commercial float plane service, meaning five or more round trips per week according to a published schedule, is only allowed in public or private marinas, or established port areas, with a shoreline conditional use permit.
2. 
Regular use of docks for float plane access or moorage is allowed only at public or private marinas, port areas, or private and community docks with a shoreline conditional use permit.
3. 
Use of docks and marinas for irregular float plane service is allowed.
4. 
Shoreline conditional use permit applications for float plane use will include the following conditions:
a. 
Taxiing patterns must minimize noise impacts on area residents and wildlife, and interference with navigation and moorage;
b. 
Fuel and oil spill clean-up plans and materials, and fire-fighting equipment are required on site. Spill response equipment must be commensurate with the size of the facility and float plane use; and
c. 
Specific hours of the day in which float plane access is allowed.
5. 
Float plane access is prohibited at County road ends and parks, and freshwater shorelines where public shoreline access exists.
H. 
Regulations – Barge Landing Sites and Facilities.
1. 
New temporary barge landing sites require a certificate of exemption but are exempt from a shoreline substantial development permit. These sites shall not exceed 12 landings in any 24-month period and must be operated in a manner that will result in no net loss of shoreline ecological functions. Existing nonconforming temporary barge landing sites do not require a certificate of exemption if the proposed use is consistent with the historic transport of cargo at the site and frequency of the historic use.
2. 
New permanent barge landing sites and facilities require a shoreline conditional use permit. The shoreline conditional use permit will not be approved unless the applicant can demonstrate that:
a. 
The use of barge landing sites and facilities existing on the date of application is not feasible;
b. 
An alternative access is not feasible; and
c. 
The proposed barge landing schedule will minimize negative off-site impacts.
3. 
All barge landing sites and facilities shall be located, designed, constructed, and maintained in a manner that results in no net loss of shoreline ecological functions and maximizes the opportunity to serve multiple users on an island.
4. 
The use of an unimproved beach as an emergency landing site is allowed. The shoreline exemption required by SJCC § 18.50.050 may be processed after the landing activity. Within seven days of the emergency, the agency or person who undertook the landing(s) shall report to the director the extent of the emergency actions and any adverse impacts to shoreline ecological functions caused by the actions. The agency or person who undertook the action is required to mitigate adverse impacts in accordance with the requirements of SJCC § 18.50.110 through § 18.50.160.
5. 
Notice of Barge Landing. Prior to landing a barge at an existing nonconforming temporary barge landing site, the operator must submit a notice of barge landing to the department on forms specified by the director. The notice must be submitted at least 10 business days prior to the landing.
6. 
The department shall maintain a list of existing nonconforming barge landing sites. The list shall be updated and published annually. Additions or deletions from the list shall be by director's administrative determination pursuant to SJCC § 18.10.030(B).
I. 
Regulations – Public Pedestrian Trails.
1. 
Public pedestrian trails shall be aligned to avoid or minimize adverse impacts on shoreline ecological functions.
2. 
Public pedestrian trails shall be constructed consistent with local, state and federal standards.
J. 
Regulations by Designation.
1. 
Rural Residential. Roads are allowed where no feasible alternative exists. Permanent barge landing sites and facilities are prohibited unless a need has been established by monitoring the use of temporary barge landing sites and a conditional use permit is obtained.
2. 
Conservancy and Rural Farm Forest.
a. 
Public pedestrian trails are allowed in these designations.
b. 
Roads and parking lots serving allowed uses may be allowed if no feasible alternative exists with a shoreline substantial development permit.
c. 
Ferry terminals and scheduled commercial or regular use float planes may be allowed as a conditional use if it can be shown that no feasible alternative exists and that the public interest would be better served by construction of the facility.
d. 
Barge landing sites and facilities may be allowed in the conservancy designation if the site will serve multiple users on the island affected, and the applicant demonstrates that conservancy shoreline resources will not be materially harmed. Permanent barge landing sites require a shoreline conditional use permit and temporary barge landing sites require a certificate of exemption.
e. 
Other transportation facilities are prohibited.
3. 
Natural. With the exception of public pedestrian trails, transportation facilities are prohibited in this designation. Parking lots are prohibited unless there is no feasible alternative and a conditional use permit is obtained.
4. 
Aquatic. Transportation facilities in this designation are limited to facilities serving waterborne traffic such as ferries, boats, kayaks, barges, and float planes.
(Ord. 1-2016 § 61; Ord. 11-2017 § 25; Ord. 8-2020 § 11)
A. 
Regulations – General.
1. 
Utility transmission and distribution lines, pipelines, cables, stations, plants, and other apparatus including utility infrastructure for sewer, water, stormwater, power, solid waste, telecommunications, plants, stations and processing operations shall not be installed in the shoreline jurisdiction unless there is no feasible alternative.
2. 
Land based utility transmission and distribution lines, pipelines, and cables must be placed underground unless demonstrated to be infeasible. Such lines must utilize existing easements, rights-of-way and trails existing on the date of the application whenever feasible. Applications for new utility corridors in shoreline jurisdiction that include water crossings must demonstrate that use of corridors existing on the date of the application is infeasible.
3. 
Utility developers must coordinate with government agencies to allow multiple uses of utility sites and rights-of-way. Multiple uses of utility sites might include shoreline access points, public pedestrian trails, and other forms of recreation and transportation systems if such uses will not unduly interfere with utility operations or endanger public health and safety.
4. 
Where installation of utility transmission and distribution lines, pipelines, cables, stations, plants, or other apparatus including utility infrastructure for sewer, water, stormwater, power, solid waste, telecommunications, plants, stations and processing operations is approved, clearing is limited to that needed to permit the installation and to prevent interference by vegetation once the system is in operation.
5. 
Where utility transmission and distribution lines, pipelines, cables, or other apparatus including utility infrastructure for sewer, water, stormwater, power, solid waste, telecommunications, plants, stations and processing operations must cross shoreline areas, the route selected must cause the least damage to shoreline aesthetics and shoreline ecological functions.
6. 
Drainage and surface runoff from utility installation areas shall be controlled to prevent pollutants from being carried into water bodies.
7. 
Applications for outfalls and underwater pipelines that transport substances harmful or potentially harmful to aquatic life or water quality will not be approved unless the applicant has demonstrated that it will result in no net loss of shoreline ecological functions.
8. 
All utilities shall be located, designed, constructed and managed in a manner that will result in no net loss of shoreline ecological functions.
9. 
New outfalls of a domestic or industrial sewage treatment facility are allowed to be constructed within one-half mile of a marina with a conditional use permit.
B. 
Regulations – Desalination.
1. 
Desalination systems are allowed as the primary water supply for new and existing land divisions or other development projects within the shoreline. Such facilities may be allowed for the purpose of supplying water for an established community water system.
2. 
Desalination lines must be connected to existing docks, ramps, stairways, or other structures where feasible.
3. 
Desalination systems on shorelines must be designed to result in no net loss of shoreline ecological functions.
4. 
All desalination systems must be located and designed to blend in with the natural surroundings to the extent feasible to reduce visual impacts. Existing vegetation and terrain features existing at the time of the application must be used for screening.
5. 
Desalination systems must not impede public access to public tidelands or interfere with normal public use of waters of the state.
6. 
Desalination systems with an intake of greater than 100,000 gallons per day are prohibited unless a detailed assessment of the conditions of the site and a mitigation analysis, consistent with SJCC § 18.50.140, § 18.50.150 and § 18.50.160, demonstrates that the project will result in no net loss of shoreline ecological functions.
7. 
Desalination system installations shall comply with the following regulations:
a. 
Intake and discharge lines must be trenched, run, or located together except where necessary to provide adequate separation between intake and discharged water;
b. 
Intake and discharge lines must not interfere with normal public use of waters of the state;
c. 
The intake point shall not float on the surface;
d. 
Intake and discharge lines must not be placed through or over any known or discovered archaeological resources, unless the location is approved by DAHP;
e. 
The use of wells with salt water contamination or intrusion as the intake source for desalination or reverse osmosis systems is prohibited unless specifically authorized by the County department of health and community services; and
f. 
When feasible, all cleaning of desalination systems and equipment must take place off site and ensure that cleaning chemicals are not inadvertently introduced into marine waters.
C. 
Regulation by Designation.
1. 
Conservancy. Utility transmission, distribution, or collection facilities are allowed in this designation; provided, that the applicant demonstrates that no feasible alternative exists.
2. 
Natural. Utility facilities are prohibited in this designation; except that facilities that must cross the shoreline in order to cross a water body may be installed underground if no feasible alternative location exists. Desalination systems are allowed in this designation for a single-family residence or to serve another use allowed in the natural designation.
3. 
Aquatic. Utility transmission and collection facilities are allowed in this designation if no feasible alternative exists.
(Ord. 1-2016 § 62)
A. 
Applicability. This section regulates the designation, construction and expansion of the following:
1. 
Facilities serving the public identified in Element 3 of the Comprehensive Plan as shoreline essential public facilities (EPFs).
2. 
New or existing water-dependent facilities serving the public that are not identified in the Comprehensive Plan as a shoreline EPF but are designated as a shoreline EPF following the completion of the process in subsection (B) of this section.
B. 
Shoreline EPF Designation Process.
1. 
If proposed water-dependent facilities cannot meet the development regulations, the County council may designate the facility as a shoreline EPF.
2. 
To obtain a shoreline EPF designation, the applicant must submit a written request to the department. Shoreline EPF requests must include the following:
a. 
A conceptual description of the facility;
b. 
A conceptual site plan;
c. 
Identification of potential sites;
d. 
An explanation of how and why the facility is water-dependent;
e. 
An analysis of the demand for the facility;
f. 
An analysis showing why the existing facilities are inadequate to meet expected demand; and
g. 
A preliminary development schedule.
3. 
After a shoreline EPF designation request is received, the County council will hold a public meeting to review the request. Where potential sites are identified, notices will be mailed to all property owners within 1,000 feet of the sites' parcel boundaries.
4. 
Following the public meeting, the County council may adopt a resolution designating the facility a shoreline EPF if it is consistent with the Comprehensive Plan.
5. 
Designated shoreline EPFs may be developed or expanded with a conditional use permit.
(Ord. 1-2016 § 63)
A. 
Regulations.
1. 
Shoreline habitat and natural systems enhancement projects must:
a. 
Establish, restore or enhance shoreline habitat;
b. 
Be consistent with the objectives and policies of the County's restoration plan;
c. 
Be designed using the best available scientific and technical information, and implemented using best management practices;
d. 
Not adversely affect shoreline ecological functions and processes;
e. 
Not significantly interfere with public use of the navigable waters of the state without appropriate mitigation or must demonstrate that interference with the public use of the navigable waters of the state will be mitigated; and
f. 
Demonstrate that changes in littoral drift will not adversely affect adjacent properties or habitats.
2. 
Shoreline habitat and natural systems enhancement applications will not be approved unless the applicant demonstrates that the project:
a. 
Will occur at a time of year that will not impact spawning, nesting, or breeding;
b. 
Will increase ecological functions that have been identified as degraded at the project site; and
c. 
Is approved by DNR if it is located on state owned aquatic lands.
3. 
Shoreline habitat and natural systems enhancement projects are prohibited where littoral drift of the project materials might adversely affect adjacent spawning grounds or other areas of biological significance.
B. 
Natural Beach Enhancement Projects.
1. 
Design alternatives for natural beach enhancement projects shall include appropriate best management practices and available technology such as:
a. 
Gravel berms, drift sills, beach nourishment, and beach enhancement; and
b. 
Plantings of nontoxic native vegetation suited to the habitat characteristics of the site.
2. 
Natural beach enhancement shall not:
a. 
Detrimentally interrupt littoral drift or redirect waves, current, or sediments to other shorelines;
b. 
Result in any exposed groin-like structures except small drift sill groins may be used as a means of stabilizing restored sediment if they are part of a beach restoration program;
c. 
Extend waterward more than the minimum amount necessary to implement the enhancement plan;
d. 
Result in contours sufficiently steep to impede pedestrian passage or trap drifting sediments;
e. 
Create additional dry land mass that could be developed; or
f. 
Permanently disturb shallow water forage fish or wildlife habitat, unless the habitat is immediately replaced by a new enhanced habitat.
3. 
Natural beach enhancement projects must comply with the following construction standards:
a. 
The size or mix of new materials to be added to a beach shall be as similar as possible to the natural beach sediment, but large enough to resist normal current, wake or wave action at the site; and
b. 
The enhanced beach shall approximate the natural beach profile (width, height, and bulk).
C. 
Regulations by Designation.
1. 
Conservancy. Shoreline restoration and beach enhancement are allowed in this designation if shoreline values and functions are protected or enhanced.
2. 
Natural. Shoreline restoration and beach enhancement are prohibited in this designation unless the proposal is to restore natural conditions.
3. 
Aquatic. Shoreline restoration and beach enhancement are allowed in this designation subject to the regulations of the most restrictive abutting shoreline designation. Where the proposed site abuts more than one shoreline designation, the regulations of the most restrictive abutting designation govern.
(Ord. 1-2016 § 65; Ord. 11-2017 § 26)
A. 
In addition to the general and specific standards established in Article III of this chapter, for development, uses, structures and activities, Table 18.50.600 indicates if a development, use, structure or activity:
1. 
Is allowed;
2. 
Is prohibited;
3. 
Requires a shoreline substantial development permit;
4. 
Requires a shoreline conditional use permit; or
5. 
Is subject to other certificates or conditions.
B. 
Certain shoreline developments, uses, structures and activities in some shoreline designations are subject to additional regulations. They are marked with an asterisk in Table 18.50.600. A use not named or contemplated in this chapter may be allowed subject to a conditional use permit.
C. 
Legend for Table 18.50.600, Shoreline development, uses, structures and activities by designation:
SD
=
Subject to shoreline substantial development permit unless exempt per subsection (B) of this section.
CUP
=
Conditional use permit.
No
=
Prohibited; the use is not eligible for a variance or conditional use permit.
NA
=
Not applicable.
*
=
See the specific regulations for the shoreline designation or type of use in Article III of this chapter.
Table 18.50.600. Shoreline development, uses, structures and activities by designation
Natural
Conservancy
Rural
Rural Farm Forest
Rural Residential
Urban
Port, Marina and Marine Transportation
Aquatic
Agriculture
CUP*
SD
SD
SD
SD
SD
No
NA
Aquaculture
General aquaculture
SD*
SD*
SD
SD
SD*
SD
No
SD*
Small scale shellfish aquaculture
*
*
*
*
*
CUP
No
*
Noncommer-cial freshwater hatcheries
SD*
SD*
SD*
SD*
No
SD*
No
NA
Finfish net pens
No
No
No
No
No
No
No
No
Commercial geoduck aquaculture
CUP
CUP
CUP
CUP
CUP
CUP
No
CUP
Over-Water Structures1 Including Boating Facilities
Ports and water-related port facilities
No
No
No*
No*
No
CUP
SD
SD*
Marina
No
No
SD
No*
No
SD
SD
SD
Boating facilities
No
CUP
SD
SD
SD
SD
SD
SD
Single-family, noncommer-cial and community use docks, moorage floats and recreation floats
No
SD
SD
SD
SD
SD
SD
SD
Ramps and marine railway and associated boathouses
No
CUP
SD
CUP
CUP
SD
SD
SD
Mooring buoy
NA
NA
NA
NA
NA
NA
NA
SD
Break-waters, Jetties and Groins1
Breakwater (lakes)
No
SD
SD
SD
SD
SD
SD
NA
Breakwater (marine)
No
CUP*
CUP
CUP
CUP
CUP
CUP
NA
Jetties and groins
No*
No*
CUP
CUP
CUP
CUP
CUP
CUP
Breakwaters, jetties and groins for shoreline restoration projects
SD
SD
SD
SD
SD
SD
SD
SD
Commercial Develop-ment
Water-dependent uses
No
SD*/CUP*
CUP*
No*
No*
SD*
SD*
SD*
Water-related uses
No
SD*/CUP*
CUP*
No*
No*
SD*
SD*
SD*
Water-enjoyment uses
No
SD*/CUP*
CUP*
No*
No*
SD*
SD*
SD*
Non-water-oriented uses*
No
No
No*/CUP*
No*
No*
SD*
No
CUP
Mixed use commercial
No
SD/CUP*
CUP*
No*
No*
SD*
SD*
SD*
Mixed use residential
No
SD
CUP
No
No
SD*
CUP
NA
Dredging and Dredge Material Disposal
Dredging
No
SD*
SD*
SD*
SD*
SD
SD
SD
Dredge material disposal, in-water
No
No*
SD*
SD*
SD*
SD
SD
No
Dredge material disposal, upland
No
No
SD*
SD*
SD*
SD
SD
NA
Dredging or dredge material disposal associated with restoration
No
No
SD*
SD*
SD*
SD
SD
SD*
Clearing, Grading, Fill, and Excavation
Clearing
SD*
SD*
SD
SD*
SD*
SD*
SD*
NA
Grading
SD*
SD*
SD*
SD*
SD*
SD*
SD*
NA
Fill
No
No
SD*
SD*
SD*
SD*
SD
CUP
Excavation
No
SD
SD
SD
SD
SD
SD
CUP
Essential Public Facilities
Essential public facilities
No
CUP
CUP
CUP
CUP
CUP
SD
CUP
Flood Hazard Reduction
Dikes, levees, revet-ments, flood walls and channel realignments
CUP
CUP
CUP
CUP
CUP
CUP
CUP
NA
Forest Practices
Commercial forestry1, 3
CUP*
SD
SD*
SD
CUP
CUP
No
No
Log transfer sites, facilities and storage1, 3
No
CUP*
SD*
SD*
CUP*
CUP
CUP
CUP*
Industrial Develop-ment1
Water-dependent uses
No
No
CUP*
No*
No
SD
SD*
SD*
Water-related uses
No
No
CUP1
No*
No
SD
No
No
Processing aquacultural products
No
CUP
CUP
CUP
CUP
No
CUP
NA
Non-water-oriented uses
No
No
No
No
No
No
No
No
Institutional Develop-ment1, 2
Water-dependent uses
No
SD*/CUP*
CUP*
No*
No*
SD*
SD*
SD*
Water-related uses
No
SD*/CUP*
CUP*
No*
No*
SD*
SD*
SD*
Water-enjoyment uses
No
SD*/CUP*
CUP*
No*
No*
SD*
SD*
SD*
Non-water-oriented uses
No
No
No*/CUP*
No*
No*
SD*
No
CUP
Mineral Extraction1
Mineral extraction
No
No
SD*
No
No
SD
No
No
Recreational Develop-ment1, 2
Water-oriented
SD*
SD/CUP*
SD/CUP if Commer-cial
SD*
SD*
SD
SD
SD*
Public park without camping facilities
SD
SD
SD
SD
SD
SD
SD
SD
Public park with camping facilities
SD
SD*
SD
No
No
SD
SD
SD
Private campground
SD*
SD/CUP*
SD
No
No
SD
SD
No
Residential Develop-ment2
Single-family7
No*
SD
SD
SD
SD
SD
SD
No*
Multifamily
No
SD
SD
SD
SD
SD
SD
No
Over-water
No
No
No
No
No
No
No
No
Live aboard vessels
No
No
No
No
No
No
SD
No
Vacation rentals2
No*
No
CUP*
SD
SD
SD
SD
No
Private Pedestrian Pathways, Stairways and Ramps
Private pedestrian pathways, stairways and ramps
No
SD
SD
SD
SD
SD
SD
No
Shoreline Habitat and Natural Systems Enhance-ment Projects4
Shoreline habitat and natural systems enhancement projects
SD*
SD
SD
SD
SD
SD
SD
SD
Structural Shoreline Stabiliza-tion5
New hard structural shoreline stabilization
No
SD*
SD*
SD*
SD*
SD*
SD*
SD*
New soft structural shoreline stabilization
No
SD*
SD*
SD*
SD*
SD*
SD*
SD*
Signs
Signs
No*
SD*
SD*
SD
SD*
SD
SD
No*
Transporta-tion and Parking
Airports
No
No
No
No
No
No
No
No
Barge landing sites, permanent
No
CUP*
CUP
CUP*
CUP
CUP
CUP
NA
Barge landing sites, temporary
No
*
*
*
*
*
*
*
Ferry terminals
No
CUP*
CUP
CUP*
CUP
CUP
SD
CUP*
Float planes, commercial or regular use
No
CUP
CUP
CUP
CUP
CUP
CUP
CUP
Parking lots
No*
SD*
SD
SD*
SD*
SD
SD
No
Parking areas
No
SD
SD
SD
SD
SD
SD
NA
Roads
No
SD
SD
SD
SD
SD
SD
NA
Shoreline access points
SD
SD
SD
SD
SD
SD
SD
Yes
Public pedestrian trails7
SD
SD
SD
SD
SD
SD
SD
NA
Other transporta-tion facilities
SD
No
SD
No
SD
SD
SD
NA
Utilities6
Utility transmission and distribution lines, pipelines, cables, stations, plants, and other apparatus including utility infrastructure for sewer, water, stormwater, power, solid waste, tele-communica-tions, plants, stations and processing operations
No*
SD*
SD
SD
SD
SD
SD
SD
Desalination systems
SD*
SD
SD
SD
SD
SD
SD
SD
Table 18.50.600 Notes.
1. Eastsound subarea plan prohibits:
a. New boating facilities, joint use and private docks;
b. Breakwaters, jetties and groins;
c. Log transfer sites and log storage areas;
d. Industrial development outside of the marina;
e. Mineral extraction;
f. Institutional uses;
g. Recreational development with commercial facilities for overnight camping; and
h. Fill in the conservancy shoreline designation.
2. Shaw Island subarea plan prohibits:
a. Recreational development with commercial facilities for overnight camping;
b. Residential vacation rentals by themselves or in combination with any commercial use;
c. Institutional uses; and
d. New commercial uses.
3. Subject to the general provisions of SJCC § 18.50.450 and § 18.50.480 forest management activities including log handling and storage facilities are allowed in all shoreline designations on Shaw Island.
4. Shoreline habitat and natural systems enhancement projects are a shoreline conditional use within Eastsound subarea plan and are only allowed for public facility or public safety projects.
5. The replacement or expansion of structural shoreline stabilization measures is allowed but is reviewed and permitted as a new structural shoreline stabilization measure.
6. New outfalls of a domestic or industrial sewage treatment facility within one-half mile of a marina may be allowed as a conditional use.
7. The director shall make the final local decisions on administrative shoreline substantial development permit applications for public pedestrian trails and residential accessory structures (except shoreline stabilization, boathouses and over-water structures) that do not meet an exemption threshold in SJCC § 18.50.050.
(Ord. 1-2016 § 66; Ord. 11-2017 § 27; Ord. 8-2020 § 12)