(1)
When road or driveway construction is required by conditions of land development, building permit, special use permit, and other approvals in the Lewis County Code, plans for the proposed improvements shall be prepared meeting all of the requirements in these standards. Failure to provide the requirements set out in this chapter shall constitute an incomplete application and shall not be accepted for review.
(2)
All road construction or reconstruction plans shall be prepared by and bear the stamp of a qualified professional civil engineer, licensed in the state of Washington. Final plans and profile drawings must be accepted by the county engineer prior to the start of construction and recording of the development.
(3)
Construction plans for roads accessing state highways shall be submitted by the applicant's engineer directly to WSDOT. All requirements, signed agreement or approval for the intersection or road approach must be obtained by the applicant before final plan approval will be granted by Lewis County. A copy of the approved plan from WSDOT shall be submitted to Lewis County before final plan approval. Where state requirements exceed these standards, state standards shall govern.
(Ord. 1194 Exh. B, 2007)